Bunker_Renovation_Consept_Plan.pdf
PDF 4 MB Posted
- Attached to
- Los Lagos Golf Course Bunker Renovation
- Solicitation number
- 2025-9
- Issued by
- Hidalgo County, Texas
About this file
The document is a Bunker Renovation Concept Plan for the Los Lagos Golf Club in Edinburg, Texas, prepared by golf course designer Jerry Lemons in December 2024. The plan details comprehensive renovation designs for multiple bunkers across the golf course, with each bunker (numbered #1, #2, #6, #7, #8, #9, #10, #11, #14, #15, #16, #17, and #18) having specific modifications including water diversion strategies, drainage improvements, and precise measurement adjustments. The project involves maintaining similar overall square footage while improving bunker design, with most bunkers experiencing slight reductions in size and strategic repositioning.
The renovation includes significant material requirements, with approximate quantities across all bunkers consisting of 419 Bermudagrass sod (totaling 15,015 sq. ft.), 510 tons of gravel, 230 tons of sand, 1,650 linear feet of internal 4" perforated drainage tile, and 100 linear feet of external 4" solid drainage tile. Each bunker's design focuses on technical improvements such as lowering edges, creating better water diversion around bunkers, establishing clear brow/flash sand lines, and allowing for more efficient maintenance access. The project appears to be a comprehensive upgrade aimed at enhancing the golf course's playability and drainage capabilities while maintaining the existing course layout and overall character.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Los Lagos Golf Club
Edinburg, TX Jerry Lemons Golf Course DesignerScale: 1”=30’
Approximate quantities Use existing drainage if in good use
Jerry Lemons Golf Course Designer
Existing Square Footage: 24,610 sq. ft.
Proposed Square Footage: 23,630 sq. ft.
Approximate quantities
419 Bermudagrass Sod: 15,015 sq. ft.
Gravel: 510 tons Sand: 230 tons Internal Drainage - 4” Perforated Tile: 1,650 LF External Drainage - 4” Solid Tile: 100 LF
Los Lagos Golf Club December 2024
Bunker Renovation Concept Plan
High Point Irrigation Head Limit of Disturbance Drainage to be Added Hydrology
Legend
Bermudagrass
Area of Disturbance
Center Line
Mound to be lowered
Old Bunker
Remove Buildup
Fairway Line
Los Lagos Country Club
Golf Course Designerr
Approximate quantities Use existing drainage if in good use
Scale: 1”=30’
#1
Existing: 2,225 sq. ft.
Proposed: 2,225 sq. ft.
Bermuda Sod: 1,335 sq. ft.
Gravel: 22 tons Sand: 48 tons Int Drainage: 155 LF Ex Drainage: 30 LF
DIVERT WATER
BETWEEN BUNKERS
LOWER EDGE
DIVERT WATER
AROUND BUNKER
BERMUDA LINE
BROW / FLASH
SAND LINE
Golf Course DesignerrScale: 1”=30’
Approximate quantities Use existing drainage if in good use
#2
DIVERT WATER
AROUND BUNKER
DISTURBANCE LINE
LOWER
EDGE
Existing: 1,550 sq. ft.
Proposed: 1,495 sq. ft.
Bermuda Sod: 835 sq. ft.
Gravel: 15 tons Sand: 32 tons Int Drainage: 105 LF Ex Drainage: 10 LF
Golf Course Designerr
Approximate quantities Use existing drainage if in good use
Scale: 1”=30’
#6
Existing: 590 sq. ft.
Proposed: 590 sq. ft.
Bermuda Sod: 425 sq. ft.
Gravel: 6 tons Sand: 13 tons Int Drainage: 40 LF Ex Drainage: 10 LF
DIVERT WATER
AROUND BUNKER
BERMUDA LINE
LOWER
EDGE
Golf Course DesignerrScale: 1”=30’
Approximate quantities Use existing drainage if in good use
#7
LOWER
EDGE
PHASE 2
Existing: 2,675 sq. ft.
Proposed: 2,690 sq. ft.
Bermuda Sod: 1,105 sq. ft.
Gravel: 26 tons Sand: 58 tons Int Drainage: 190 LF Ex Drainage: 20 LF
MOVE BUNKER
FURTHER FROM
GREENDIVERT WATER
AROUND BUNKER
Golf Course Designerr
Approximate quantities Use existing drainage if in good use
Scale: 1”=30’
#8
BROW / FLASH
SAND LINE
MOVE BUNKER
FURTHER FROM
GREEN
DIVERT WATER
AROUND BUNKER
Existing: 2,100 sq. ft.
Proposed: 1,945 sq. ft.
Bermuda Sod: 1,320 sq. ft.
Gravel: 19 tons Sand: 42 tons Int Drainage: 135 LF Ex Drainage: 30 LF
Golf Course DesignerrScale: 1”=30’
Approximate quantities Use existing drainage if in good use
#9
LOWER
EDGE
#16 Landing
Zone
Existing: 580 sq. ft.
Proposed: 580 sq. ft.
Bermuda Sod: 445 sq. ft.
Gravel: 6 tons Sand: 13 tons Int Drainage: 40 LF Ex Drainage: 10 LF
DIVERT WATER
AROUND
BUNKER
BERMUDA
LINE
Golf Course Designerr
Approximate quantities Use existing drainage if in good use
Scale: 1”=30’
#10
DIVERT WATER
BETWEEN
BUNKERS
BROW / FLASH
SAND LINE
Existing: 5,730 sq. ft.
Proposed: 5,320 sq. ft.
Bermuda Sod: 3,590 sq. ft.
Gravel: 52 tons Sand: 115 tons Int Drainage: 365 LF Ex Drainage: 40 LF
PHASE 2
LOWER
EDGE
Golf Course DesignerrScale: 1”=30’
Approximate quantities Use existing drainage if in good use
#11
LOWER
EDGE
Existing: 1,195 sq. ft.
Proposed: 1,195 sq. ft.
Bermuda Sod: 905 sq. ft.
Gravel: 12 tons Sand: 26 tons Int Drainage: 85 LF Ex Drainage: 20 LF
BROW / FLASH
SAND LINE
DIVERT WATER
AROUND
BUNKER
Golf Course Designerr
Approximate quantities Use existing drainage if in good use
Scale: 1”=30’
#14
Existing: 275 sq. ft.
Proposed: 275 sq. ft.
Bermuda Sod: 265 sq. ft.
Gravel: 3 tons Sand: 6 tons Int Drainage: 20 LF Ex Drainage: 10 LF
Golf Course DesignerrScale: 1”=30’
Approximate quantities Use existing drainage if in good use
#15
Existing: 3,730 sq. ft.
Proposed: 3,630 sq. ft.
Bermuda Sod: 1,765 sq. ft.
Gravel: 35 tons Sand: 78 tons Int Drainage: 255 LF Ex Drainage: 20 LF
LOWER
EDGE
DIVERT WATER
AROUND
BUNKER
DISTURBANCE
AREA
Golf Course Designerr
Approximate quantities Use existing drainage if in good use
Scale: 1”=30’
#16
Existing: 720 sq. ft.
Proposed: 720 sq. ft.
Bermuda Sod: 565 sq. ft.
Gravel: 7 tons Sand: 16 tons Int Drainage: 50 LF Ex Drainage: 10 LF
BROW / FLASH
SAND LINE
DIVERT WATER
AROUND BUNKER
Golf Course DesignerrScale: 1”=30’
Approximate quantities Use existing drainage if in good use
#17
Existing: 1,805 sq. ft.
Proposed: 1,530 sq. ft.
Bermuda Sod: 1,470 sq. ft.
Gravel: 15 tons Sand: 33 tons Int Drainage: 105 LF Ex Drainage: 20 LF
DIVERT WATER
BETWEEN
BUNKERS
BROW / FLASH
SAND LINE
LOWER
EDGE
SHRINK BUNKERS
TO ALLOW FOR
MAINTENANCE BETWEEN
Golf Course Designerr
Approximate quantities Use existing drainage if in good use
Scale: 1”=30’
#18
Existing: 1,435 sq. ft.
Proposed: 1,435 sq. ft.
Bermuda Sod: 990 sq. ft.
Gravel: 14 tons Sand: 31 tons Int Drainage: 105 LF Ex Drainage: 30 LF
DIVERT WATER
AROUND
BUNKERS
File details come from the government source that posted it. Updated .