Bunco Road Improvements.pdf
PDF 182 KB Posted
- Attached to
- ID KOOTENAI 5762(1), Bunco Road Improvements
- Solicitation number
- 69056720B000019
About this file
This document contains details for a federal contract opportunity for road improvements in Idaho. The Bunco Road Improvements project involves realigning and reconstructing the Bunco/Nunn Road intersection, correcting super elevation on the Bunco/Bohn Road intersection, paving work, and safety improvements along 5.3 miles of roadway. The work includes clearing and grubbing, excavation and embankment, aggregate base courses, asphalt paving totaling 10,700 tons, pavement markings, signage, erosion control, and traffic control. The estimated price range for the contract is between $2,000,000 and $3,000,000 and the tentative completion date is September 2021. The solicitation number for this opportunity through the Department of Transportation Federal Highway Administration is 69056720B000019.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ID KOOTENAI 5762(1), Bunco Road Improvements
The work consists of Realignment and reconstruction of the Bunco/Nunn Road intersection, super elevation correction on the Bunco/Bohn Road intersection, paving, and safety improvements.
Project length: 5.3 Miles
Tentative Fixed Completion Date: September 2021 (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: between $2,000,000 and $3,000,000
Location: 19 Miles NE of Coeur d’Alene, Idaho
DESCRIPTION OF WORK in US CUSTOMARY UNITS
FP-14
On e S ch ed ul e
Sc h
Na m e
DIVISION 150 – Project Requirements 152 Construction Survey & Staking (yes/no) Yes 153 Contractor Quality Control and Assurance
(yes/no) Yes 154 Contractor Sampling & Testing (yes/no) Yes 155 Schedules for Construction Contracts (construction schedules) (yes/no) Yes 157 Soil Erosion & Sediment Control (erosion control devices)
Fiber Roll & Silt Fence
158 Watering for Dust Control 400 MGAL
DIVISION 200 – Earthwork 201 Clearing & Grubbing 5 Acre 204 Excavation & Embankment 7714 CUYD 211 Roadway Obliteration 5300 SQYD DIVISION 300 – Aggregate and Base Courses 302 Minor Crushed Aggregate 2500 TON 303 Road Reconditioning 27700 LNFT
On e S ch ed ul e
Sc h
Na m e
DIVISION 400 – Asphalt Pavements & Surface Treatments 401 Asphalt Concrete Pavement By Gyratory Mix Design Method 10700 TON 412 Asphalt Tack Coat (asphalt surface treatment) 59 TON 412 Antistrip Additive 110TON
DIVISION 600 – Incidental Construction 622 Rental Equipment (yes/no) Yes 623 General Labor (yes/no) Yes 624 Topsoil (landscaping & related items) 1700 CUYD 625 Turf Establishment (indicate seeding or mulching separately) Mulching, dry method 1.2 ACRE 633 Permanent Traffic Control (traffic control devices)-Sign System 29 SQFT 634 Permanent Pavement Markings (traffic pavement markings) 200,000 LNFT 635 Temporary Traffic Control – Flagger Flagger Fixed
Hourly Rate (2000 Hours)
635 Temporary Traffic Control – Pilot Car 120 HOUR
| DIVISION 200 – Earthwork |
| DIVISION 300 – Aggregate and Base Courses |
| DIVISION 400 – Asphalt Pavements & Surface Treatments |
File details come from the government source that posted it. Updated .