File Type Posted
Sources Sought_BLDG 2600_Specifications_B-3 Final_20210311.pdf PDF
Attachment 1 - Sources Sought Information Request.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

RENOVATE O&T BUILDING 2600

166th Airlift Wing, Delaware Air National Guard, New Castle, DE

Project Number: JLWS 182006

INTRODUCTION

The work to be performed under this contract shall result in the renovation of the Reserve Operational Training facility making room for additional functions to relocate to Building 2600. The detailed extent of the renovation is further described in the scope of work below and in the attached drawings and specifications.

SCOPE OF WORK

GENERAL DESCRIPTION OF WORK: Under the terms of this contract, the contractor shall accomplish the tasks associated with the renovation of the Reserve Operational Training Facility, Building 2600, at the 166th Airlift Wing. The contractor shall create open office architecture through removal of interior walls, renovate throughout to include new HVAC distribution, installation of electrical, mechanical, plumbing, fire suppression and an ABA compliant elevator IAW the detailed specifications. The scope also includes replacing the primary roof, providing new floor finishes, replacing ceilings damaged by roof leaks, installation of fire sprinkler piping, replacing doors and windows to meet AT/FP requirements, providing temporary facilities and tie-in existing utilities for displaced personnel, creation of as-built drawings and any other associated work required to deliver the scope of work.

ANTITERRORISM/OPERATION SECURITY (AT/OPSEC) REQUIREMENTS

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the PM or Antiterrorism Representative. AT Level I awareness training is available at the following website:

http://jko.jten.mil.

CONTRACT REQUIREMENTS

The specific requirements and materials to be used in the execution of this contract are provided in the following pages of this document. Contractor is expected to have demonstrated experience with the renovation of office buildings.

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY

01 25 00 SUBSTITUTION PROCEDURES

01 26 00 CONTRACT MODIFICATION PROCEDURES

01 29 00 PAYMENT PROCEDURES

01 31 00 PROJECT MANAGEMENT AND COORDINATION

01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

01 33 00 SUBMITTAL PROCEDURES

01 40 00 QUALITY REQUIREMENTS

01 42 00 REFERENCES

01 45 36 STATEMENT OF SPECIAL INSPECTIONS

01 45 37 SCHEDULE OF SPECIAL INSPECTIONS

01 50 00 TEMPORARY FACILITIES AND CONTROLS

01 60 00 PRODUCT REQUIREMENTS

01 73 00 EXECUTION

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 77 00 CLOSEOUT PROCEDURES

01 78 23 OPERATION AND MAINTENANCE DATA

01 78 39 PROJECT RECORD DOCUMENTS

01 81 13.63 SUSTAINABLE DESIGN REQUIREMENTS - GBCI GUIDING PRINCIPLES

01 91 13 GENERAL COMMISSIONING REQUIREMENTS

Facility Construction Subgroup

DIVISION 02 - EXISTING CONDITIONS

02 41 19 SELECTIVE DEMOLITION

DIVISION 03 - CONCRETE

03 10 00 CONCRETE FORMING AND ACCESSORIES

03 20 00 CONCRETE REINFORCING

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 01 20.64 BRICK MASONRY REPOINTING

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL FRAMING

05 31 00 STEEL DECKING

05 40 00 COLD-FORMED METAL FRAMING

05 50 00 METAL FABRICATIONS

05 51 13 METAL PAN STAIRS

05 53 13 BAR GRATINGS

05 73 00 DECORATIVE METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 16 00 SHEATHING

06 40 23 INTERIOR ARCHITECTURAL WOODWORK

06 41 16 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 PREPARATION FOR REROOFING

07 21 00 THERMAL INSULATION

07 21 19 FOAMED-IN-PLACE INSULATION

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 42 13.19 INSULATED METAL WALL PANELS

07 54 19 POLYVINYL-CHLORIDE (PVC) ROOFING

07 62 00 SHEET METAL FLASHING AND TRIM

07 72 00 ROOF ACCESSORIES

07 72 10 ROOFTOP FALL ARREST SYSTEM

07 84 13 PENETRATION FIRESTOPPING

07 84 43 JOINT FIRESTOPPING

07 92 00 JOINT SEALANTS

07 92 19 ACOUSTICAL JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 HOLLOW METAL DOORS AND FRAMES

08 14 16 FLUSH WOOD DOORS

08 33 13 COILING COUNTER DOORS

08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS

08 62 00 UNIT SKYLIGHTS

08 71 00 DOOR HARDWARE

08 80 00 GLAZING

08 88 13 FIRE-RATED GLAZING

08 91 19 FIXED LOUVERS

DIVISION 09 - FINISHES

09 22 16 NON-STRUCTURAL METAL FRAMING

09 29 00 GYPSUM BOARD

09 30 13 CERAMIC TILING

09 51 13 ACOUSTICAL PANEL CEILINGS

09 65 13 RESILIENT BASE AND ACCESSORIES

09 65 19 RESILIENT TILE FLOORING

09 65 36 STATIC-CONTROL RESILIENT FLOORING

09 68 13 TILE CARPETING

09 91 14 EXTERIOR PAINTING (MPI STANDARDS

09 91 23 INTERIOR PAINTING

DIVISION 10 - SPECIALTIES

10 14 23.16 ROOM IDENTIFICATION PANEL SIGNAGE

10 21 13.17 PHENOLIC-CORE TOILET COMPARTMENTS

10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES

10 44 13 FIRE PROTECTION CABINETS

10 44 16 FIRE EXTINGUISHERS

DIVISION 11 -

11 52 13 PROJECTION SCREENS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 36 61.16 SOLID SURFACING COUNTERTOPS

DIVISION 14 - CONVEYING EQUIPMENT

14 24 00 HYDRAULIC ELEVATORS

14 42 00 WHEELCHAIR LIFTS

Facility Services Subgroup

DIVISION 21 - FIRE SUPPRESSION

21 05 18 ESCUTCHEONS FOR FIRE-SUPPRESSION PIPING

21 05 23 GENERAL-DUTY VALVES FOR WATER-BASED FIRE-SUPPRESSION PIPING

21 05 29 HANGERS AND SUPPORTS FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT

21 05 53 IDENTIFICATION FOR FIRE-SUPPRESSION PIPING AND EQUIPMENT

21 11 19 FIRE DEPARTMENT CONNECTIONS

21 13 13 WET-PIPE SPRINKLER SYSTEMS

DIVISION 22 - PLUMBING

22 05 13 COMMON MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT

22 05 17 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING

22 05 19 METERS AND GAGES FOR PLUMBING PIPING

22 05 23.12 BALL VALVES FOR PLUMBING PIPING

22 05 23.14 CHECK VALVES FOR PLUMBING PIPING

22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

22 07 19 PLUMBING PIPING INSULATION

22 11 13 FACILITY WATER DISTRIBUTION PIPING

22 11 16 DOMESTIC WATER PIPING

22 11 19 DOMESTIC WATER PIPING SPECIALTIES

22 11 23.21 INLINE, DOMESTIC-WATER PUMPS

22 13 16 SANITARY WASTE AND VENT PIPING

22 13 19 SANITARY WASTE PIPING SPECIALTIES

22 13 19.13 SANITARY DRAINS

22 14 29 SUMP PUMPS

22 33 00 ELECTRIC, DOMESTIC-WATER HEATERS

22 34 00 FUEL-FIRED, DOMESTIC-WATER HEATERS

22 42 13.13 COMMERCIAL WATER CLOSETS

22 42 13.16 COMMERCIAL URINALS

22 42 16.13 COMMERCIAL LAVATORIES

22 42 16.16 COMMERCIAL SINKS

22 42 23 COMMERCIAL SHOWERS

22 47 16 PRESSURE WATER COOLERS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

23 05 17 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING

23 05 19 METERS AND GAGES FOR HVAC PIPING

23 05 23.13 BUTTERFLY VALVES FOR HVAC PIPING

23 05 23.14 CHECK VALVES FOR HVAC PIPING

23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC

23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 13 DUCT INSULATION

23 07 19 HVAC PIPING INSULATION

23 09 23 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC

23 11 23 FACILITY NATURAL-GAS PIPING

23 21 13 HYDRONIC PIPING

23 21 16 HYDRONIC PIPING SPECIALTIES

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 31 13 METAL DUCTS

23 33 00 AIR DUCT ACCESSORIES

23 33 46 FLEXIBLE DUCTS

23 36 00 AIR TERMINAL UNITS

23 37 13.13 AIR DIFFUSERS

23 37 13.23 REGISTERS AND GRILLES

23 52 16 CONDENSING BOILERS

23 62 00 PACKAGED COMPRESSOR AND CONDENSER UNITS

23 73 13.13 INDOOR, BASIC AIR-HANDLING UNITS

23 74 33 DEDICATED OUTDOOR-AIR UNITS

23 81 26 SPLIT-SYSTEM AIR-CONDITIONERS

DIVISION 26 - ELECTRICAL

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 23 CONTROL-VOLTAGE ELECTRICAL POWER CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING

26 05 48 VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 05 73.13 SHORT-CIRCUIT STUDIES

26 05 73.16 COORDINATION STUDIES

26 05 73.19 ARC-FLASH HAZARD ANALYSIS

26 09 13 ELECTRICAL POWER MONITORING AND CONTROL.

26 09 23 LIGHTING CONTROL DEVICES

26 09 43.23 RELAY-BASED LIGHTING CONTROLS

26 22 13 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS

26 24 16 PANELBOARDS

26 27 26 WIRING DEVICES

26 28 13 FUSES

26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS

26 33 23.11 CENTRAL BATTERY EQUIPMENT FOR EMERGENCY LIGHTING

26 41 13 LIGHTNING PROTECTION FOR STRUCTURES

26 43 13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

26 51 19 LED INTERIOR LIGHTING

26 52 13 EMERGENCY AND EXIT LIGHTING

26 56 19 LED EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS

27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS

27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS

27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

27 05 44 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS AND

CABLING

27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS

27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS

27 11 16 COMMUNICATIONS RACKS, FRAMES, AND ENCLOSURES

27 13 13 COMMUNICATIONS COPPER BACKBONE CABLING

27 13 23 COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING

27 13 33 COMMUNICATIONS COAXIAL BACKBONE CABLING

27 15 13 COMMUNICATIONS COPPER HORIZONTAL CABLING

27 15 23 COMMUNICATIONS OPTICAL FIBER HORIZONTAL CABLING

27 15 33 COMMUNICATIONS COAXIAL HORIZONTAL CABLING

27 51 16 PUBLIC ADDRESS SYSTEMS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 46 21.11 ADDRESSABLE FIRE-ALARM SYSTEMS

28 47 00 MASS NOTIFICATION

Site and Infrastructure Subgroup

DIVISION 31 - EARTHWORK

31 20 00 EARTH MOVING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 91 13 SOIL PREPARATION

32 92 00 TURF AND GRASSES

END OF TABLE OF CONTENTS