Build American Buy American Act (BABA Act) Language.pdf

PDF 99 KB Posted

Attached to
Climate Program Office FY 2023
Opportunity number
NOAA-OAR-CPO-2023-2007440
Issued by

About this file

Build American Buy American Act (BABA Act) Language

View the file

Other files

File Type Posted
NOAA-OAR-CPO-2023-2007440 NOFO Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUIRED USE OF AMERICAN IRON, STEEL, MANUFACTURED PRODUCTS, AND CONSTRUCTION

MATERIALS.

If applicable, and pursuant to the Infrastructure Investment and Jobs Act (“IIJA”), Pub.L. No. 117-58, which includes the Build American, Buy American (BABA) Act, Pub. L. No. 117-58, §§ 70901-52 and OMB

M-22-11, recipients of an award of Federal financial assistance from the Department of Commerce

(DOC) are hereby notified that none of the funds provided under this award may be used for a project for infrastructure unless: 1) all iron and steel used in the project are produced in the United States–this means all manufacturing processes, from the initial melting stage through the application of coatings, occurred in the United States; 2) all manufactured products used in the project are produced in the

United States—this means the manufactured product was manufactured in the United States; and the cost of the components of the manufactured product that are mined, produced, or manufactured in the

United States is greater than 55 percent of the total cost of all components of the manufactured product, unless another standard for determining the minimum amount of domestic content of the manufactured product has been established under applicable law or regulation; and 3) all construction materials1 are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States. The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project.

As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a

Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

WAIVERS. When necessary, recipients may apply for, and DOC may grant, a waiver from these requirements. DOC will notify the recipient for information on the process for requesting a waiver from these requirements. 1) When DOC has made a determination that one of the following exceptions applies, the awarding official may waive the application of the domestic content procurement preference in any case in which DOC determines that: a. applying the domestic content procurement preference would be inconsistent with the public interest; b. the types of iron, steel, manufactured products, or construction materials are not produced in the United States in sufficient and reasonably available quantities or of a satisfactory quality; or c. the inclusion of iron, steel, manufactured products, or construction materials produced in the United States will increase the cost of the overall project by more than 25 percent. A request to waive the application of the domestic content procurement preference must be in writing. DOC will provide instructions on the format, contents, and supporting materials required for any waiver request. Waiver requests are subject to public comment periods of no less than 15 days and must be reviewed by the Made in America Office. There may be instances where an award qualifies, in whole or in part, for an existing waiver described at whitehouse.gov/omb/management/made-in-america.

DEFINITIONS. “Construction materials” includes an article, material, or supply—other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives2 —that is or consists primarily of: non-ferrous metals; plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); glass (including optic glass); lumber; or drywall.

“Domestic content procurement preference’’ means all iron and steel used in the project are produced http://whitehouse.gov/omb/management/made-in-america in the United States; the manufactured products used in the project are produced in the United States;

or the construction materials used in the project are produced in the United States. “Infrastructure” includes, at a minimum, the structures, facilities, and equipment for, in the United States, roads, highways, and bridges; public transportation; dams, ports, harbors, and other maritime facilities;

intercity passenger and freight railroads; freight and intermodal facilities; airports; water systems, including drinking water and wastewater systems; electrical transmission facilities and systems; utilities;

broadband infrastructure; and buildings and real property. Infrastructure includes facilities that generate, transport, and distribute energy. ‘‘Project’’ means the construction, alteration, maintenance, or repair of infrastructure in the United States. -- 1 Excludes cement and cementitious materials, aggregates such as stone, sand, or gravel, or aggregate binding agents or additives. 2 IIJA, § 70917(c)(1).

File details come from the government source that posted it. Updated .