Build 641 PANMCC-25-P-0000 019929 Pre-Splic.pdf

PDF 45 KB Posted

Attached to
Repair roof of Building 641, Fort Bliss, TX
Solicitation number
PANMCC25P0000019929
Issued by

About this file

This document is a Pre-Solicitation Notice for an Invitation for Bids (IFB) for a firm fixed-price construction contract to replace the roof of Building 641 at Fort Bliss, TX. The project is set aside for HUBZone Small Businesses under NAICS 238160, with an estimated procurement value between $100,000 and $250,000. The scope of work includes wood plank deck replacement, new self-adhering underlayment, and asphalt roof shingles, with a required 30-year manufacturer's warranty and 120-mph wind speed coverage.

The contract will be performed within the Fort Bliss Military Installation, with a 120-calendar day performance period after Notice to Proceed. Contractors must comply with various codes and standards, including ICC, UFC, and NFPA 101. The solicitation is expected to be issued around 30 July 2025, with bid opening date to be determined. Interested parties must be registered in the System for Award Management (SAM) and have a current Online Representations and Certifications Application (ORCA) including NAICS 238160. The point of contact is MAJ Cuong Tran (Contract Specialist) and SFC Shawn Munro (Contracting Officer) from the Mission and Installation Contracting Command (MICC) at Fort Bliss, Texas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subject: Pre-Solicitation Notice - Invitation for Bids (IFB) Firm Fixed Price Construction Contract for roof replacement Building 641 Merritt Rd, Fort Bliss, located within the Fort Bliss TX Installation.

1. The purpose of this memorandum is to issue a pre-solicitation notice for an Invitation for Bids (IFB) firm fixed price construction contract to address the need to repair existing roof system at building 641, northwest side. Work shall include wood plank deck replacement, new self-adhering underlayment and new asphalt roof shingles to match existing. Install in accordance with roofing manufacturer’s recommendations. Provide a 30-year manufacturer’s warranty with a 120-mph wind speed coverage. Building 641 is a historical building. Therefore, the Environmental Division (ED) - Historic Preservation Program shall review and approve all material submittals for accessories, sealants, sheet metal, replacement so it, replacement fascia, paint colors, roof shingles, etc. before contractor can start work. The Contractor shall provide all work, labor, materials, related fees, and related services for construction requested herein until completion and acceptance of the entire work, except for any completed unit of work which may have been accepted under the contract, by the Government in a professional and collaborative environment to sustain mission requirements. Construction services and finished products shall be delivered on schedule, safely, and compliant with regulatory codes and standards. The period of performance shall be one hundred and twenty days (120) calendar days after issuance of Notice to Proceed (NTP). The work to be performed under this contract will be performed at Building 641, Merritt Rd, located within the Fort Bliss TX Installation.

2. This acquisition is set aside for HUBZone Small Business under NAICS 238160 (Size Standard $19 Million). The estimated procurement value ranges between $100,000 and $250,000.

3. All work shall adhere to and comply with the most current International Code Council (ICC), the Unified Facilities Criteria (UFC) https://www.wbdg.org/ c/dod/unified-facilities-criteria-ufc [military amended codes], NFPA 101 Life Safety Code, the Architectural Barriers Act (ABA) and all other Local, State and Federal Regulations, Codes, and Standards. All Unified Facilities Guide Specifications (UFGS) shall be used for this project (https://www.wbdg.org/guides-specifications). The Contractor shall provide all labor, supervision, transportation, vehicles, supplies, equipment, materials and services required to perform work under this contract. The Contractor shall, as necessary, provide all equipment needed to perform the work safely and to meet the requirements herein.

4. All work under this contract will be performed within the confines of the Fort Bliss Military Installation, at Fort Bliss, TX. The Wage Determination: General Decision Number:

TX20250245 06/13/2025; Superseded General Decision Number: TX20240245; State:

Texas; Construction Type: Building; County: El Paso County in Texas, will govern work under this contract. The bid guarantee shall be at least 20% of the bid price but not exceed $3,000,000.00, in accordance with FAR 28.101-2. Performance and payment bonds must equal 100 percent of the original contract price.

5. An organized site visit will be conducted, with details available in the solicitation. The tentative date for issuing the solicitation is on or about 30 July 2025, bid opening is to be determined (TBD), and completing contract performance 120 calendar days after NTP under TBD solicitation number.

6. The technical exhibits will be available for inspection without charge through SAM.gov at https://sam.gov. No paper copies of this solicitation are available. Once the solicitation is posted, it is incumbent upon the interested parties to review this site frequently for any updates/amendments to all documents. Interested parties must be currently registered in the System for Award Management (SAM) at https://sam.gov to receive a government contract award. Online Representations and Certifications Application (ORCA) must also be current and include NAICS 238160 to qualify to receive a contract award.

7. The point of contact for this acquisition is MAJ Cuong Tran, Contract Specialist, and SFC Shawn Munro, Contracting O icer. Mission and Installation Contracting Command (MICC) Fort Bliss, Texas.

***Please note no telephone calls/ emails will be answered regarding this announcement ***

File details come from the government source that posted it. Updated .