Budget Template.pdf

PDF 383 KB Posted

Attached to
2019 Thomas R. Pickering Foreign Affairs Fellowship Graduate Program
Opportunity number
SFOP0004203
Issued by

About this file

Budget Template

View the file

Other files

File Type Posted
Q A II April 6 2018.docx DOCX document
Q A April 5 2018 - FINAL for Posting.docx DOCX document
oppSFOP0004203-cfda19.013-cidSFOP0004203-instructions.docx DOCX document
_Financial_Mgmt-Revised to reference 2 CFR 200-.pdf PDF
Budget Guidelines Revised III Jan 2017.pdf PDF
PSIs, Pickering 2019 Final.docx DOCX document
Pickering 2019 NOFO.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Unit Number Amount Rate

A Personnel months or years salary

(monthly)

% effort for

Personnel only

US-Based personnel

Project Manager 0.00 0.00

Project Officer, etc. 0.00 0.00

Field Personnel 0.00 ie , etc. 0.00 0.00 ie , etc. 0.00 0.00

0.00 0.00 0.00

B Fringe Benefits

US-Based Personnel Fringe Benefits 0.00

Field Personnel Fringe Benefits 0.00

0.00 0.00 0.00

C Travel # people # trips/or days unit Cost

Airfare international from -(Country/City to-

Country/City RT) 0.00 0.00

Per diem (Country/City) 0.00

Domestic Travel Only ie local staff per diem for monitoring 0.00

0.00 0.00 0.00

D Equipment (> $5,000 per unit ) # units unit cost

(description, ie generators) 0.00 0.00

(description) 0.00 0.00

0.00 0.00 0.00

E Supplies (< $5,000 per unit) # units unit cost

(description) 0.00

0.00 0.00

F

Sub-Recipient Organizations or Individual Consultants/Outside Experts daily rate

Consultant (specify) daily rate

Consultant Airfare (from/to, one way/RT) 0.00 0.00

Consultant Per diem (Country/City) 0.00 0.00

Subtotal Personnel

Contractual (Subrecipients, Subcontracts, and Consultant fees)

Subtotal Fringe Benefits

Subtotal Travel

Subtotal Equipment

Subtotal Supplies

Program Total

LINE-ITEM BUDGET

Organization, Project Title Project Duration (number of months )

Unit Cost Requested Federal

Funds

Cost-Share by

Applicant

0.00 0.00 0.00

0.00 0.00 0.00

G Contruction

(description) 0.00 0.00 0.00

H Other Direct Costs

0.00

0.00 0.00 0.00

I Total Direct Costs 0.00 0.00 0.00

J Indirect Costs 0.00 0.00 0.00

K Total Project Cost 0.00 0.00 0.00

Sub-Recipient Organization(Name) Total Sub-Award

(NICRA - final, provisional, predetermined) or de minimus flat rate of 10% of MTDC, specify

Subtotal Other Direct Costs

Subtotal Contractual (all sub grantees)

File details come from the government source that posted it.