BSJ Street Sweeping_SOW.pdf
PDF 442 KB Posted
- Attached to
- Street Sweeping Services
- Solicitation number
- 31170PR250000136
About this file
This document is a Scope of Services for RBH Street Sweeping at the U.S. Coast Guard Base in San Juan, Puerto Rico, scheduled for August 2025. The contract requires a contractor to perform monthly street sweeping services for a 1-year base period with an optional follow-on 1-year service period. Key requirements include sweeping all streets, roadways, and parking lots within the base complex, collecting and disposing of debris, and reporting any observed issues like potholes or damaged signs. The contractor must use mechanical broom and vacuum sweepers, complete work within 30 calendar days of award during normal working hours (0800-1700 Monday-Friday), and comply with all applicable federal, state, and local regulations. Mandatory submittals within 10 days of award include a personnel roster, service schedule, equipment list, and waste disposal plan. Coordination contacts are LCDR William Birch and Mr. Oswald Mora, with contact numbers provided in the document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. GUARD BASE SAN JUAN
SAN JUAN, PUERTO RICO 00901
SCOPE OF SERVICS FOR
RBH STREET SWEEPING
AT
UNITED STATES COAST GUARD
BASE SAN JUAN
SAN JUAN, PUERTO RICO
AUGUST 2025
Reviewer Signature Date Facilities Manager
O. Mora, PE
Facilities Engineer
LCDR W. Birch
BASE San Juan BSJ Street Sweeping
1. General
1.1. General Work Requirements
The work includes furnishing all labor, tools, equipment, materials, supervision, and incidentals to perform monthly street sweeping services at U.S. Coast Guard Base San Juan. Work generally includes, but is not limited to, the following:
BASE BID: Monthly service for 1 year period of performance to include following;
A. Sweeping of all streets, roadways, and parking lots within the complex.
B. Collection and disposal of debris, litter, and leaves.
C. Proper disposal of waste materials.
D. Reporting of any issues (e.g., potholes, damaged signs) observed during sweeping.
OPTIONAL SERVICES BID: Follow-on 1 year service period of performance (12 monthly services).
1.2. Qualifications and Performance Requirements
1.2.1. Qualifications
A. The Contractor shall possess all necessary licenses, permits, and insurance as required to perform street sweeping services by the appropriate local jurisdiction.
B. Operators of street sweeping equipment shall be properly trained and licensed.
1.2.2. Performance Requirements
A. The Contractor shall perform all work in a safe, professional, and workmanlike manner.
B. The Contractor shall minimize disruption to traffic and pedestrian flow during the sweeping process.
C. The Contractor shall protect USCG property from damage during the sweeping process.
D. The Contractor shall adhere to all applicable safety regulations and guidelines.
E. Paved areas shall be swept to a condition free of loose debris, litter, and excessive accumulation of leaves.
1.3. Specific Work Requirements
1.3.1. Site Visit:
A. Contractor is responsible for completing a mandatory site visit to field verify the following characteristics of all streets, roadways, and parking lots to be swept under this contract: dimensions/area, condition, obstacles, accessibility and disposal areas.
1.3.2. Equipment:
A. The Contractor shall use mechanical broom sweepers, vacuum sweepers, and any other required machinery and equipment required to perform. All equipment used shall be in good working condition.
1.3.3. Debris Disposal:
A. All debris collected during street sweeping shall be disposed of in proper designated USCG dumpsters or removed from premises and disposed of in accordance with all applicable local regulations.
1.4. Period of Performance
1.4.1. All work shall be completed within 30 calendar days from award date.
1.4.2. Complete during normal working hours (M-F 0800-1700). After hours work may be completed upon approval from Contracting Officer.
1.5. Project Location
U.S. Coast Guard Base San Juan 5 Calle La Puntilla San Juan, Puerto Rico, 00901
2. Applicable Documents and Code Compliance
2.1. The contractor shall ensure work is in compliance with all applicable federal, state, and local regulations, including environmental regulations and traffic safety regulations.
3. Submittals
3.1. Within 10 days after award the contractor shall submit the following:
A. Roster Of Personnel
B. Service Schedule
C. Equipment List
D. Waste Disposal Plan
4. Warranty
The Contractor shall warrant that all services provided will be performed in a professional and workmanlike manner and in accordance with the specifications outlined in this Scope of Work..
5. Coordination
Contact LCDR William Birch (787-360-1101) or Mr. Oswald Mora (939-202-0587) regarding all questions pertaining to the services.
6. References:
USCG Base San Juan Boundaries – Aerial View (pg. 5)
USCG BASE San Juan Street Sweeping Boundaries
File details come from the government source that posted it. Updated .