About this file

This is a bid solicitation document from the City of Bridgeport, Connecticut, Department of Public Purchases, for exterior door replacement services at Bryant School. The project involves the replacement of exterior doors at the school facility. Electronic bid submissions are required through the City's e-Procurement Portal (OpenGov) at https://procurement.opengov.com/portal/bridgeportct, with a submission deadline of 2:00 pm on Tuesday, September 1, 2026. Bids will be publicly opened at the Department of Public Purchases, 2nd floor, 999 Broad Street, Bridgeport, CT 06604 at the time of the deadline. Prospective bidders must create a free account with OpenGov Procurement to submit responses. The cutoff date for submitting written questions is 2:00 pm on Friday, August 21, 2026, and all questions should be posted on the OpenGov Procurement website question section.

Bidders are responsible for regularly monitoring the OpenGov Procurement portal at https://procurement.opengov.com/portal/bridgeportct for any issued addendums. The document does not contain specific information regarding project pricing, set-asides, incumbent contractors, funding sources, or contract renewal options. All additional project details, specifications, and requirements would be contained within the associated project documentation and bid materials available through the procurement portal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID

BMB009279

BRYANT SCHOOL EXTERIOR DOOR REPLACEMENT

CITY OF BRIDGEPORT

DEPARTMENT OF PUBLIC PURCHASES

999 BROAD STREET

BRIDGEPORT CT 06604

Submission Deadline:

Tuesday, September 1, 2026 by 2:00 pm

Table Of Contents

1. Introduction

2. Bid Information

3. Scope of Work

4. Bid Sheet

5. Submission Instructions

6. Terms and Conditions

7. Vendor Questionnaire & Submission

Attachments:

A - Construction Services Insurance Rider

B - Bryant Door Opening Details (2)

C - GENERAL CONDITIONS - FINAL REV. FEB 2026 - HIGHER LIMITS

D - Construction Contract_Bryant School Door Replacement

E - Bryant Door Opening Details (1)

1. Introduction

The City of Bridgeport seeks bids for BRYANT SCHOOL EXTERIOR DOOR

REPLACEMENT.

The requirements of this bid are outlined in greater detail under Bid Information & Statement of

Work Section.

The selected awardee must meet all municipal, State and Federal practices and requirements.

1.1. Invitation to Bid

The Bridgeport Board of Education is seeking bids for BRYANT SCHOOL EXTERIOR DOOR

REPLACEMENT. Interested firms should respond to this request on or before the time due for submission. Submissions will be received by the City of Bridgeport, Department of Public

Purchases, 2nd floor, 999 Broad Street, Bridgeport, CT 06604 until 2:00 pm on Tuesday, September 1, 2026, at which time and then at said office will be publicly opened.

Any questions regarding this bid must be presented in writing and may be posted directly on the

OpenGov Procurement https://procurement.opengov.com/portal/bridgeportct website question sections. The cut-off date for questions and answers is 2:00 pm on Friday, August 21, 2026. All bidders shall check https://procurement.opengov.com/portal/bridgeportct regularly to see if any addendums are issued.

2. Bid Information

2.1. Mandatory Walk through, August 17, 2026 @ 8:00am

All bidders are required to attend the scheduled site visit of the property located at-BRYANT

SCHOOL FRONT ENTRANCE, 230 POPLAR STREET BRIDGEPORT, CT for a tour of the area and to make themselves familiar with the conditions at the site and to determine the scope of job.

2.2. Contractors Requirements and Responsibilities

Contractor must be licensed in the State of Connecticut and all employees must be properly certified and qualified to perform the work. Out of state bidder must provide the City of

Bridgeport with a Certificate of Authority to Do Business in the State of Connecticut within five days of a Notice of Intent to Award. This can be obtained from the Connecticut Secretary of

State.

The contractor will be responsible for the safety of the work site.

The contractor is responsible obtaining and paying for any and all permits as required.

https://procurement.opengov.com/portal/bridgeportct https://procurement.opengov.com/portal/bridgeportct

This contract award will require that the successful vendor have a valid SAM, DUNS, CT and

Federal Tax ID numbers prior to commencing work.

The Contractor is prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.

2.3. Bid Bond

Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with bid submission if the bid is $100,000.00 or more.

2.4. Payment and Performance Bond

The successful bidder, prior to permission to proceed, will be required to post payment & performance bonds of 100% of the contract price if the contract price is $100,000 or more.

2.5. CT DOL Prevailing Wage Rates

Bids in excess of $100,000 must include Prevailing Wage Rates.

2.6. Certificate of Insurance (COI)

It is strongly recommended that a certificate of insurance (COI) including workers compensation with the City listed as additionally insured be included with your bid submission. Prior to award a satisfactory COI will be required. Policies listing auto and general liability insurance with endorsement of additional insure and notice of cancellation will be requested.

2.7. Minority and Buy Local

INTENTIONALLY OMITTED

2.8. Minority Business Enterprise (MBE) and, or as a City Based Business (CBB):

INTENTIONALLY OMITTED

3. Scope of Work

3.1. Project Description

FURNISH AND INSTALLATION OF DOORS, FRAMES, HINGES AND HARDWARE –

BRYANT SCHOOL

The Bridgeport Board of Education wishes to replace doors at Bryant School, 230 Poplar Street, Bridgeport.

• Existing hollow metal frames to remain, check for structural integrity. Except for

Delivery Door.

• FRP doors are to be city standard; Special Lite FRP SL 17 series, dark bronze face and edge finished to match existing.

• Color as selected by owner.

• Hardware to include City standard; Markar heavy duty continuous hinges, Von Duprin 99 series exit devices with keyed dogging, LCN 4000 series closers, Schlage high security

Primus cylinders, Master keyed as directed by owner to integrate into owner’s existing system, 8-inch kickplates, each door to have sweeps and perimeter weatherstripping.

• Labor to include complete demo and removal of existing doors, frames and hardware, installation of new doors, frames and hardware. Remounting of existing alarm contacts is included. Replacement of electromagnetic lock with electric strike is included.

• All old material to be removed by contractor.

• All field measurements and coordination are the responsibility of the contractor.

• Glass to be 1/4 inch tempered.

• All openings with 2 doors must have keyed removable mullions.

• All door pulls must be flush

• All frames must be 16ga, galv welded punch and dimpled, and slushed and caulked

• If frames are not being replaced, priming and painting of existing frame (color to be selected by owner)

• All mullions must be keyed removable

• All keying must tie into existing city keying system

• Contractor must provide styrofoam backing for all drilling

• Remounting of existing door alarms if any

3.2. WORKING CONDITIONS

Contractor must provide container for removal of existing materials, if needed. Contractor shall not use the Board of Education school dumpsters

Container location must be approved by BPS Building Operations Manager.

Contractor must protect the work during and after the installation process until acceptance by the owner.

Contractor is responsible for cleaning areas where work is performed from demolition/installation process.

Upon completion the areas shall be returned to the pre-existing condition or better.

3.3. WORK HOURS/DAYS

Contractor shall coordinate its schedule so that the work on the premises is performed during those hours the BOE sets forth in a written notice to Contractor, unless written permission is obtained from the BOE to work during other times. This condition shall not excuse the Contractor from timely performance under the Contract. The work schedule must be agreed upon by the BOE and Contractor.

3.4. OSHA COMPLIANCE & ENVIRONMENTAL LIMITATIONS

The contractor must fully comply with all relevant OSHA requirements and regulations.

Comply with requirements of material suppliers.

Adhere to all environmental requirements for materials. Protect all persons from exposure to hazardous material.

3.5. TIME FRAME

The Contractor will be required to place a reasonable schedule, including time frame to procure and deliver Equipment, In the event that the schedule will be exceeded based upon parts availability or circumstances beyond Contractor’s control, it is the Contractor’s responsibility to inform the BOE

Facilities Manager of the delay.

3.6. CLEAN UP

Contractor must clean up all unused materials. Debris must be removed by contractor.

3.7. MATERIALS & INSTALLATION WARRANTY

The Contractor warrants that materials will be free from defects before installation.

The Contractor warrants that installation of the materials will be free from defects in workmanship.

The sole and exclusive remedy under the materials and installation warranty shall be the replacement of defective materials and repair of any damages to the ceiling resulting directly from defective materials or defective installation by the Contractor.

3.8. QUALIFICATIONS & OTHER REQUIREMENTS

Contractor must be capable, experienced, and licensed to perform all services listed in the Scope of Work

Section. Contractor shall be an established firm experienced in Field, commercial, public school, door replacement and have been in business for a minimum of five (5) years. Employ trained personnel.

Provide service and shall maintain a local office with adequate inventory of replacement material listed in the Scope of Work.

Contractor must provide all tools, materials and equipment necessary to complete all tasks, including refuse removal.

4. Bid Sheet

LUMP SUM

Contractor shall include all monies and fees to complete the Work, including permits, bonds, equipment, standard warranty, freight, shipping and delivery charges, labor, installation, and or set-up costs, safety checks and all related materials. Contractor must obtain and pay for all permits. All sub-contractors must be identified and their labor rates submitted with bid, if applicable.

Line Item Description Quantity Unit of

Measure Unit Cost Total

1 BRYANT SCHOOL EXTERIOR

DOOR REPLACEMENT

1 LUMP SUM

5. Submission Instructions

5.1. Submission Instructions

All submissions must be submitted via the procurement portal.

Special Submission Circumstances: The procurement portal, OpenGov, is the electronic bid submission process of choice for City of Bridgeport purchases. In the event, a bidder is unable to submit electronically through the city’s procurement portal, bids can be submitted, by mail, as outlined below. Non-electronic submissions are accepted on an exception only basis.

5.2. Contacting the City of Bridgeport

The exclusive means by which all prospective respondents may obtain ITB packages, direct inquires, request and receive addenda and supplemental information, and submit proposals shall be through the City of Bridgeport’s bidding platform.

The City of Bridgeport has made it possible for vendors to view our solicitations, download bid packages and ask questions, free of charge.

Instructions to do so are as follows:

1. Go to the procurement portal, OpenGov https://procurement.opengov.com/portal/bridgeportct

2. Click on any bid you see. It will take you that bid’s page.

3. On the right-hand side of the page, click on Register now for free!

4. After you register, you'll be able to view/download or ask questions on any bid you have interest in.

If you have any trouble registering, please contact OpenGov using the chat feature or send an email to procurement-support@opengov.com

General Information: All inquiries regarding this bid must be presented in writing and may be posted directly on the procurement portal, OpenGov. All answers will be published in the form of addenda on the procurement portal.

mailto:procurement-support@opengov.com

Addenda Notification: Respondents are required to register on the procurement portal, OpenGov. Once the respondent has completed registration, they will receive addenda notifications in their email. Ultimately, it is the sole responsibility of each respondent to periodically check the site for any addenda.

Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.

5.3. Electronic Submission Instructions

THIS METHOD IS PREFERRED.

The City of Bridgeport is accepting electronic bid submissions. Bidders shall create a FREE account with OpenGov Procurement by signing up at https://procurement.opengov.com/signup.

Once you have completed account registration, browse back to this page, click on "Submit

Response", and follow the instructions to submit the electronic bid.

5.4. Paper Submission Instructions

SPECIAL SUBMISSION CIRCUMSTANCES ONLY

SEALED ONE (1) ORIGINAL, THREE (3) COPIES AND ONE (1) ELECTRONIC VIA

THUMBDRIVE MUST BE SUBMITTED.

Bid Submission: Sealed submissions must be received and time-stamped by the Department of

Public Purchases prior to ITB closing time. No submission received after closing time will be considered. The opening will be in the City of Bridgeport Department of Public Purchases’

Conference Room. To ensure proper handling and avoid misdirected delivery, please mark your

ITB envelope as follows:

BMB009279 BRYANT SCHOOL EXTERIOR DOOR REPLACEMENT

If your envelope is not marked accordingly, the City will not assume responsibility for late delivery or deliver to the incorrect location.

Mail your submissions to:

Laura DeMoura City of Bridgeport Department of Public Purchases 2nd floor, 999 Broad Street Bridgeport, CT 06604

ITB submissions are due:

Tuesday, September 1, 2026 no later than 2:00 pm Eastern Standard Time (EST) https://procurement.opengov.com/signup

Late Submissions: The City of Bridgeport will not assume responsibility if a submission is misdirected, or its delivery is delayed. The city will not accept late submission. It shall be the sole responsibility of the submitter to pay for any type of delivery service charge, and to see that the Office of the Purchasing Agent receives his/her submission on time. The clock used shall be the Purchasing Agent’s official date and time stamp clock. The City does not assume financial responsibility for late deliveries by the U.S. Postal System or any other delivery service.

NOTE: IF THE MARGARET E. MORTON GOVERNMENT CENTER, 999 BROAD STREET

BRIDGEPORT, CT IS CLOSED FOR ANY UNFORESEEN EVENT, BIDS WILL BE DUE AT

THE SAME TIME ON THE NEXT BUSINESS DAY THAT THE MARGARET E. MORTON

GOVERNMENT CENTER IS OPEN

5.5. Submission Compliance

Certificates of Insurance: Certificates of insurance will be required from the awarded contractor prior to the commencement of any work and shall be furnished to the Department of

Public Purchases, Margaret E. Morton Government Center, Second Floor, 999 Broad Street, Bridgeport, Connecticut 06604 and must be shown to the City of Bridgeport as an additional insured with thirty (30) days’ notice for cancellation or non-renewal of policy. A copy of the endorsement insurance will also be required for this project.

No Conflicts| Disclosure: the awarded contractor must accurately complete and submit the No

Conflicts/Disclosure Form when it receives a Notice of Intent to Award. Failure to submit the No

Conflicts within three (3) business days of receipt of the Notice of Intent may result in the loss of the award.

Addendums: all bidders shall check the procurement portal regularly to see if any addendums are issued.

Contract Award Requirements: the contract award will require that the successful will require that the successful vendor have a valid SAM, DUNS, CT, and Federal Tax ID numbers prior to commencing work.

5.6. Reservation of Rights

This solicitation is for an “Invitation to Bid (ITB) only”. This invitation to bid is not to be construed as a specific proposal or an offer to buy any products or services. Notwithstanding anything else herein to the contrary, the City expressly reserves all rights in its sole discretion and in the best interests of the City at any time prior to the selection of a preferred respondent and purchase order:

Bid Rejection: The City of Bridgeport reserves the right to reject any and all bids in whole or in part or to accept any bid, in its sole discretion if doing so deemed to be in the best interest of the

City of Bridgeport. This includes the right to reject any or all bids or to decline to make an award. Further, the City of Bridgeport reserves the right to make an award to more than one bidder or make awards not based solely on low bid when time is of the essence.

Expenses: The City shall not be responsible for and/or shall not pay any costs associated with the preparation, submission, or presentation of any submission, or costs incurred by the responding firms during the interview and negotiations phase of the solicitation process

Information and Materials: Any information or materials submitted to this ITB shall become the property of the City of Bridgeport and will not be returned. All submitted materials will be available for public review.

MSDS: The City of Bridgeport may request MSDS (Material Safety Data Sheets) or additional product information and literature or samples on any brands or products proposed as equivalents to those listed herein prior to award or to be included with shipment.

Tax Delinquency: The City of Bridgeport reserves the right to ensure bidders are not delinquent on any City real estate and personal property taxes, ate the time of bid opening.

Purchase Order: No work of deliveries shall be performed under the contract award until a

Purchase Order has been issued by the Purchasing Department.

Contract Award: The City of Bridgeport reserves the right to award a purchase order to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the

City of Bridgeport in terms of cost. Other factors such as lead time, equipment, availability and other factors specified in this solicitation may be considered.

Bid Dates: The City of Bridgeport reserves the right to modify any dates other terms of the ITB upon posting notice. Please keep in mind dates are estimates only and are subject to change.

Liability: The City of Bridgeport is not liable to any Respondent for damages of any type, however arising.

Title: vendors are prohibited from assigning, transferring, conveying, subletting, or otherwise disposing of the ultimate contract award or its rights, title or interest therein or its power to execute such agreement to any other person, company or corporation without the prior consent and approval in writing by the City.

Taxes: bidders should not include any taxes in their quotation for which the city is not liable. The City of Bridgeport will issue tax-exempt certificates covering the work upon request.

6. Terms and Conditions

The selected awardee(s) must meet all municipal, State and Federal practices and requirements.

6.1. Terms and Conditions

All City of Bridgeport contracture terms, conditions, and requirements apply.

6.2. Payment Terms

All payments will be made in accordance with the terms and conditions set forth in the resulting

Agreement.

6.3. Warranty and Support

(Specify any warranty and support requirements.)

Example: In addition to any warranty implied by law or fact, and any other express warranties, bidder expressly warrants all items to be free from defects in design, workmanship and materials to conform strictly to applicable specifications and to be fit and sufficient for the purpose intended to be merchantable. All warranties shall survive inspection, test, acceptance of and payment by the City.

6.4. Openness of Procurement Process

Written responses, other discussions, correspondence, and all other pertinent records shall be handled as public records in compliance with State and Federal open records statutes and regulations.

6.5. Errors and Omissions

Once a response is submitted, the City of Bridgeport may consider requests by any contractor to correct errors or omissions but shall retain sole discretionary authority to determine the outcome of such a request.

6.6. Collusion

By offering a response to this ITB the supplier certifies that no attempt has been made or will be made by the consultant to induce any other person or firm to submit or not to submit a proposal for the purpose of restricting competition. All persons interested in this project, principal or principals being named therein, and no other person have an interest in this project or in the

Agreement which they may participate in. No person or agency has been employed or retained to solicit or secure this Agreement upon an agreement or understanding for a commission, percentage, brokerage, or contingent fee, excepting legitimate employees or established commercial agencies maintained by the consultant for the purpose of doing business. All firms interested in this project (including the firm's employees, representatives, agents, lobbyists attorneys and subconsultants) will refrain, under penalty of disqualification, from direct or indirect contact for the purpose of influencing the selection or creating bias in the selection process with any person who may play a part in the selection process, including the evaluation panel and other administrative staff. The policy is intended to create a level playing field for all potential firms; assure that contract decisions are made in public and to protect the integrity of the selection process.

6.7. Suspension and Debarment

The City will not participate in contracts with parties that have been debarred, suspended or excluded from Federal assistance programs per 2 CFR part 180 and part 1532 and 40 CFR part

31.35. Further, the respondent is required to verify that the respondent, or its principals, as defined at 49 CFR 19.995, or affiliates, as defined at 49 CFR 29.905, are excluded or disqualified as defined at 49 CFR 29.40 and 29.945.

The respondent is required to comply with 49 CFR 29, Subpart C and must include the requirement to comply with 49 CFR 29, Subpart C in any lower-tier covered transaction it participates in.

By signing and submitting its bid or proposal, the respondent or proposer certifies as follows:

The certification in this clause is a material representation of fact relied upon by the City if it is later determined that the respondent or proposer knowingly rendered an erroneous certification, in addition to remedies available to the City the Federal Government may pursue available remedies, including but not limited to suspension and/or debarment. The respondent or proposer agrees to comply with the requirements of 49 CFR 29, Subpart C while this offer is valid and throughout the period of any contract that may arise from this offer. The respondent or proposer further agrees to include a provision requiring such compliance in its lower-tier covered transactions.

6.8. Insurance Requirements

Prior to award a satisfactory Certificate of Insurance (COI) will be required. See attachment section for Construction Services insurance coverage.

6.9. Conflict of Interest

The proposer certifies that to the best to their knowledge or belief, no elected/appointed official or employee of the City is financially interested, directly or indirectly, in the purchase of the foods or services specified in this Request for Proposal.

Proposers are required to complete and answer the No Conflict form located in the Vendor

Questionnaire & Submission section.

6.10. City Exempt from Certain Taxes

The City is exempt from certain Connecticut sales taxes under Title 12, Chapter 219 of the

Connecticut General Statues, as amended from time to time. Services and materials for this project are exempt from State of Connecticut sales tax.

7. Vendor Questionnaire & Submission

1. Federal I.D. Number or Social Security Number:*

*Response required

2. Confirmation*

Pursuant to and in compliance with your Invitation To Bid relating thereto, the submitter states that he has examined the Contract Documents and the site of the work, and that he understands the purport and magnitude of the work intended, and the undersigned hereby offers to furnish all plant, materials, supplies, equipment, labor, and other facilities and things necessary or proper for or incidental to, the proper construction of the work, and to construct the said work in strict accordance with the Contract Documents and such detailed directions, plans, and drawings as may be furnished from time to time during the progress of construction by the Engineer at the following unit and lump sum prices which prices include all incidental work, viz.

☐ Please confirm

*Response required

3. Contractor's License Number*

*Response required

4. BID BOND: *

Include with the submitted bid, a ten (10%) percent bid bond or a certified check made payable to the City of Bridgeport with bid submission if the bid is $100,000.00 or more.

*Response required

5. Contractor's Designation of Compliance Officer*

Please download the below documents, complete, and upload.

• Contractor's_Designation_of...

*Response required

6. Contractor's Good Standing Certification*

Please download the below documents, complete, and upload.

• Contractor's_Good_Standing_...

*Response required

7. Contractor's Wage Certification Form*

Please download the below documents, complete, and upload.

• Contractor's_Wage_Certifica...

*Response required

8. Equal Opportunity Policy Statement*

Please download the below documents, complete, and upload.

• Equal_Opportunity_Policy_St...

*Response required

9. No Conflicts-Disclosure Form*

Please download the below documents, complete, and upload.

• NO_CONFLICTS_FORM_10-2018_a...

*Response required https://government-project.s3.us-west-2.amazonaws.com/115403/3faa8962-fb0f-477e-9640-3d6a6e5da7b5_Contractor%27s_Designation_of_Compliance_Officer.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/c66f2928-6ed1-487c-b379-a483753f60fe_Contractor%27s_Good_Standing_Certification.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/bc822fc4-8c98-4c44-9c3c-6bbdb5037c4a_Contractor%27s_Wage_Certification_Form.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/c3bb68fd-8bdb-4117-814f-2c90076a67e8_Equal_Opportunity_Policy_Statement_09162025REV.pdf https://government-project.s3.us-west-2.amazonaws.com/115403/31223730-5bed-41f3-bdeb-c2f97ce250c6_NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4PV56BF4F%2F20260805%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260805T154930Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEGAaCXVzLXdlc3QtMiJHMEUCIGNmgLbGii%2F8OsJrryd1NB4Key8X1nPn6OhFqT2%2F3IFoAiEA7TfR%2FsIwymXi%2FpX0c9iQPe7WpoxYeVSP3LJwKduB2CAqjAUIKRACGgw4OTIzNjQ2ODc2NzIiDOPukgcbuf3l6tP1ICrpBFSqdl5sHahtKUVDvu6qebqTkFrvWuJiRf7dWhOOX1Lr8cuD0u3uM1P%2F%2FH16CuAe0DGKhuGIxS%2B9qMyATi2d1AbYvH0dLUeRY05jXw5e2ZfB9itCCrIjMAk9VKtbvnwouue2Wk8ZwINtS2zkMZ0ihbvXv5cN4A1u8Hc%2BSQ6UFuJGS%2Bofm%2FILlBO8rNnY9uw6q0tfzM%2BJuMfdxTDSDqhUrKIxaOUo8FGz%2FzWpF2ajAF8tgpYXWeJ3OsNOye226Hhd3lu0QwO5%2BA%2FXXxkkDYdu6Le9lB7I323m%2BsXsSRGnc9vWeN5J5di554hffH9bwp2SbtRWZVQVLTWf2akmk5vW70m%2Bxn7nYvv4tXUsLqltd0EdofBMUJwNn07BmAJAPdLXJ2G%2BdjBF20J84MWiOaPimZCN3WyW6WuI40LkmbYQKTAse%2FyWWln1ADhFxyJRlRzvZFukt2%2BbRg5Z20AAUWAo294c7KV%2FubPTau8kndYmJor2rk%2Fm1bS6ZlTK7ry7kb82fZjR9YWUkNRwzTuZJHfN4hWppJTMTxEeoSHIti47vBx80SKDh%2BlWeuOMc2fCs0Xzouke%2FG%2FXnkB8PeT4nEAmxJeL1jV9qcvhhPWG7e0gT%2BaiJdz2EKWhSQO9l6sJ2Dl4bh2jVF5XbXvJQbF3EO0KX3RBHpEHZ8NiUtzzBcsKELWJRgA6%2F4ancI7HgpIOxMZhquoCFG74t0t7KdOwSCary7XaBFZAWxVwguG3jEiQxO5s%2BcSN0PZINIYwJUQru2bbedmjwo2Eid66ilnhWCOddnwYLPnTyijxMqKsqUk3Bp2DEodpfS4%2Fq0JZMMOqzdMGOpkBrSQCHq%2BfR3wAdbsLLHJ%2Fcf853%2B8RDeQU2ri8zNzIIGtmHoRv54k7DRyLMIZxmd5sr4Fjiu0Je569COb5eUctNJUDEOzTrsG2Hwas7mQX94dISbmEwMFrBbaJVaeFVav8KxZRTm8q6pPserwXvtNWtEXzz7fRSJqxKvkwhGpd9WRli%2BPAPNehqH%2FBAuSvMMoSpgfO75u9QSty&X-Amz-Signature=ab8110571eb2cbdcf7d57d8ab851fa9abdd21b3c3c4c057e7d398712185f2cd0&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22NO_CONFLICTS_FORM_10-2018_and_02-2025.pdf%22&x-id=GetObject

10. Upload a tentative work schedule. Please include the Number of Days to procure and deliver the material needed to complete the Work.*

*Response required

1. Introduction
1.1. Invitation to Bid
2. Bid Information
2.1. Mandatory Walk through, August 17, 2026 @ 8:00am
2.2. Contractors Requirements and Responsibilities
2.3. Bid Bond
2.4. Payment and Performance Bond
2.5. CT DOL Prevailing Wage Rates
2.6. Certificate of Insurance (COI)
2.7. Minority and Buy Local
2.8. Minority Business Enterprise (MBE) and, or as a City Based Business (CBB):
3. Scope of Work
3.1. Project Description
3.2. WORKING CONDITIONS
3.3. WORK HOURS/DAYS
3.4. OSHA COMPLIANCE & ENVIRONMENTAL LIMITATIONS
3.5. TIME FRAME
3.6. CLEAN UP
3.7. MATERIALS & INSTALLATION WARRANTY
3.8. QUALIFICATIONS & OTHER REQUIREMENTS
4. Bid Sheet
5. Submission Instructions
5.1. Submission Instructions
5.2. Contacting the City of Bridgeport
5.3. Electronic Submission Instructions
5.4. Paper Submission Instructions
5.5. Submission Compliance
5.6. Reservation of Rights
6. Terms and Conditions
6.1. Terms and Conditions
6.2. Payment Terms
6.3. Warranty and Support
6.4. Openness of Procurement Process
6.5. Errors and Omissions
6.6. Collusion
6.7. Suspension and Debarment
6.8. Insurance Requirements
6.9. Conflict of Interest
6.10. City Exempt from Certain Taxes
7. Vendor Questionnaire & Submission
1. Federal I.D. Number or Social Security Number:*
2. Confirmation*
3. Contractor's License Number*
4. BID BOND: *
5. Contractor's Designation of Compliance Officer*
6. Contractor's Good Standing Certification*
7. Contractor's Wage Certification Form*
8. Equal Opportunity Policy Statement*
9. No Conflicts-Disclosure Form*
10. Upload a tentative work schedule. Please include the Number of Days to procure and deliver the material needed to complete the Work.*