BRQ.pdf

PDF 233 KB Posted

Attached to
Repair Well #8 Federal contract opportunity
Solicitation number
15B51022Q00000013
Issued by
Department of Justice Bureau of Prisons

View the file

Other files for this federal contract opportunity

Other files attached to Repair Well #8, newest first.
File Type Posted
Statement of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15B51022Q00000013 Page 1 of 15

SOLICITATION,OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER

15B51022Q00000013

SEALED BID (IFB)

NEGOTIATED (RFP)

2. TYPE OF SOLICITATION 3. DATE ISSUED

04/25/2022

PAGE OF PAGES

1 15

IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER

15B51022PR000085

6. PROJECT NUMBER

22Z5AE6

CODE 15B510

Federal Bureau of Prisons FCI La Tuna 8500 DONIPHAN Rd Anthony, TX 88021

7. ISSUED BY

Jennifer Contreras j2contreras@bop.gov

8. ADDRESS OFFER TO

9. FOR INFORMATION CALL: a. NAME

Jennifer Contreras j2contreras@bop.gov

b. TELEPHONE NUMBER (Include area code)(NO COLLECT CALLS)

9157919000

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

The contractor receiving award shall supply all labor, labor supervision, personal, equipment, tools and materials to remove and replace with new Well #8: column pipe casing, bearing, shaft, pump motor, spiders, oil lube column, and associated components and accessories. Necessary inspections, certifications, disinfecting, final connections and startup, and training of staff in proper operation and maintenance. This includes the deposal of all associated repair trash and debris from FCI La Tuna in accordance with the requirements of solicitation 15B51022Q00000013 and Statement of Work (SOW). *INCLUDE THE FOLLOWING INFORMATION* DUNS#:

____________ TIN#: ______________ CAGE CODE: ________ EMAIL: ______________________

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving10 90 award, notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).

X YES NO

12b. CALENDAR DAYS

Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

12:00US/

Mountain a.

04/29/2022

b. An offer guarantee is, X is not required.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.

60d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

X

(See FAO-0001 Bonds, on page 6 for bid bond applicability)

15B51022Q00000013 Page 2 of 15

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

CODE FACILITY CODE

The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

17.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

$0.00 BOP-2022-1003XD-P0510-PZ-3B-22Z5AE6-26001-2699-2022

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c) ( ) 41 U.S.C. 3304(a) ( )

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY 15B510

Federal Bureau of Prisons FCI La Tuna 8500 DONIPHAN Rd Anthony, TX 79821

Jennifer Contreras

(O) 915-791-9000 j2contreras@bop.gov

Federal Bureau of Prisons FCI La Tuna 8500 DONIPHAN Rd Anthony, TX 79821

EROBERTS

EXROBERTS@BOP.GOV

27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

Jennifer Contreras

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

STANDARD FORM 1442 (REV. 8/2014) BACK

TOTAL FIRM-FIXED-PRICE OFFER AMOUNT: $

15B51022Q00000013 Page 3 of 15

Table of Contents

Section Description Page Number

A Government Works Continuation Section 1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements

2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (June 1996) FAO-0001 Bonds

4 Contract Clauses 5 Attachments 6 Solicitation Provisions

52.222-5 Construction Wage Rate Requirements - Secondary Site of the Work (May 2014) 7 Representations and Certifications

15B51022Q00000013 Page 4 of 15

Government Works Continuation Section

THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date) CONTINUATION

ALL ESTIMATES AND OR QUOTES PRIOR TO SOLICITATION ARE INVALID. ALL SOLICITATION REQUIREMENTS MUST BE FOLLOWED FOR BIDS TO BE

ACCEPTED.

15B51022Q00000013 Page 5 of 15

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Repair Well #8 as detailed in SOW

The contractor receiving award shall supply all labor, labor supervision, personal, equipment, tools and materials to remove and replace with new Well #8: column pipe casing, bearing, shaft, pump motor, spiders, oil lube column, and associated components and accessories. Necessary inspections, certifications, disinfecting, final connections and startup, and training of staff in proper operation and maintenance. This includes the deposal of all associated repair trash and debris from FCI La Tuna in accordance with the requirements of solicitation 15B51022Q00000013 and Statement of Work (SOW).

PSC: Z1NE

1 JB $________ $_________________

The successful contractor shall be responsible for all applicable federal, state, and local taxes. THE TOTAL PRICE SHALL BE

WRITTEN IN BLOCK 17 OF THE STANDARD FORM 1442.

15B51022Q00000013 Page 6 of 15

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

2852.223-70 Unsafe Conditions Due to the Presence of Hazardous Material (June

1996)

Clauses By Full Text

Clauses By Full Text

FAO-0001 Bonds

(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)

(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows; a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)

(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.

(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.

(c) For construction contracts greater than $30,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):

(1) A Payment Bond;

(2) An irrevocable letter of credit (ILC);

(3) A tripartite escrow agreement;

(4) A Certificate of Deposit; or

(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.

(d) Individual Sureties.

(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.

(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract

15B51022Q00000013 Page 7 of 15 location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.

15B51022Q00000013 Page 8 of 15

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.246-12 Inspection of Construction (Aug 1996)

52.203-7 Anti-Kickback Procedures (Jun 2020)

52.204-2 Alt II Security Requirements (Mar 2021) - Alternate II (Apr 1984)

52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011)

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

(Jun 2020)

52.204-13 System for Award Management Maintenance (Oct 2018)

52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020)

52.204-19 Incorporation by Reference of Representations and Certifications (Dec

2014)

52.204-23 Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab and Other Covered Entities

(Nov 2021)

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment (Nov 2021)

52.209-6 Protecting the Government's Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment (Nov

2021)

52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov

2015)

52.215-21 Alt II Requirements for Certified Cost or Pricing Data and Data Other Than

Certified Cost or Pricing Data-Modifications (Nov 2021) - Alternate II

(Oct 1997)

52.219-6 Notice of Total Small Business Set-Aside (Nov 2020)

15B51022Q00000013 Page 9 of 15

Clause Title Fill-ins (if applicable)

52.219-28 Post-Award Small Business Program Rerepresentation (Sep 2021)

52.222-1 Notice to the Government of Labor Disputes (Feb 1997)

52.222-3 Convict Labor (June 2003)

52.222-6 Construction Wage Rate Requirements (Aug 2018)

52.222-7 Withholding of Funds (May 2014)

52.222-8 Payrolls and Basic Records (Jul 2021)

52.222-9 Apprentices and Trainees (July 2005)

52.222-13 Compliance with Construction Wage Rate Requirements and Related

Regulations (May 2014)

52.222-14 Disputes Concerning Labor Standards (Feb 1988)

52.222-15 Certification of Eligibility (May 2014)

52.222-21 Prohibition of Segregated Facilities (Apr 2015)

52.222-26 Equal Opportunity (Sept 2016)

52.222-27 Affirmative Action Compliance Requirements for Construction (Apr

2015)

52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020)

52.222-37 Employment Reports on Veterans (Jun 2020)

52.222-50 Combating Trafficking in Persons (Nov 2021)

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026

(Jan 2022)

52.223-2 Affirmative Procurement of Biobased Products Under Service and

Construction Contracts (Sep 2013)

52.223-5 Pollution Prevention and Right-to-Know Information (May 2011)

52.223-6 Drug-Free Workplace (May 2001)

52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving

(Jun 2020)

52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021)

52.227-4 Patent Indemnity-Construction Contracts (Dec 2007)

52.228-5 Insurance-Work on a Government Installation (Jan 1997)

52.228-11 Individual Surety-Pledge of Assets (Feb 2021)

15B51022Q00000013 Page 10 of 15

52.228-13 Alternative Payment Protections (July 2000)

52.229-3 Federal, State and Local Taxes (Feb 2013)

52.232-23 Assignment of Claims (May 2014)

52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013)

52.232-5 Payments under Fixed-Price Construction Contracts (May 2014)

52.232-27 Prompt Payment for Construction Contracts (Jan 2017)

52.232-33 Payment by Electronic Funds Transfer-System for Award Management

(Oct 2018)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

(Nov 2021)

52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991)

52.233-3 Protest after Award (Aug 1996)

52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004)

52.236-2 Differing Site Conditions (Apr 1984)

52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)

52.236-5 Material and Workmanship (Apr 1984)

52.236-7 Permits and Responsibilities (Nov 1991)

52.236-8 Other Contracts (Apr 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and

Improvements (Apr 1984)

52.236-10 Operations and Storage Areas (Apr 1984)

52.236-11 Use and Possession Prior to Completion (Apr 1984)

52.236-12 Cleaning Up (Apr 1984)

52.236-13 Accident Prevention (Nov 1991)

52.236-17 Layout of Work (Apr 1984)

52.236-21 Specifications and Drawings for Construction (Feb 1997)

52.236-26 Preconstruction Conference (Feb 1995)

52.242-14 Suspension of Work (Apr 1984)

52.243-5 Changes and Changed Conditions (Apr 1984)

15B51022Q00000013 Page 11 of 15

52.244-6 Subcontracts for Commercial Products and Commercial Services (Jan

2022)

52.246-21 Warranty of Construction (Mar 1994)

52.249-1 Alt I Termination for Convenience of the Government (Fixed-Price) (Short

Form) (Apr 1984) - Alternate I (Apr 1984)

52.249-10 Default (Fixed-Price Construction) (Apr 1984)

52.21-603-70 Contracting Officer's Representative (COR) (June 2012) Name: "[Name]"

Title: "[Title]" location: "[Location]"

Phone Number: "[Area Code and

Telephone Number]"

52.218-000 CONTINUING CONTRACT PERFORMANCE DURING A PANDEMIC

INFLUENZA OR OTHER NATIONAL EMERGENCY (May 2008)

52.24-403-70 Notice of Contractor Personnel Security Requirements (OCT 2005)

52.27-103-72 DOJ CONTRACTOR RESIDENCY REQUIREMENT BUREAU OF

PRISONS (JUNE 2004)

52.228-2 Additional Bond Security (Oct 1997)

52.228-4 Workers' Compensation and War-Hazard Insurance Overseas (Apr

1984)

Clauses By Full Text

52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984)

The Contractor shall be required to (a) commence work under this contract within __________ [Contracting Officer insert number] calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than __________.* The time stated for completion shall include final cleanup of the premises.

* The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 Liquidated Damages-Construction (Sept 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of __________ [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.

150 days

$709.46

15B51022Q00000013 Page 12 of 15

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

15B51022Q00000013 Page 13 of 15

Identifier Title Number of Pages

1 2022_04_21_10_15_13.pdf 2 Statement of Work.pdf 3 FAC COR Cert.pdf 4 IGE.pdf 5 Procurement Integrity Forms.pdf 6 Funds Availability Memo.pdf 7 Funds Certification Memo.pdf 8 Transmittal Sheet.pdf 9 COR Memo.pdf 10 Recommended Sources.pdf 11 SBU Memo.pdf 12 Liquidated Damages Memo.pdf 13 Performance Period.pdf

15B51022Q00000013 Page 14 of 15

Provisions By Full Text

Provisions By Full Text

52.222-5 Construction Wage Rate Requirements - Secondary Site of the Work (May 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of provision)

15B51022Q00000013 Page 15 of 15

Provisions By Reference

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer.

In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): www.acquisition.gov

Provision Title Fill-ins (if applicable)

52.204-24 Representation Regarding Certain Telecommunications and Video

Surveillance Services or Equipment (Nov 2021)