Briefing Console - SOW-Rev7.docx

DOCX document 22 KB Posted

Attached to
Briefing Console Upgrade
Solicitation number
N0017420Q0102
Issued by

View the file

Other files

File Type Posted
DIPSSS82210.pdf PDF
DD1423-11-CDRL-Briefing Console-System Drawings.pdf PDF
CDRL A001.pdf PDF
CDRL A002.pdf PDF
DI-SESS-81002F.pdf PDF
DD1423-11-CDRL-Briefing Console-Training Brochure.pdf PDF
N00174-20-Q-0102.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work For Technical Support Center’s Briefing Console Systems Materials and Services At The Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division

(NSWC IHEODTD)

1.0 SCOPE

The Government requires project management, system engineering, materials, integration, installation, and testing of the Technical Support Centers (TSC) Briefing Console. The Briefing Console will connect to Secret Internet Protocol Router Network (SIPR) and the Non-classified Internet Protocol Router Network (NIPR). The Console will also connect to a Blu-ray player.

The Contractor shall remove the existing Console equipment in Building 2172, Room 272 the Technical Support Center, at the Naval Surface Warfare Center, Indian Head Explosive Ordnance Disposal Technology Division (NSWC IHEODTD) Stump Neck Campus in Indian Head, Maryland. All existing equipment will remain the Government’s property and shall remain on the Government site.

The Contractor shall provide the labor, equipment, and materials to install a new Console system in Building 2172, TSC, which shall include integration into the centralized control capability. For this project, the contractor shall develop detailed system requirements and conduct system design reviews with NSWC IHEODTD Government personnel to ensure the system design meets user needs and the appropriate equipment is selected. After installation and system groom, the contractor shall perform an acceptance test with the NSWC IHEODTD users to ensure the systems are fully functional and meet user requirements. After completion of acceptance testing, the Contractor shall provide maintenance and operational training to the users.

There will be a pre-solicitation site visit set up by the Government, during which interested Contractors will have the opportunity to ask questions and gather the necessary information.

2.0 APPLICABLE DOCUMENTS

N/A

3.0 REQUIREMENTS

The Contractor will be required to perform a site survey prior to developing detailed system requirements. All equipment removed or not utilized during the performance of this project will remain the property of the U.S Government and shall be returned to NSWC IHEODTD for disposition.

The Contractor will perform a site survey post award to finalize the equipment list.

3.1 Design Requirements – All Systems

3.1.1 Capability

The Briefing Console system shall be furnished with the following capabilities.

The ability to provide high definition local presentations of all available sources SIPR, NIPR and Blu-Ray Two wall mounted 80” 4k UHD monitors.

Program and configure the touch panel and/or remote to accommodate all sources and user commands.

The dimensions of the current rack is h 39”, w 22”, d 24”

3.2 Equipment Removal Requirements

All existing equipment shall be removed by the Contractor and turned over to Government. The Government will provide all power connections.

4.0 DELIVERABLES

Contractor will be responsible for transporting all equipment to NSWC IHEODTD Stump Neck campus. No equipment will be routed through NSWC IHEODTD Property Office. All cabling will be labelled IAW the System Drawings.

Documentation:

· System Drawings (CDRL A001)

· Equipment List with manufacture models numbers and serial numbers

· Training Documentation (CDRL A002)

· Vendor Manuals and Warranty Information

· Vendor will provide both written and electronic documents on the system design, installation, usage and all manuals and hardware documentation. The electronic and paper documents will be properly labeled.

Services:

· The service contract includes phone and on-site support (within 24 hours) as needed for equipment configuration issues, and hardware and software issues. Also includes replacement of broken or faulty equipment.

· Standard commercial warranty – The Contractor will provide a standard Commercial Warranty, specify terms and conditions of the warranty, and identify the warranty period. Warranty for all equipment shall commence from date of delivery and Government acceptance.

File details come from the government source that posted it. Updated .