Bridger Canyon Plan.pdf

PDF 1 MB Posted

Attached to
Install New Roadway Information Systems (RWIS) Butte District
Solicitation number
MDT-315436-RP
Issued by
Montana

About this file

The document is a project plan for the Bridger Canyon Roadway Information Systems (RWIS) installation in the Montana Department of Transportation's Butte District. The plan details a specific roadway infrastructure project involving the installation of a new RWIS tower, remote processing unit (RPU), underground service assembly, and associated electrical infrastructure. The project scope includes installing 250 linear feet of 2-inch plastic conduit, 750 linear feet of copper AWG 8 conductor, a Type 2 composite pullbox, and modifications to an existing service assembly. The project is located on Highway 86 at Henny's Drive, with a single RWIS system being implemented.

The project quantities are precisely specified, with each major component listed as a singular unit: 1 RWIS, 1 service assembly, and 1 composite pullbox. The electrical infrastructure includes 250 linear feet of conduit and 750 linear feet of conductor. No specific pricing information is provided in this document, and the broader financial details of the contract are not included in the image. The plan appears to be a technical schematic and implementation guide for the RWIS installation, focusing on the physical layout and infrastructure requirements of the project.

View the file

Other files

File Type Posted
Fencing Detail Drawing 1.docx DOCX document
Install New Roadway Information Systems (RWIS) Butte District Specifications.docx DOCX document
1189927-event.pdf PDF
Boulder MCS Plan.pdf PDF
Woods Corner Plan.pdf PDF
Clancy Plan.pdf PDF
Yankee Jim Plan.pdf PDF
I-90 334 Wind Plan.pdf PDF
Big Sky Plan.pdf PDF
Electrical Detail Drawing 1.pdf PDF
Davis Bacon Rates.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

u0324 Typewritten Text Bridger Canyon RWIS u0324 Stamp u0324 Rectangle u0324 Line u0324 Line u0324 Text Box

UNDERGROUND

SERVICE ASSEMBLY

u0324 Text Box

RWIS TOWER AND RPU

C000086A APPROX RP 16.7, RT

u0324 Text Box

NEW 2" PLASTIC CONDUIT

NEW 3 OF AWG NO 8 CONDUCTOR

u0324 Text Box

TYPE 2 PULLBOX

u0324 Rectangle u0324 Line u0324 Line u0324 Line u0324 Polygon u0324 Line u0324 Stamp

Blank Page

File details come from the government source that posted it. Updated .