Bridge Replacement - CR 27 & CR 10 Summary
This is a Notice to Highway Contractors issued by the Indiana Department of Transportation for bridge replacement projects in DeKalb County. The project involves two bridge replacements: one on CR 27 Ashley Road over I-69, 2.32 miles south of US 6, and one on CR 10 over I-69, 2.28 miles south of SR 4. Both structures will be constructed using prestressed concrete bulb-T beam design. The letting date and time for sealed electronic proposals is September 2, 2026, at 10:00 AM. The project completion date is June 1, 2028. All bids must be submitted electronically through the Bid Express Online Bidding Exchange platform. Only contractors holding a valid Certificate of Qualification from the Indiana Department of Transportation are eligible to submit bids. Contractors planning to submit electronic bids must register in advance by emailing INDOTbidders@indot.in.gov with their request, call numbers, and FEIN number no later than 9:00 AM on the bid opening date.
All bids must include an executed bid bond submitted through either Surety2000 or Tinubu Surety Solution. A fully executed performance bond is required with all bids. Contractors submitting bids of $150,000 or more must include a written employee drug testing plan in compliance with Indiana Code 4-13-18, submitted to the Construction Letting email inbox or to the INDOT Prequalification Engineer by the bid submission deadline. The project has a 0.00 percent Disadvantaged Business Enterprise (DBE) goal. Bid qualifications are designated as D(B), indicating specialized requirements. Detailed construction contract letting documents are available for download at no cost from the INDOT internet Documents Download webpage. Proposal bid reading will begin at 11:30 AM on the INDOT webpage following the letting date, with in-person attendance available upon advance request to Contract Administration at least 24 hours prior to the letting.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOTICE TO HIGHWAY CONTRACTORS
September 2, 2026
Sealed proposals for certain highway improvements as described below will be received from contractors holding a valid Certificate of Qualification issued by the Indiana Department of Transportation (INDOT) until the above stated letting date and time.
ELECTRONIC BIDDING: All contracts within this notice are designated for electronic bidding via the Bid Express Online Bidding Exchange (Bid Express). Only electronic bids submitted via Bid Express will be accepted on contracts designated for electronic bidding.
LOCATION OF OPENING: All submitted proposal bids will be downloaded from Bid Express immediately after the above stated letting date & time.
Due to the time required to download and import them into the processing database, the reading and immediate public release of the proposal bids will begin at 11:30 AM on the INDOT webpage. With advanced notice, INDOT will accommodate anyone wishing to attend in-person the reading of the proposal bids.* To request in-person attendance of proposal bid readings please contact Contract Administration at indotbidders@indot.in.gov at least 24 hours prior to the letting. Proposal bids will be considered as provided for in the Rules governing INDOT bidding.
LETTING DOCUMENTS: Detailed Construction Contract letting documents will be available for downloading via the INDOT internet Documents Download webpage at no cost. Those document files are copyright free without restrictions on duplication or distribution. Required electronic bidding files will be available from the Bid Express website. It is the bidder's responsibility to check the Bid Express website for all amendment files prior to the deadline. An amendment file may not be communicated by the issuance of an INDOT revision notice.
BIDDER REGISTRATION: Contractors planning to submit electronic bids via Bid Express must register in advance by emailing their request to bid to:
INDOTbidders@indot.in.gov. Requests must indicate the contracts desired to bid with call number(s) and include the Contractor’s FEIN number. Only registered valid bidders may submit bids via Bid Express. Bidder registration requests must may be received no later than 9:00 AM (local time) on the bid opening date.
BID BONDS: An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid.
PERFORMANCE BONDS: A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Bid Express does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids.
CONTRACTOR EMPLOYEE DRUG TESTING PLAN: Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor’s employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids.
August 05, 2026Published:
Letting Date & Time:
INDIANA DEPARTMENT OF TRANSPORTATION
10:00 AMat
INDIANA DEPARTMENT OF TRANSPORTATION
Contract Administration Division 100 North Senate Avenue, N758-Cont Indianapolis, IN 46204 For more information call (317)232-5300.
INTERNET WEBPAGE ADDRESSES:
Documents Download webpage - http://erms.indot.in.gov/ViewDocs/ Rules for Bidding webpage - http://www.in.gov/dot/div/contracts/letting/general/105iac11.pdf Letting Information Index webpage - http://www.in.gov/dot/div/contracts/letting/index.html Bid Express website - https://www.bidx.com/
TITLE VI ASSURANCES: In accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Sub Title A, Office of the Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation, the Indiana Department of Transportation assures minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, age, national origin, religion, sexual orientation, gender identity, disability/handicap or income status in consideration for an award.
atSeptember 2, 2026 10:00 AMLetting Date & Time:
R -42311-A BIKE AND PEDESTRIAN FACILITIES
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
1901900 BIKE AND PEDESTRIAN FACILITIES1901900
LAKE COUNTY - ON MARQUETTE GREENWAY TRAIL FROM
KENNEDY AVE TO CLINE AVE
September 24, 2027 0.00
B(A) C(B)
Completion Date DBE Goal:
Qualifications:
R -44461-A SMALL STRUCTURE REPLACEMENT AND PIPE LINING
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200572 SMALL STRUCTURE REPLACEMENT CV 446-053-9.15 REINFORCED
CONCRETE BOX
2200572
MONROE COUNTY - ON SR 446 OVER UNT TO SALT CREEK, 5.10
MILES NORTH OF SR 58
2200573 SMALL STRUCTURE PIPE LINING2200573
LAWRENCE COUNTY - ON SR 446 OVER UNNAMED DITCH, 1.30
MILES NORTH OF SR 58
2200578 SMALL STRUCTURE REPLACEMENT CV 135-007-087.75
REINFORCED CONCRETE BOX
2200578
BROWN COUNTY - ON SR 135 OVER UNT TO MID FORK SALT CRK,
8.54 MI S OF SR 46
2200593 SMALL STRUCTURE REPLACEMENT WITH BRIDGE 058-003-10837
PRECAST REINFORCED CONCRETE 3-SIDED STRUCTURE
2200593
BARTHOLOMEW COUNTY - ON SR 58 OVER UNT TO S FORK WHITE
CREEK, 6.84 MI E OF SR 258
July 30, 2027 0.00
C(B) E(E) 0290
Completion Date DBE Goal:
Qualifications:
R -44529-A SMALL STRUCTURE REPLACEMENT, MAINTENANCE
AND REPAIR
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200663 SMALL STRUCTURE REPLACEMENT CV 009-092-157.02 CULVERT2200663
WHITLEY COUNTY - ON SR 9 OVER UNT TO TIPPECANOE RIVER,
7.0 MILES N OF US 30
2500552 SMALL STRUCTURE MAINTENANCE AND REPAIR CV 009-092-152.34
CULVERT
2500552
WHITLEY COUNTY - ON SR 9 OVER RITTENHOUSE DITCH, 2.40
MILES NORTH OF US 30
October 15, 2027 0.00
C(B) E(E)
Completion Date DBE Goal:
Qualifications:
R -44574-A SMALL STRUCTURE, PIPE LINING
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200661 SMALL STRUCTURE, PIPE LINING CV 008-017-71.30 CULVERT2200661
DEKALB COUNTY - ON SR 8 OVER SEBERT DITCH, 9.40 MILES
EAST OF I-69
2200662 SMALL STRUCTURE, PIPE LINING CV 008-057-49.20 CULVERT2200662
NOBLE COUNTY - ON SR 8 OVER CROTHERS DITCH, 2.88 MILES
WEST OF SR 3
2200664 SMALL STRUCTURE, PIPE LINING CV 003-057-194.92 CULVERT2200664
NOBLE COUNTY - ON SR 3 OVER UNT TO LITTLE CEDAR CRK, 4.23
MILES N OF SR 205
June 01, 2027 0.00
Completion Date DBE Goal:
R -45304-A SMALL STRUCTURE REPLACEMENT
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2301184 SMALL STRUCTURE REPLACEMENT CV 150-031-156.55 CULVERT2301184
HARRISON COUNTY - ON US 150 0.38 MILE WEST OF SR 135
April 30, 2027 0.00
C(B) E(E)
Completion Date DBE Goal:
Qualifications:
R -45561-A SMALL STRUCTURE PIPE LINING
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
2400510 SMALL STRUCTURE PIPE LINING CV I65-091-188.40 CULVERT2400510
WHITE COUNTY - ALONG I-65 OVER UNT TO MYERS DITCH, 0.45
MILE NORTH OF SR 18
2400512 SMALL STRUCTURE PIPE LINING CV I65-012-159.40 CULVERT2400512
CLINTON COUNTY - ALONG I-65 OVER LAURAMIE CREEK, 1.59
MILES NORTH OF SR 28
October 15, 2027 0.00
Completion Date DBE Goal:
Qualifications:
R -46477-B PAVEMENT PATCHING
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2501120 PAVEMENT PATCHING2501120
VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE
LAPORTE DISTRICT
May 27, 2027
A(A) B(A)
Completion Date
Qualifications:
IVOSB Goal: 3.00
MBE GOAL: 0.00 WBE GOAL: 0.00
B -42374-A BRIDGE REPLACEMENT
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
1900058 BRIDGE REPLACEMENT I69-332-10473 PRESTRESSED CONCRETE
BULB-T BEAM
1900058
DEKALB COUNTY - ON CR 27 ASHLEY ROAD OVER I-69, 2.32 MILES
SOUTH OF US 6
1900059 BRIDGE REPLACEMENT I69-338-10474 PRESTRESSED CONCRETE
BULB-T BEAM
1900059
DEKALB COUNTY - ON CR 10 OVER I-69, 2.28 MILES SOUTH OF SR
June 01, 2028 0.00
D(B)
Completion Date DBE Goal:
B -43492-A BRIDGE COATING, SUBSTRUCTURE REPAIR AND
REHABILITATION
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2001991 BRIDGE COATING (35)3-18-02395 CONTINUOUS STEEL BEAM2001991
DELAWARE COUNTY - ON US 35N OVER CARDINAL GREENWAY,
2.25 MILES SOUTH OF SR 32
2001992 BRIDGE COATING (35)3-18-02395 CONTINUOUS STEEL BEAM2001992
DELAWARE COUNTY - ON US 35S OVER CARDINAL GREENWAY,
2.25 MILES SOUTH OF SR 32
2002061 BRIDGE COATING (67)3-18-05461 COMPOSITE CONTINUOUS STEEL
BEAM
2002061
DELAWARE COUNTY - ON SR 67N OVER SR 3, 1.30 MILES SOUTH
OF US 35
2002062 BRIDGE COATING (67)3-18-05461 COMPOSITE CONTINUOUS STEEL
BEAM
2002062
DELAWARE COUNTY - ON SR 67S OVER SR 3, 1.30 MILES SOUTH
OF US 35
2100849 BRIDGE COATING 003-18-05462 CONTINUOUS STEEL BEAM2100849
DELAWARE COUNTY - ON SR 3N OVER US 35, 2.60 MILES SOUTH
OF SR 32
2100850 BRIDGE COATING 003-18-05462 CONTINUOUS STEEL BEAM2100850
DELAWARE COUNTY - ON SR 3S OVER US 35, 2.60 MILES SOUTH
OF SR 32
2100851 BRIDGE COATING (35)3-18-05465 COMPOSITE CONTINUOUS STEEL
BEAM
2100851
DELAWARE COUNTY - ON US 35N OVER MEMORIAL DRIVE, 1.01
MILES SOUTH OF SR 32
2100852 BRIDGE COATING (35)3-18-05465 COMPOSITE CONTINUOUS STEEL
BEAM
2100852
DELAWARE COUNTY - ON US 35S OVER MEMORIAL DRIVE, 1.04
MILES SOUTH OF SR 32
2100853 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-02396
CONTINUOUS STEEL BEAM
2100853
DELAWARE COUNTY - ON US 35N OVER CSX RR, 0.10 MILE SOUTH
OF SR 32
2100854 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-02396
CONTINUOUS STEEL BEAM
2100854
DELAWARE COUNTY - ON US 35S OVER CSX RR, 0.10 MILE SOUTH
OF SR 32
2100855 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-05466
COMPOSITE CONTINUOUS STEEL BEAM
2100855
DELAWARE COUNTY - ON US 35N OVER SR 32, 3.51 MILES SOUTH
OF SR 67
2100856 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-05466
COMPOSITE CONTINUOUS STEEL BEAM
2100856
DELAWARE COUNTY - ON US 35S OVER SR 32, 3.51 MILES SOUTH
OF SR 67
2100857 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-02397
CONTINUOUS STEEL BEAM
2100857
DELAWARE COUNTY - ON US 35N OVER N AND S RAILROAD, 1.39
MILES NORTH OF SR 32
2100858 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-02397
CONTINUOUS STEEL BEAM
2100858
DELAWARE COUNTY - ON US 35S OVER N AND S RAILROAD, 1.39
MILES NORTH OF SR 32
2100859 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-05468
CONTINUOUS STEEL BEAM
2100859
DELAWARE COUNTY - ON US 35N OVER SR 67, 2.89 MILES SOUTH
OF SR 28
2100860 SUBSTRUCTURE REPAIR AND REHABILITATION (35)3-18-05468
CONTINUOUS STEEL BEAM
2100860
DELAWARE COUNTY - ON US 35S OVER SR 67, 2.89 MILES SOUTH
OF SR 28
2100861 BRIDGE COATING (35)3-18-02398 CONTINUOUS STEEL BEAM2100861
DELAWARE COUNTY - ON US 35N OVER OLD SR 3 RAMP, 2.26
MILES SOUTH OF SR 28
2100862 BRIDGE COATING (35)3-18-02398 CONTINUOUS STEEL BEAM2100862
DELAWARE COUNTY - ON US 35S OVER OLD SR 3 RAMP, 2.26
MILES SOUTH OF SR 28
October 29, 2027 0.00
D(C) E(M)
Completion Date DBE Goal:
Qualifications:
B -43605-A BRIDGE REPLACEMENT
Vincennes DistrictCall
Contract
Project Control No. LocationFederal/State No.
2002973 BRIDGE REPLACEMENT 47-00172 PRESTRESSED CONCRETE I-
BEAM
2002973
LAWRENCE COUNTY - ON CEMENT PLANT RD OVER
LEATHERWOOD CRK, 0.33 MILE E OF C ST
October 29, 2027 0.00
D(A) 0260
Completion Date DBE Goal:
B -43771-A BRIDGE AND SMALL STRUCTURE REPLACEMENT
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2100568 BRIDGE REPLACEMENT 058-03-10816 CONTINUOUS REINFORCED
CONCRETE SLAB
2100568
BARTHOLOMEW COUNTY - ON SR 58 OVER WHITE CREEK, 5.61
MILES WEST OF I-65
2501029 SMALL STRUCTURES AND DRAINS CONSTRUCTION CV 058-003-
116.81 CULVERT
2501029
BARTHOLOMEW COUNTY - ON SR 58 OVER UNT TO WHITE CREEK,
5.40 MILES WEST OF I-65
June 30, 2028 0.00
C(B) D(A)
Completion Date DBE Goal:
Qualifications:
B -44104-A BRIDGE REPLACEMENT
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2003032 BRIDGE REPLACEMENT 91-00240 CONTINUOUS REINFORCED
CONCRETE SLAB
2003032
WHITE COUNTY - ON CR 1300S OVER MOOTS CREEK, 0.49 MI W OF
SPRINGBORO ROAD
2003033 BRIDGE REPLACEMENT 91-00180 PRESTRESSED CONCRETE BOX
BEAM
2003033
WHITE COUNTY - ON CR 100E OVER BIG CREEK DITCH, 0.14 MI S
OF SMITHSON ROAD
April 28, 2028 0.00
D(A) 0250
Completion Date DBE Goal:
B -44107-A BRIDGE REPLACEMENT
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2003041 BRIDGE REPLACEMENT 64-00066 CONTINUOUS PRESTRESSED
CONCRETE BOX BEAM
2003041
PORTER COUNTY - ON CR 250W OVER PHILLIPS DITCH, 1.5 MILES
SOUTH OF SR 8
July 30, 2027 0.00
D(A) 0250
Completion Date DBE Goal:
Qualifications:
B -44108-A BRIDGE REPLACEMENT
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2003042 BRIDGE REPLACEMENT 64-00001 REINFORCED CONCRETE SLAB2003042
PORTER COUNTY - ON DIVISION ROAD OVER CROOKED CREEK,
3.5 MILES EAST OF SR 49
July 30, 2027 0.00
D(A) 0250
Completion Date DBE Goal:
Qualifications:
B -44269-A BRIDGE REHABILITATION OR REPAIR
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2101736 BRIDGE REHABILITATION OR REPAIR 18-00051 COMPOSITE
CONTINUOUS STEEL BEAM
2101736
DELAWARE COUNTY - ON MCGALLIARD ROAD OVER KILLBUCK
CREEK, 0.10 MILE W OF I-69
August 27, 2027 0.00
D(A) E(M)
Completion Date DBE Goal:
B -44287-A BRIDGE REPLACEMENT
Vincennes DistrictCall
Contract
Project Control No. LocationFederal/State No.
2101754 BRIDGE REPLACEMENT 26-00073 CONTINUOUS REINFORCED
CONCRETE SLAB
2101754
GIBSON COUNTY - CR 400N OVER PATOKA RIVER, 0.4 MILE WEST
OF CR 350E
October 01, 2027 0.00
D(A) 0250
Completion Date DBE Goal:
Qualifications:
B -44473-A REPLACE SUPERSTRUCTURE
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200681 BRIDGE DECK OVERLAY 056-88-02547 CONTINUOUS STEEL BEAM2200681
WASHINGTON COUNTY - ON SR 56 OVER HIGHLAND CRK AND CSX
RR, 0.07 MILE E OF SR 60
2200683 REPLACE SUPERSTRUCTURE 056-88-05590 CONTINUOUS STEEL
BEAM
2200683
WASHINGTON COUNTY - ON SR 56 OVER ELK CREEK, 1.93 MILES
WEST OF SR 39
October 24, 2028 0.00
B(A) D(A) C(B)
Completion Date DBE Goal:
B -44507-A BRIDGE DECK REPLACEMENT, REPLACE
SUPERSTRUCTURE AND DRAINS
Vincennes DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200519 SMALL STRUCTURES AND DRAINS CONSTRUCTION2200519
POSEY COUNTY - ON I-64 FROM 1.20 MILES W OF SR 69 TO 1.47
MILES W OF SR 165
2200525 BRIDGE DECK REPLACEMENT I64-05-05200 COMPOSITE
CONTINUOUS STEEL BEAM
2200525
POSEY COUNTY - ON I-64W OVER BLACK RIVER OVERFLOW, 0.96
MILE EAST OF SR 69
2200526 BRIDGE DECK REPLACEMENT I64-05-05200 COMPOSITE
CONTINUOUS STEEL BEAM
2200526
POSEY COUNTY - ON I-64E OVER BLACK RIVER OVERFLOW, 0.96
MILE EAST OF SR 69
2200527 BRIDGE DECK REPLACEMENT I64-05-05201 COMPOSITE
CONTINUOUS STEEL BEAM
2200527
POSEY COUNTY - ON I-64W OVER BLACK RIVER, 1.23 MILES EAST
OF SR 69
2200528 BRIDGE DECK REPLACEMENT I64-05-05201 COMPOSITE
CONTINUOUS STEEL BEAM
2200528
POSEY COUNTY - ON I-64E OVER BLACK RIVER, 1.23 MILES EAST
OF SR 69
2200529 REPLACE SUPERSTRUCTURE I64-06-05209 CONTINUOUS
REINFORCED CONCRETE SLAB
2200529
POSEY COUNTY - ON I-64W OVER WILSEY ROAD, 1.77 MILES EAST
OF SR 69
2200530 REPLACE SUPERSTRUCTURE I64-06-05209 CONTINUOUS
REINFORCED CONCRETE SLAB
2200530
POSEY COUNTY - ON I-64E OVER WILSEY ROAD, 1.77 MILES EAST
OF SR 69
May 01, 2029 0.00
D(B) 0260
Completion Date DBE Goal:
B -44595-A SMALL STRUCTURE REPLACEMENT
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200628 SMALL STRUCTURE REPLACEMENT CV 022-008-0.36 REINFORCED
CONCRETE BOX
2200628
CARROLL COUNTY - ON SR 22 OVER UNT TO WILDCAT CREEK,
0.42 MILES E OF SR 29
July 30, 2027 0.00
C(B) E(E)
Completion Date DBE Goal:
Qualifications:
B -44643-A BRIDGE THIN DECK OVERLAY
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200959 BRIDGE THIN DECK OVERLAY I65-233-02319 COMPOSITE
CONTINUOUS STEEL BEAM
2200959
NEWTON COUNTY - ON I-65N OVER NORFOLK SOUTHERN RR, 3.67
MILES NORTH OF SR 10
2200960 BRIDGE THIN DECK OVERLAY I65-233-02319 COMPOSITE
CONTINUOUS STEEL BEAM
2200960
NEWTON COUNTY - ON I-65S OVER NORFOLK SOUTHERN RR, 3.67
MILES NORTH OF SR 10
October 22, 2027 0.00
B(A) D(C) 0272E(C)
Completion Date DBE Goal:
Qualifications:
B -45066-A BRIDGE DECK OVERLAY
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2000967 BRIDGE DECK OVERLAY 006-57-07270 CONTINUOUS REINFORCED
CONCRETE SLAB
2000967
NOBLE COUNTY - ON US 6 OVER S FORK ELKHART RIVER, 3.41
MILES EAST OF US 33
October 29, 2027 0.00
B(A) D(A) 0272E(C)
Completion Date DBE Goal:
B -45068-A BRIDGE DECK OVERLAY
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
2000441 BRIDGE DECK OVERLAY 041-23-06733 CONTINUOUS REINFORCED
CONCRETE SLAB
2000441
FOUNTAIN COUNTY - ON US 41 OVER IRISH RUN CREEK, 1.27
MILES SOUTH OF US 136
October 31, 2027 0.00
D(A) E(C) 0272
Completion Date DBE Goal:
Qualifications:
B -45599-A SCOUR PROTECTION
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2400522 SCOUR PROTECTION 040-30-01705 REINFORCED CONCRETE SLAB2400522
HANCOCK COUNTY - ON US 40 OVER LITTLE BRANDYWINE CRK,
1.27 MILES EAST OF SR 9
December 15, 2026 0.00
C(B)
Completion Date DBE Goal:
B -45612-A SCOUR PROTECTION
Greenfield DistrictCall
Contract
Project Control No. LocationFederal/State No.
2400484 SCOUR PROTECTION 052-30-04008 CONTINUOUS REINFORCED
CONCRETE SLAB
2400484
HANCOCK COUNTY - ON US 52 OVER LITTLE SUGAR CREEK, 3.22
MILES W OF SR 9
2400488 SCOUR PROTECTION 103-33-06304 CONTINUOUS PRESTRESSED
CONCRETE I-BEAM
2400488
HENRY COUNTY - ON SR 103 OVER LITTLE BLUE RIVER, 1.99 MILES
N OF SR 38
2400523 SCOUR PROTECTION 052-70-06718 CONTINUOUS PRESTRESSED
CONCRETE I-BEAM
2400523
RUSH COUNTY - ON US 52 OVER LITTLE BLUE RIVER, 6.89 MILES
W OF SR 44
May 15, 2027 0.00
C(B) 0250
Completion Date DBE Goal:
Qualifications:
T -44365-C TRAFFIC SIGNALS MODERNIZATION
Vincennes DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200945 TRAFFIC SIGNALS MODERNIZATION2200945
LAWRENCE COUNTY - ON VARIOUS ROADS THROUGHOUT THE
VINCENNES DISTRICT
May 29, 2027 0.00
E(A)
Completion Date DBE Goal:
T -44476-A INSTALL NEW CABLE RAIL BARRIERS
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200939 INSTALL NEW CABLE RAIL BARRIERS2200939
DEARBORN COUNTY - ALONG I-275 FROM 1.7 MI NORTH TO 0.71 MI
SOUTH OF EXIT 17
July 30, 2027 0.00
A(A) E(K)
Completion Date DBE Goal:
Qualifications:
T -44477-A TRAFFIC SIGNALS MODERNIZATION
Seymour DistrictCall
Contract
Project Control No. LocationFederal/State No.
2200937 TRAFFIC SIGNALS MODERNIZATION2200937
VARIOUS COUNTIES - ON US 31 AT STANSIFER AVE, EASTERN
BLVD, LEWIS AND CLARK PKY
October 01, 2027 0.00
E(A)
Completion Date DBE Goal:
Qualifications:
T -45742-A TRAFFIC SIGNALS MODERNIZATION
Crawfordsville DistrictCall
Contract
Project Control No. LocationFederal/State No.
2400861 TRAFFIC SIGNALS MODERNIZATION2400861
VIGO COUNTY - ON US 41 AT WOODSMALL DRIVE, 0.57 MILE
NORTH OF SR 641
2400862 TRAFFIC SIGNALS MODERNIZATION2400862
CLAY COUNTY - ON US 40 AT CR 200W, 0.33 MILE WEST OF SR 340E
2400864 TRAFFIC SIGNALS MODERNIZATION2400864
VIGO COUNTY - ON US 41 AT JESSICA DRIVE, 0.4 MILE NORTH OF
SR 641
April 30, 2027 0.00
E(A)
Completion Date DBE Goal:
T -45968-A UN-SIGNALIZED INTERSECTION SIGN AND MARKING
VISIBILITY
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2401521 UN-SIGNALIZED INTERSECTION SIGN AND MARKING VISIBILITY2401521
ALLEN COUNTY - ON VARIOUS ROADS THROUGHOUT THE FORT
WAYNE DISTRICT
September 18, 2027 0.00
E(D)
Completion Date DBE Goal:
Qualifications:
T -45970-A PAVEMENT MARKINGS
Fort Wayne DistrictCall
Contract
Project Control No. LocationFederal/State No.
2401587 PAVEMENT MARKINGS2401587
ALLEN COUNTY - ON WASHINGTON CTR RD AND ST JOSEPH CTR
RD AT VAR LOCATIONS
June 19, 2027 0.00
E(A) E(D) E(Q)E(G)
Completion Date DBE Goal:
Qualifications:
T -46035-A SIGNING
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2401594 SIGNING2401594
LAPORTE COUNTY - ALONG VARIOUS ROADS IN THE CITY OF
LAPORTE
September 07, 2027 0.00
E(D)
Completion Date DBE Goal:
T -46103-A RAISED PAVEMENT MARKINGS, REFURBISHED
LaPorte DistrictCall
Contract
Project Control No. LocationFederal/State No.
2500073 RAISED PAVEMENT MARKINGS, REFURBISHED2500073
VARIOUS COUNTIES - ON VARIOUS ROADS THROUGHOUT THE
LAPORTE DISTRICT
June 25, 2027 0.00
Completion Date DBE Goal: