BRHwaterfallsSOI.docx

DOCX document 16 KB Posted

Attached to
Black River Harbor Waterfall Overlook Reconstruction Federal contract opportunity
Solicitation number
12445525B0016
Issued by
Department of Agriculture Forest Service

About this file

This document is a Schedule of Items (SOI) for the Black River Harbor Waterfall Overlook Reconstruction project in the Ottawa National Forest, Gogebic County, Michigan, solicited by the USDA Forest Service. The SOI outlines a base bid and optional line items for site reconstruction, including mobilization and overlook site work at multiple waterfall locations (Rainbow Falls, Potawatomi/Gorge Falls, Sandstone Falls, and Great Conglomerate Falls). The procurement will be awarded on a best value basis, with the government reserving the right to award all, part, or none of the contract. Bidders are required to enter an amount for each line item, with the total base bid and options to be calculated, and the estimated quantity for each unit is one lump sum (LS).

Key response details include a deadline for questions on September 24, 2025, indicating this is a future procurement for a 2026 project. The solicitation (Number 12445525B0016) involves rehabilitation of waterfall overlooks, with multiple site-specific construction elements that suggest comprehensive site improvements and potentially accessibility enhancements. The procurement is being conducted directly by the Department of Agriculture Forest Service, with a structured bidding approach that allows for flexible award options based on the government's assessment of overall value.

View the file

Other files for this federal contract opportunity

Other files attached to Black River Harbor Waterfall Overlook Reconstruction, newest first.
File Type Posted
Sol_12445525B0018_Amd_0002.pdf PDF
Sol_12445525B0018_Amd_0001.pdf PDF
RFI Questions BlackRiver.pdf PDF
241747 BRHRA Waterfall Overlook Platforms and Access Stairs Phase 2 Geotech Report.pdf PDF
MJ1709.04_Waterfall Overlooks Design-Technical Specifications.pdf PDF
MJ1709.04_Waterfall Overlooks Design-Drawings.pdf PDF
Sol_12445525B0018.pdf PDF
WDOL_DBA_Gogebic.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B - SCHEDULE OF ITEMS

Black River Harbor Waterfall Overlook Reconstruction 2026

OTTAWA NATIONAL FOREST

GOGEBIC COUNTY, MICHIGAN

BASIS OF AWARD

Bidders shall enter an amount for each item. The Government intends to award one contract for the items listed below to the Contractor who provides the best overall value to the Government. The Government reserves the right to award all, part or none of the contract.

Item No.
Description
Method of Measure
Pay Unit
Estimate of Quantity
Amount
01
Mobilization
Unit
LS
1
$
02
Rainbow Falls Overlook Site
Unit
LS
1
$
03
Potawatomi/Gorge Falls Overlook Site
Unit
LS
1
$
Total Base Bid
$
OP-01
Sandstone Falls up to Helical Piles w/ Beams
Unit
LS
1
$
OP-02
Sandstone Falls Completion
Unit
LS
1
$
OP-03
Great Conglomerate Falls Overlook Site
Unit
LS
1
$
Total Base Bid and Options
$