This is a janitorial service specifications document for the Brewton Career Center in Brewton, Alabama, detailing cleaning requirements for their 5,250 square foot facility. The service period runs from March 1, 2025 (or date of award) through September 30, 2025, with nightly services to be performed five nights per week after 5:00 p.m. Monday through Friday. A mandatory site visit and certification is required prior to bid submission, which must be documented with signatures from both the contractor and Career Center Manager. The scope includes daily, weekly, monthly, and quarterly cleaning tasks for offices, breakrooms, conference rooms, restrooms, lobby areas, corridors, and parking lots.
The document outlines contractor requirements including providing all labor, materials, equipment, and supervision, with some supplies (paper towels, toilet tissue, hand soap, trash liners) furnished by the state. Payment terms specify that due to the fiscal year transition, October payments may take 30-45 days to process. No subcontracting is permitted without written approval, and contractors must maintain local service representatives. The specifications note that failure to submit references with the bid or complete the mandatory site visit certification may result in bid rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quick_Quote_Standard_Boilerplate_updated_12.18.2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
***Brewton Career Center – Janitorial Service Specifications ***
Location: Brewton Career Center
| 1023 Douglas Avenue, Suite 314 |
| Brewton, AL 36426 |
Career Center Manager: Angie Kelley (251) 867-4376
Service Period: March 1, 2025 (Or Date of Award) through September 30, 2025. Service will not begin until March 1, 2025, at the earliest.
***Contact the Career Center Manage to Schedule Appointment to Tour Facility***
Section I: Scope Contractor shall furnish all labor, material, equipment, and supervision, to maintain the facility in a clean and sanitary condition and in accordance with the following specifications. All nightly services are to be performed five nights each week, after 5:00 p.m. Monday through Friday. No cleaning operation will be after 12:00 midnight without written permission by the department.
Section IA: Key Control
1. The contractor shall adequately secure the keys, key cards, other entry devices and codes provided by the state.
2. Any such item which becomes lost, missing, or stolen shall be immediately reported to the department supervisor by the contractor. Should the contractor lose or have stolen any keys issued to the contractor by the state, the cost of changing locks or keys to buildings, rooms or areas accessible by the lost or stolen keys will be deducted from the contractor’s invoice to the state for the work performed under this contract. This will also pertain to cancellation of a service when the keys are not turned in within 24 hours.
Section II: Examination of Buildings Contractor is to conduct a thorough and complete examination of the approximately 5,250 square foot facility prior to submitting a bid. Contractor and Career Center Manager or Supervisor must sign and date stating a site visit was conducted. The mandatory site visit certification sheet must be attached when submitting the bid. Failure of contractor to completely familiarize himself with the building conditions and requirements prior to submitting the bid, will not relieve the bidder of the responsibility in meeting the specifications. By having your bid signed and dated by the manager, supervisor or person in charge will indicate that the contractor fully understands the conditions of the buildings and the cleaning that is required to do a satisfactory job.
Section III: Technical Assistance Contractors are to have an adequate service organization with local representatives and cleaning personnel. The service representatives must be employed by the contractor or designated by himself as their authorized representatives on a fulltime basis and not as a sub-contractor. There will not be any sub-contracting at any time, unless written approval is given by the department.
Section IV: Supervisory Personnel and Supplies Contractor must furnish competent and skilled persons to assure quality and performance within the terms and conditions of the contract. There will not be any children under the age of eighteen or pets allowed on premises during cleaning operations. The supervisor’s name, address, and phone number will be given to the department supervisor at each location. The supervisor may be a working supervisor but must make sufficient inspections and follow-up program to ensure the services are performed as specified. Contractor must post the regulations governing his employees while in the building and post a copy of the cleaning schedule in each supply closet.
Department may approve or disapprove any products or equipment. Non-slip floor wax will be the only approved wax for all tile floors.
Section V: Qualifications of Contractor In evaluating each contractor, consideration will be given to the following criteria: deficiency in any of the below listed areas may be adequate reason for bid rejection:
1. Failure to submit references with bid.
2. Due to the fiscal year ending on September 30th and the new fiscal year beginning October 1st, payments for services may take up to 30-45 days before contractor receives payment for October.
Section VI: Items Furnished by the State or Contractor
1. Paper towels, toilet tissue, hand soap, trash can liners and liners for sanitary napkin holders will be furnished by the state. Contractor to replace in dispensers and trash cans. All dispensers are furnished and installed by the state.
2. Invoice to be rendered at the end of each month in arrears by vendor. Contact the department for payment of services.
Section VII: Cleaning Schedule and duties to be performed by Contractor:
Monthly Cleaning Schedule and duties to be performed by Contractor:
*****d = daily / n = nightly / w = weekly / m = monthly *****
1. Offices, Breakroom, and Conference Rooms:
1. Empty waste baskets. Replace all obviously soiled or torn liners in wastebaskets. Wastepaper and trash will be put into trash can/dumpster in the supply room. (n)
1. Dust mop tile floors, take care to get under furniture and into corners, and the edge of walls and doorways. (n)
1. Damp mop tile floors to remove all foreign matter and/or spillage. (n)
1. Wet mop and spot wax floor where areas show excessive wear. (w)
1. Vacuum and spot clean all carpets. (d)
1. Dust and/or vacuum vents in ceilings walls. (m)
1. Spray buffs all uncarpeted floors. (m)
1. Vacuum all fabric furniture. (m)
1. Thoroughly dust all horizontal surfaces, including all available front counters, lobby tabletops, desktops, tables, file cabinets, windowsills, chairs, and ledges. (w)
1. Remove noticeable accumulations of dust on chair bottoms, base of coat racks, bottom of typewriter stands, doors, etc. (m)
1. Remove handprints from glass topped desks, doors, etc. (w)
1. Remove handprints from around light switches and door frames. (w)
1. Spot clean walls. (w)
1. Clean and polish bright metal to hand height. (w)
1. Clean all glass in partitions and doors (both sides). (w)
1. Sanitize all door handles. (n)
1. Clean all windowsills. (m)
1. Dust and wipe all telephones. (w)
1. Sanitize all telephones. (n)
1. Dust all vertical surfaces such as desks, file cabinets, and chairs. (w)
1. Remove dust from all hard-to-reach areas such as tops of high cabinets, picture frames, baseboards, light fixtures and any other surface not serviced daily. (w)
1. Clean, dust, sanitize, and remove debris from computer stations and chairs. COMPUTERS AND KEYBOARDS TO BE CLEANED BY THE CAREER CENTER. (n)
1. Clean, disinfect with germicidal solution and polish drinking fountains. (n)
1. Employee’s breakroom, tile floors, and backsplash on the counter are to be damp mopped, counter/tables, and sinks are to be kept clean and disinfected. (n)
1. Wash out trash receptacles using a disinfectant. (w)
1. Front entrances & sidewalks to be kept clean. (n)
1. If janitorial personnel utilize the heating or air conditioning system, they are to be placed at proper setting before leaving. (n)
1. Supply closets to be kept clean and neat. (n)
1. Sanitize front counter at entrance. (w)
1. Restrooms:
1. Empty all containers and disposals. (n)
1. Clean mirrors. (n)
1. Clean entrance door. (w)
1. Clean towel cabinet covers. (w)
1. Clean and disinfect with a germicidal detergent solution on all wash basins, commodes, toilet seats, urinals, hardware, and adjacent surfaces. (n)
1. Clean toilets and urinals with an acid-type bowl cleaner and bowl mop. (w)
1. Sanitize all door handles. (n)
1. Remove fingerprints from stall doors. (w)
1. Remove splash marks from walls around wash basins and urinals. (n)
1. Wet mop restroom floors using a germicidal detergent solution. (n)
1. Empty waste baskets. Replace all obviously soiled or torn liners in wastebaskets. Wastepaper and trash will be put into trash can/dumpster in the main disposal area. (n)
1. Clean exterior of plumbing under sinks. (w)
1. Clean exterior of plumbing around faucets. (n)
1. Wash trash receptacles using a disinfectant. (w)
1. Dust and/or vacuum vents in ceilings/walls. (m)
1. Refill all soap containers in bathroom and kitchen. (w)
1. Lobby Entranceways and Corridors:
1. Dust and damp mop floors. (n)
1. Dust and clean to remove fingerprints from all glass. (n)
1. Entryway/Exit mats inside and outside must be swept, vacuumed, cleaned under. Two entrance mats are adhered to the floor and are not to be taken up. (n)
1. Empty trash receptacles. (n)
1. Sanitize and polish kick plates and push bars. (n)
1. Carpets and Floors:
1. Sweep and mop all tile floors, moving rugs where needed. (n)
2. Vacuum all carpet areas including under the desk. (n) E. Parking Lot:
1. Remove all trash and debris from the parking lot. (n) Quarterly Services: (March, June, September. And December) – Scheduling of Quarterly Services must be in writing in advance of service
1. Thoroughly strip, rinse, and apply two coats of finish to all tile floors.
1. Clean all restroom base tiles, floors, and grout to include solvent base sealing.
1. Shampoo or steam clean all carpets. The method used depends upon the type of carpet.
1. Dust all corridor walls up to the ceiling with untreated mop or vacuum. Dust or clean ceiling vents.
1. Clean all light fixtures thoroughly.
1. Clean all windows (inside and outside).
1. Dust all blinds or wash if necessary.
1. Clean all baseboards, molding, and chair rails thoroughly
1. Clean/ dust ceiling fans.
MANDATORY SITE VISIT CERTIFICATION
Certification of Inspection:
This statement certifies that the vendor has inspected the facility and is aware of all the requirements, terms, and conditions. Building Square footage provided is an estimate and does not reflect the cleaning square footage. It is the responsibility of the vendor to verify the actual square footage pertaining to this bid. To validate this certification, the vendor and agency management (manager, supervisor, etc.) must sign in the spaces provided. This signed statement must be returned with the bid or the bid will be rejected.
Vendor’s Signature: _________________________________________ Date: ____________
Agency Signature: __________________________________________ Date: ____________
Title: __________________________________________________
File details come from the government source that posted it. Updated .