BRC 202610700 SAFS.pdf

PDF 136 KB Posted

Attached to
AD Project #202610700 Bristol Community College, Taunton
Solicitation number
BD-27-1019-DCP06-OOL01-131801
Issued by
Bristol County, Massachusetts

About this file

This Space Allocation and Finish Schedule document, prepared for Bristol Community College in Taunton, Massachusetts under Project Number 202610700, outlines the facility requirements for a ten-year lease of approximately 14,400 usable square feet of classroom, laboratory, and office space. The project specifies a total allocation of 14,383 usable square feet distributed across three primary categories: 3,016 square feet for staff areas accommodating 16 personnel, 11,297 square feet for support areas including classrooms and laboratories, and 70 square feet for entry and meeting areas. The staff areas include offices for a campus dean, full-time and part-time instructors, advisors, administrative personnel, and support staff, along with designated restrooms and equipment storage. The support areas comprise five general purpose classrooms at 550 square feet each, two computer laboratories, one biology laboratory, science preparation room, copy/mail room, student facilities including restrooms and lounge areas, and a learning commons and conference room.

The detailed specifications include specific flooring requirements, security provisions, utility specifications, and furniture configurations for each space type. Personnel allocations total 17 staff members with designated seating, and the layout incorporates circulation space calculated at 40 percent for staff areas and 30 percent for support areas. The Massachusetts Department of Capital Asset Management and Maintenance (DCAMM) indicated flexibility in the total usable area requirement, accepting proposals ranging from 13,500 to 17,000 square feet. The specifications detail finish requirements such as resilient tile flooring for classrooms and laboratories, carpet for offices and meeting spaces, and ceramic tile for restrooms, along with comprehensive information technology infrastructure including voice, data, and power outlets distributed throughout the facility.

View the file

Other files

File Type Posted
BRC 202610700 SNDA.pdf PDF
BRC 202610700 Ten-Year Lease Proposal Form.docx DOCX document
BRC 202610700 Warning.pdf PDF
BRC 202610700 10-year Office Lease.pdf PDF
BRC 202610700 RNDA.pdf PDF
BRC 202610700 Technical Exhibit.pdf PDF
BRC 202610700 RFP.pdf PDF
BRC 202610700 Estoppel Certificate.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRISTOL COMMUNITY COLLEGE

TAUNTON

Project Number 202610700

SECTION B-3

SPACE ALLOCATION AND FINISH SCHEDULE

A TOTAL OF APPROXIMATELY 14,400 USABLE SQUARE FEET

July 2026

B-3. SPACE ALLOCATION AND FINISH SCHEDULE

Project Number 202610700

July 2026

SUMMARY OF SPACE ALLOCATION

Staff Count Seat Count Usable Area

Staff Areas 16 16 3,016

Support Areas 0 0 11,297

Entry & Meeting Areas 1 1 70

TOTAL: 17 17 14,383

TAUNTON

BRISTOL COMMUNITY COLLEGE

TOTAL PARTI- FLOOR NOTATIONS ON

STAFF SEATS SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

STAFF AREAS

Campus Dean 1 1 220 220 220 Full CPT Lock, sidelight Instructors, Part time 4 4 36 144 144 UA-Wkstn CPT Instructors, Full time 2 2 36 72 72 UA-Wkstn CPT Advisor, full time 1 1 100 100 100 Full CPT Lock, sidelight ITS 1 1 100 100 100 Full CPT Lock, sidelight Administrative Assistant 1 1 100 100 100 Full CPT Lock, sidelight Admissions, full time 1 1 100 100 100 Full CPT Lock, sidelight Financial Aid, full time 1 1 100 100 100 Full CPT Lock, sidelight Reference Librarian, part time 1 1 36 36 36 UA-Wkstn CPT Mental Health Counselor, P.T. 1 1 100 100 100 Full CPT Lock, sidelight Visiting Resources/Intern 2 2 36 72 72 UA-Wkstn CPT Staff Restrooms 2 160 320 320 Full CER Subtotal Staff Areas 16 16 1,144 320 1,464

EQUIPMENT IN OPEN AREAS

Enrollment and Security 1 400 400 400 Open CPT 6-duplex outlets, 6-data drops Wellness Room 1 100 100 100 Full CPT Lock, in-use dial, 4' of bas cabinet with sink and faucet File Cabinets (VF) 8 7.5 60 60 Open CPT File Cabinets (LF) 8 9 72 72 Open CPT Storage Cabinet 2 9 18 18 Open CPT Shredding bins 2 5 10 10 Open CPT Fax/Printer Area 1 30 30 30 Open CPT

Subtotal Equipment in Open Areas 690 690 List of Abbreviations Subtotal 16 16 1,144 1,010 2,154 SF Usable Square Feet Circulation 40% 862 Full Office or room with full height partitions and door

TOTAL USABLE AREA 3,016 UA-Wkstn Open area with user agency-installed systems furniture LL-Wkstn Open area with landlord-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring V/D/P Combination Voice, Data, Power Outlet AV Audio-Visual SDT Static Dissipative Tile CER Non-Skid Ceramic Tile Flooring Conc Concrete

Staff Areas

TYPE OF ROOM OR AREA

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Bristol Community College

TAUNTON

PERSONNEL SPACE SUPPORT SPACE

Project Number 202610700

STAFF SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

Classrooms and meeting areas General Purpose Classroom 5 550 2,750 2,750 Full RTF Lock, vision panel, wall blocking, ceiling blocking, ceiling P/D for User

Agency supplied AV, V/D/P to User Agency supplied lectern.

Computer Lab 2 550 1,100 1,100 Full RTF Lock, vision panel, wall blocking, ceiling blocking, ceiling P/D for User

Agency supplied AV, 2-data and 2-duplex outlets to User Agency supplied lectern, 20 V/D/P outlets .

Biology Laboratory 1 1,100 1,100 1,100 Full RTF Lock, vision panel, wall blocking, ceiling blocking, ceiling P/D for User Agency supplied AV, V/D/P to User Agency supplied lectern, 2-data drops and 4-duplex outlets at each lab bench.

Science Preparation 1 400 400 400 Full RTF Lock, vision panel, wall blocking, ceiling blocking, ceiling P/D for User Agency supplied AV, V/D/P to User Agency supplied lectern, 2-data drops and 4 -duplex outlets at each lab bench.

Copy/Mail Room 1 90 90 90 Open RTF Alcove configuration, 3-20A outlets, 6' counter, cabinets, upper shelves Main Distribution Frame (MDF) 1 150 150 150 Full RTF Card Access, vision panel, 24/7 cooling; Please refer to LL Improvements

Specifications Intermediate Distribution Frame (IDF) 1 80 80 80 Full RTF Card access, sidelight Staff Support Room 1 240 240 240 Full RTF Lock, sidelight, counter, 8'-lower and upper cabinets, sink, 3-20 amp GFI duplex dedicated circuit outlets, Student Restrooms 2 300 600 600 Full CER Unisex Restroom 1 80 80 80 Full CER Thumb latch with "in-use" indicator Storage/Supply Room 1 100 100 100 Full RTF Lock, Vision Panel, 12-P/D outlets Learning Commons 1 800 800 800 Full CPT Lock, vision panel Student Lounge 1 800 800 800 Open CPT 12-PD outlets, 3 20A outlets, bottle filling station-H2O Reverse Osmosis

(RO) system, 2-V/D/P 60"off finish floor and wall blocking for U/A provided A/V

Conference Room 1 400 400 400 Full CPT Lock, sidelight, floor core, wall and ceiling blocking, ceiling P/D for User Agency supplied AV

Subtotal Support Areas 8,690 8,690 List of Abbreviations Subtotal 8,690 8,690 SF Usable Square Feet Circulation 30% 2,607 Full Office or room with full height partitions and door

TOTAL USABLE AREA 11,297 UA-Wkstn Open area with user agency-installed systems furniture LL-Wkstn Open area with landlord-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring V/D/P Combination Voice, Data, Power Outlet AV Audio-Visual SDT Static Dissipative Tile CER Non-Skid Ceramic Tile Flooring Conc Concrete

Support Areas

TYPE OF ROOM OR AREA

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Bristol Community College

TAUNTON

Project Number 202610700

PERSONNEL SPACE SUPPORT SPACE

STAFF SEAT SF SUBTOTAL UNITS SF SUBTOTAL SF TIONS COVER SPECIFICATIONS (cf. RFP section B-2)

ENTRY AREAS

Receptionist/Transaction Counter 1 1 50 50 50 Open CPT 2-V/D/P 60"off finish floor and wall blocking for U/A provided A/V

Subtotal Entry Areas 1 1 50 0 50 List of Abbreviations Subtotal 1 1 50 0 50 SF Usable Square Feet Circulation 40% 20 Full Office or room with full height partitions and door

TOTAL USABLE AREA 70 UA-Wkstn Open area with user agency-installed systems furniture LL-Wkstn Open area with landlord-installed systems furniture Open Open area with no partitions CPT Carpet RTF Resilient Tile Flooring V/D/P Combination Voice, Data, Power Outlet AV Audio-Visual SDT Static Dissipative Tile CER Non-Skid Ceramic Tile Flooring Conc Concrete

TYPE OF ROOM OR AREA

Entry Area

B-3. SPACE ALLOCATION AND FINISH SCHEDULE: Bristol Community College

TAUNTON

Project Number 202610700

PERSONNEL SPACE SUPPORT SPACE

Cover
Summary
Staff
Support
Entry & Meeting

File details come from the government source that posted it. Updated .