BrandNameJustificationRedacted.pdf
PDF 222 KB Posted
- Attached to
- CVN Workstations Federal contract opportunity
- Solicitation number
- N6449825Q0196
About this file
The document is a Brand Name Justification for SAFCO TechWorks operator workstations for the Naval Sea Systems Command (NSWC). The procurement is for two 60" workbenches, three 48" workbenches, and eight L-Shaped workbenches with associated shelving, drawers, cable management, power management, and cabinets, totaling $72,348.26. These workstations will support the Machinery Control and Monitoring System (MCMS) Land Based Testing Facility (LBTF) for the CVN 78 Class program.
The justification details extensive market research conducted with Uline, Global Industrial, and McMaster-Carr, which found that alternative products could not meet critical requirements, including mounting specific 24.25" x 23.75" Operator Interface Panels (OIPs), supporting expansion modularity, rapid reconfiguration for different ship hulls, and compatibility with existing CVN 68 Class framework. SAFCO TechWorks was determined to be the only vendor meeting all requirements, with the added benefit of having a GSA contract that reduces government procurement costs. The pricing reflects a 5-10% increase due to recent market inflation, consistent with previous contract awards.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 1449 - N6449825Q0196.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRAND NAME JUSTIFICATION – SAFCO TechWorks
1. DESCRIPTION OF REQUIRED SUPPLIES/SERVICES, ESTIMATED
VALUE, AND DELIVERY REQUIREMENTS
The subject requisition is for a brand name requisition of SAFCO TechWorks operator workstations: two (2) 60” workbenches, three (3) 48” workbenches, and eight (8) “L- Shaped” workbenches including; shelving, drawers, cable management, power management, and cabinets for said benches. This will supply the Machinery Control and Monitoring System (MCMS) Land Based Testing Facility (LBTF) used by the future In- Service Engineering Agent (ISEA) personnel to support the CVN 78 Class program using MCMS software and hardware.
Total estimated value for all items is $72,348.26. Reference CFI Quote. Delivery will be to NSWCPD.
This requisition is for the following material and includes shipping and handling:
Product Description Part Number Quantity Unit Price Total Cost
TechWorks 72"W x 48" x 30"D L.h Adjustable L" Bench with High Pressure Laminate Surface
TWBL30LHH3
$ 1,436.41
$ 5,745.64
TechWorks 72"W x 48" x 30"D R.h Adjustable L" Bench with High Pressure Laminate Surface
TWBL30RHH3
$ 1,436.41
$ 5,745.64
TechWorks 60"W x 30"D Adjustable Bench with High Pressure Laminate Surface
TWB6030H3
$ 943.33
$ 1,886.66
TechWorks 48"W x 30"D Adjustable Bench with High Pressure Laminate Surface
TWB4830H3
$ 913.77
$ 2,741.31
TechWorks 72"W x 48"D x 48"H, Upper "L" Frame, Non- Handed
TWULF48
$ 869.43
$ 3,477.72
TechWorks 72"W x 48"H, Upper Frame TWUF7248 4 $ 563.57 $ 2,254.28 TechWorks 18"D x 24"W, High Pressure Laminate Corner Shelf
TWCS2418H3
$ 534.39
$ 2,137.56
TechWorks 24"W x 12"D x 16"H, Lockable Storage Bin TWOHST24 14 $ 511.65 $ 7,163.10
TechWorks 48"W x 48"H, Upper Frame TWUF4848 3 $ 480.95 $ 1,442.85
2-Drawer Lateral File, 30"W x 18 5/8"D x 28"H HLT302 5 $ 476.02 $ 2,380.10
TechWorks 18"D x 48"W, High Pressure Laminate Fixed
TWFS4818H3
$ 397.57
$ 4,373.27
TechWorks 18"D x 24"W, High Pressure Laminate Fixed
TWFS2418H3
$ 360.81
$ 2,886.48
TechWorks 72"W, Horizontal Cable Management, Black TWCBLBSK72 8 $ 289.18 $ 2,313.44
TechWorks 24"W x 48"H, Tackable Fabric Screen TWFP2448 30 $ 279.32 $ 8,379.60
TechWorks 20"W x 48"H, Tackable Corner Fabric Screen TWFPC2048 8 $ 246.35 $ 1,970.80
TechWorks 48"W, 15 amp Power Strip, 16 outlets, 15' cord` TWSPW4815 10 $ 223.61 $ 2,236.10
Dealer Installation Installation 1 $ 15,213.71
$ 15,213.71
TOTAL
$ 72,348.26
2. SUPPORTING DOCUMENTATION FOR BRAND NAME BASED ON
CONTRACTOR’S UNIQUE QUALIFICATIONS OR NATURE OF THE
ACQUISITION
Products must be able to (1) mount CVN 78 Class shipboard and LBTF equipment, (2) have expansion modularity for growth, (3) support rapid reconfiguration to support different ship hulls and configurations, and (4) compatibility with the CVN 68 Class existing framework to leverage existing in-house equipment.
SAFCO TechWorks product line meets all the above requirements for the operator workstations LBTF equipment. NSWCPD representatives worked with SAFCO representatives to create a drawing package for the proposed furniture that would meet the stakeholders’ needs, allowing for future growth; see 1332429A-Project Drawing.pdf.
SAFCO has a GSA contract, reducing the cost to the government to procure TechWorks material.
If SAFCO TechWorks product is not procured, due to LBTF size limitations, C513 would have less workstations. This would limit the ability for the lab to function properly by not fully displaying pertinent lab equipment (e.g. Simulation/Stimulation workstations, MCS workstations, and development workstations). Also, due to specific components C513 will be able to mount Operator Interface Panels (OIPs) onto the workstation. Other products that were researched could not successfully mount the size of the OIP required to support CVN 78 MCMS tasking.
3. MARKET SURVEY
Market research was conducted at other sources such as Uline, Global Industrial, and McMaster-Carr. All three sources have similar workbench configurations, but they do not meet two (2) of the four (4) requirements, listed in part 2 of this document. They support expansion modularity for growth and rapid reconfiguration for different ship hulls, but they fail at supporting mounting CVN 78 Class shipboard and LBTF equipment as well as leveraging existing in-house equipment.
None of these suppliers had equipment that met the requirements in terms of being able to mount ship-board equipment, expansion modularity, rapid reconfiguration to support different ship hulls, and compatibility with the CVN 68 Class existing framework. See specific requirements failures below:
Uline product numbers H-6341, H-6842, and H-9628 do support the requirements of rapid reconfiguration, and expansion modularity, but they fail to meet the remaining requirements. They cannot mount 24.25” x 23.75” OIPs which need to be mounted onto the operator workstations. Uline product numbers H-5767 and H-5768 have dimensions of 18” x 19”. These fit to existing mounting holes on product numbers H-6341, H-6842, and H-968. Additionally, they are not compatible with the existing TechWorks products that are already in-house. To support the growth of CVN 78 LBTF, the products need to be able to leverage already in-house equipment.
Similarly to Uline, Global Industrial has product numbers WB606998BL, WB606976BL, and WB607002BL which meet the rapid reconfiguration and expansion modularity requirements but fail to mount the 24.25” x 23.75” OIPs. This can be seen by products numbers WB249289ABL and WB249288ABL having dimensions of 18” x 19”. These mount to existing holes and cannot support the dimensions of the 24.25” x 23.75” equipment. Again, the Global Industrial product lines cannot leverage already in-house equipment that will be used for growth.
McMaster-Carr products 5169T401 and 9956T23 can be combined to create a 60” x 30” workbench. Products 5169T803 and 9956T23 can be combined to create a 72” x 30” workbench. A 48” x 30” workbench cannot be natively configured using their available products. Product 45065T61 can be attached to the 60” x 30” workbench to add shelves and product 45065T63 can be attached to the 72” x 30” workbench. However, these upper shelving units have no capability to mount the 24.25” x 23.75” OIPs, thus failing one of the requirements. Additionally, in-house equipment is not physically compatible with the McMaster-Carr product line.
4. ADDITIONAL FACTS
The price has increased by approximately 5 – 10 % per item when compared to the most recent C513 CGMCS award Contract# N6449822P0038 from 2022. This price increase is due to inflation costs that have hit the market over the last few years. The CGMCS award experienced similar inflation costs from the most recent award to the CVN 68 Class in 2018.
Office Installation Service, Inc. could only provide pricing for the installation – not the materials, and could not provide a CAGE code.
5. APPROVALS:
I certify that the statements and information provided above, are complete and correct to the best of my knowledge. I understand that the processing of this justification precludes the use of full and open competition.
Digitally signed by VOUGHT.DAVID.M.1274793402 Date: 2025.05.23 13:10:39 -04'00'
Signature of Cognizant Requisition Originator Date
Digitally signed by CARUSO.CHAD.A.1523780774 Date: 2025.05.23 14:32:14 -04'00'
Signature of 1st Level Supervisor Date
Signature of Contracting Officer Date
CARUSO.CHAD.A.1523780774
VOUGHT.DAVID.M.1274793402
| 1. DESCRIPTION OF REQUIRED SUPPLIES/SERVICES, ESTIMATED VALUE, AND DELIVERY REQUIREMENTS |
| 2. SUPPORTING DOCUMENTATION FOR BRAND NAME BASED ON CONTRACTOR’S UNIQUE QUALIFICATIONS OR NATURE OF THE ACQUISITION |
| 3. MARKET SURVEY |
| 4. ADDITIONAL FACTS |
| 5. APPROVALS: |