This document is a Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items for the replacement of damaged/used components of the Compact Action Target Mechanism (CATM) range at F.E. Warren AFB, Wyoming. The 90th Contracting Squadron has a requirement to replace 25 TCT3 bullet plates, 20 TCT4 heavy duty mouth bottoms, and 20 TCT4 heavy duty mouth tops, which are proprietary to Action Target, Inc. The justification cites 10 U.S.C. 3204, which permits other than full and open competition since these components are only available from the original manufacturer. The estimated cost is $654,874, and the required delivery date is 200 calendar days after award. The Government will consider any responses received within 7 days with pricing and technical documentation to potentially compete this requirement.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Page 1 of 4March 2023 Page 1 of 4
NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Funding level for this acquisition: >SAT and < $750K > $750K and < $15M
Contracting Activity: 90th Contracting Squadron
Purchase Request / Local ID Number: F1Y3DA4134AW01
Program / Project (and PE, if applicable): GHLN23-8501 Replace Damaged-Used CATM Range Plates FAC 1591
Program Type (PEO or Other Contracting): Unfunded Requirement
Authority: AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
AFFARS 5313.501 - 10 U.S.C. 3403, Special Emergency Procurement Authority (41 U.S.C. 1903)
Estimated Contract Cost (including options): $654,874.00 Justification Type: Class Individual
COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure
** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
Date
13 May 2024
Project Mgr / 90 CES Chris Carter
CENMP 307-773-2402
Signature
X
Date
24 Jul 2024
Contracting Officer Liezel C. McIntyre
PKAB 307-773-3411
Signature
X
APPROVAL (AFFARS 5306.304(a) )
Date Signature
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Page 2 of 4March 2023 Page 2 of 4
I. Contracting Activity.
The contracting organization responsible for this action is the 90th Contracting Squadron, FE Warren AFB, Cheyenne, Wyoming.
II. Nature and/or description of the action being processed.
This procurement is proposed to provide Action Target for service supervision and execution of the Action Target Tactical Containment Trap (TCT) Upgrade for the CATM Firing Range, FE Warren AFB, Cheyenne, Wyoming. The proposed contractual action is to provide repair and/or upgrade, and extend the life of the aforementioned small arms range. Action Target will be responsible for providing the necessary upgrades to the CATM small arms range and ensure they meet all construction criteria outlined in the Engineering Technical Letter 11-18, Small Arms Range Design and Construction and commercial standards.
III. Description of supplies/services required to meet agency needs.
The purpose of this contract is to replace TCT3 plates, TCT4 heavy duty mouth bottoms, and TCT4 heavy duty mouth tops. Additionally, this repair/upgrade will enable the continued operation of the small arms range that supports DoD and COCOM weapons training requirements. The contractor, Action Target will be responsible for providing twenty-five 178" TCT3 smooth plates, twenty TCT4 Heavy duty mouth bottoms, twenty TCT4 heavy duty mouth tops and all associated hardware.
IV. Statutory authority permitting other than full and open competition.
The statutory authority utilized is FAR 13.106-1(b)(2) which states that for purchases exceeding the simplified acquisition threshold, requirements under FAR 13.501(a) apply to sole-source (including brand name) acquisitions of commercial products and commercial services. Procedures in FAR 13.5 were used in accordance with 41 U.S.C. 1901.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
Action Target is the only qualified contractor that can install the trap plates as they are proprietary to Action Target. The total containment plates and heavy duty mouths on all of the TCT-4 bullet traps are manufactured by Action Target. IAW Title 10 U.S. Code § 3204 (a)(1): “(1)the property or services needed by the agency are available from only one responsible source or only from a limited number of responsible sources and no other type of property or services will satisfy the needs of the agency;”. CATM Trap plates are highly specialized to the TCT-4 system installed at the aforementioned AF small arms range. Moreover, current components of the system that were installed March 2023 were still under warranty and if any repairs were to be performed by a company other than Action Target, this will void warranty of these materials.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
Based on the proprietary equipment necessary for the repair/upgrade and specificity for use on TCT-4 bullet traps, the Government cannot award to any other contractor. Action Target is the only contractor capable of performing repair, upgrade or maintenance for this system. Analysis for future procurement of a nonproprietary shooting training environment, is being considered by the Government. A more comprehensive review of past contracts, viability of replacement, material costs, mission requirements and customer needs shall be evaluated when system warranty lapses.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Page 3 of 4March 2023 Page 3 of 4
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
Action Target has completed a site survey for the aforementioned CATM range at no cost to the Government and has included all parts, installation and associated charges in their estimate. Prior contracts for similar materials were reviewed; IGE utilized RSMeans to incorporate local-specific labor rates; and installations costs from other training bases were compared. These factors, coupled with consumer indices, were considered by the Contracting Officer to determine fair pricing and reasonableness.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
As previously mentioned in the market research, Action Target is the only contractor authorized to install the smooth plates and heavy duty mouths on TCT-4 bullet traps manufactured under the same namesake.
Prior contracts issued for repairs/replacements and concurrent independent government estimate via RS Means to consider labor rates for incidental installation were used as basis for comparison. A more conclusive determination for fair and reasonable pricing includes other bases' installations costs for similarly positioned equipment/materials of the TCT system, coupled with consumer indices.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
Action Target is the only contractor capable of maintaining proprietary design of the TCT system.
X. List of any sources that expressed, in writing, an interest in the acquisition.
None.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
There are no steps to be taken by the Government to foster competition because repair and maintenance are proprietary to the system. Action Target did not identify authorized part distributor/service companies as they own the sole proprietorship. Action Target's estimate was $553,023.75 from July 2023, resulting in a savings to the government of $101,850.25 from the government IGE of $654,874.00. Analysis for future materials replacement of a nonproprietary shooting training environment comparable to the TCT system, is being considered by the Government. A more comprehensive review of past contracts, viability of replacement, material costs, mission requirements and customer needs may be necessary when materials warranty lapses.
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my signature above, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 Page 4 of 4
Remove the Guidance pages below.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items March 2023 Page of International Agreement Competitive Restrictions (IACR) March 2023 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document?
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Funding level for this acquisition:
Authority:
Justification Type:
COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.
(See "Specific Guidance for Completing this Template" below.)
I. Contracting Activity.
II. Nature and/or description of the action being processed.
III. Description of supplies/services required to meet agency needs.
IV. Statutory authority permitting other than full and open competition.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
X. List of any sources that expressed, in writing, an interest in the acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
XII. Certification by the Contracting Officer.
XIII. Certification by the technical/requirements personnel.
Specific Guidance for Completing this Template
I. Contracting Activity. (FAR 6.303-2(b)(1))
Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.
II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))
State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).
An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.
III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))
Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.
If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.
In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.
For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.
IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5)) Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204) VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.
Do You Need to "REDACT" Text?
This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.
9.0.0.2.20120627.2.874785
| security_markings: |
| CurrentPage: |
| PageCount: |
| new: |
| amended-with-original: |
| Yes: |
| No: |
| range_under-700K: |
| range_700K-13.5M: |
| Contracting-Activity: 90th Contracting Squadron |
| PR-ID-Number: F1Y3DA4134AW01 |
| Program-Project: GHLN23-8501 Replace Damaged-Used CATM Range Plates FAC 1591 |
| Program-Type: Unfunded Requirement |
| class: |
| individual: |
| Estimated_Cost: 654,874.00 |
| Sign_and_Save_1: |
| Date: 13 May 2024 |
| Date: 24 Jul 2024 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-CSO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| Section-I-Text: |
| Section-II-Text: |
| Section-III-Text: |
| Section-IV-Text: |
| Section-V-Text: |
| Section-VI-Text: |
| Section-VII-Text: |
| Section-VIII-Text: |
| Section-IX-Text: |
| Section-X-Text: |
| Section-XI-Text: |
| Section-XII-Text: |
| Section-XIII-Text: |
| Remove-Guidance-Pages: 1 |