This document is a Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction related to a federal contract opportunity for an Alignment Rack Upgrade at Beale AFB.
The key details are:
- The requirement is to upgrade the existing Hunter Alignment Rack system, as the current electronics components are obsolete and nonoperational. Specific items needed for the upgrade are listed.
- A brand-name justification is provided, as the upgrade requires Hunter-specific components and software that are not compatible with other manufacturers' systems.
- The contracting activity is the 9th Contracting Squadron (9 CONS). The estimated cost/price is not provided.
- The justification cites that a complete replacement system from another manufacturer would result in additional costs and require additional software/tools for compatibility.
- The contracting officer will determine a fair and reasonable price based on adequate price competition.
- The agency plans to conduct a cost analysis for the next upgrade to potentially replace the system and eliminate the need for a brand-name justification.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ Alignment Rack Upgrade.pdf | ||
| SON 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction
FOR OFFICIAL USE ONLY
March 2018 FOR OFFICIAL USE ONLY Page 1 of 3
Is this a brand-name justification? Yes No Please provide the product title and description. [ FAR16.505(a)(4)(i) ]
Brand-Name Product Title: Hunter Engineering Company
Brand-Name Product Description: Alignment Rack
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: 9th Contracting Squadron (9 CONS)
Purchase Request:
Program Name (and Program Element, if applicable):
Estimated Cost/Price of the Order (including options):
Type Program (see AFFARS 5302.101 for definitions): PEO Program Other Contracting
Type of D etermination: Individual Class Expires:
Click here for instructions to complete the boxes below.
(1) Contracting Activity:
9th Contracting Squadron
(2) Nature and/or description of the action being approved:
This is an individual Justification and Approval (J&A) for a brand-name commodity procurement of Hunter Alignment Rack equipment that is currently obsolete and nonoperational.
(3) Description of the supplies/services required to meet the agency's needs:
Qty Material Description 1 20-3394-1 HW2 Upgrade Kit 1 20-2785-1 CodeLink 2 with Wireless Pod and expansion cable 1 WA674-CM WinAlign Package including WA674 console w/ 27" Wide Screen LCD Display/HE421CM sensors 1 20-2621-1 Medium Duty Truck Spacer kit - contains 4 ea spacers for medium duty trucks 1 20-2882-1 Cordless Remote Indicator Kit - Includes recharging bracketry for 6/7/8 Series Cabinets 1 CERT COMBOLVL1 5-day class - streamlines the learning process by offering the Fundamental and Intermediate alignment courses.
(4) Justification for restricting consideration to a brand-name item:
The requirement is to upgrade our existing Hunter Alignment Rack to current standards. The electronics part of the current system are obsolete. The items listed on the quote are what is require to bring the system to the current standards to be compatible with the modern electronics in the current vehicles. The upgrade will allow us to use both of our alignment racks again. We have looked into purchasing a complete alignment rack system from a different company
March 2018 FOR OFFICIAL USE ONLY Page 2 of 3 and have found it is additional cost. It also would require additional software and tools to calibrate the steering inclination with the vehicles on board computer system. The upgrade uses special software that is built into the components. It allows the technician to complete the process with out needing additional computer and software.
(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:
A fair and reasonable price determination will be made by the Contracting Officer based on adequate price competition. Competitive offeror's prices will be evaluated to ensure a fair and reasonable price through the use of one or more of the price analysis techniques at FAR 15.404-1(b)(2). The Contracting Officer will verify that the awarded quote is within the scope of the contract. It has been determined that the contract vehicle will best ensure fair competition among interested parties as well as satisfy the Government's requirement for fair and reasonable pricing based upon adequate price competition.
(6) Other facts supporting the justification:
None
(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:
The agency will perform a cost analysis the next time an upgrade on the system is needed to see if it would be appropriate to replace the system, which would eliminate the need for a name brand justification.
(8) Program Manager's certification that supporting data is accurate and complete:
As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
(9) Contracting Officer's certification that the justification is accurate and complete:
As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.
(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:
As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.
REMOVING ROWS: CAUTION (click here first) NOTE: The text in the signature blocks below is editable, including the title.
Date 06 Aug 2024 Kyle Thacker, SSgt
Signature X
Date Signature X
Date Signature X
March 2018 FOR OFFICIAL USE ONLY Page 3 of 3
March 2018 Page of Is this a brand-name justification?
Please provide the product title and description. [ FAR16.505(a)(4)(i) ] Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Type Program (see AFFARS 5302.101 for definitions):
Fair Opportunity Exception: FAR 16.505(b)(2)(i), subparagraph Type of D etermination:
Click here for instructions to complete the boxes below.
(1) Contracting Activity:
(2) Nature and/or description of the action being approved:
(3) Description of the supplies/services required to meet the agency's needs:
(4) Justification for restricting consideration to a brand-name item:
(4) Identification of the exception to fair opportunity and the supporting rationale:
(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:
(6) Other facts supporting the justification:
(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:
(7) Actions the agency may take to remove or overcome any barriers to increasing fair opportunity before any subsequent acquisition for the supplies or services:
(8) Program Manager's certification that supporting data is accurate and complete:
As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
(9) Contracting Officer's certification that the justification is accurate and complete:
As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.
(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:
As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.
(10) Approving Official's determination that one of the circumstances in FAR 16.505(b)(2)(i) applies to the order.
As evidenced by my signature below, I hereby determine that the fair opportunity exception checked on page 1 applies.
NOTE: The text in the signature blocks below is editable, including the title.
9.0.0.2.20120627.2.874785
| security_markings: FOR OFFICIAL USE ONLY |
| CurrentPage: |
| PageCount: |
| Yes: |
| No: |
| Brand-Name-Title_hidden: Hunter Engineering Company |
| Brand-Name-Description_hidden: Alignment Rack |
| Contacting-Activity: 9th Contracting Squadron (9 CONS) |
| Purchase-Request: |
| Program-Name: |
| Cost-Price: |
| PEO-Program: 0 |
| Other-Contracting: 1 |
| subparagraph-A: 0 |
| subparagraph-B: 0 |
| subparagraph-C: 0 |
| subparagraph-D: 0 |
| subparagraph-E: 0 |
| Individual: |
| Class: |
| Expiration_Date: |
| A: |
| CAUTION: |
| Date: 10 Jan 2019 |
| Date: 04 Apr 2024 |
| Date: 24 Jul 2024 |
| Date: 06 Aug 2024 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-SCO-Coord: |
| Hide-Approval-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
File details come from the government source that posted it. Updated .