Brand Name JA_CAT-Rebuilds_20T0030_Redacted.pdf

PDF 175 KB Posted

Attached to
Pick Up, Rebuild, Test, and Paint Caterpillar Pump Engines and Generator Ends for Dredges CURRITUCK and MERRITT
Solicitation number
W912PM20T0030
Issued by

View the file

Other files

File Type Posted
A21 - W912PM20T0030_package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Control No: SAW-20-0029

SINGLE SOURCE JUSTIFICATION (Including Brand Name) (Simplified Acquisition Procedures under FAR Part 13 Not Exceeding $250K)

1. AGENCY / CONTRACTING ACTIVITY: USACE-CESAW

US Army Corps of Engineers Wilmington District Contracting Division 69 Darlington Avenue Wilmington, NC 28403

2. DESCRIPTION OF ACTION: Approval to award a brand name firm-fixed-price contract for the rebuild of three Caterpillar Pump Engines and two Caterpillar Generator Ends for the Dredges CURRITUCK and MERRITT. The contract will use FY20 Civil Works Operations and Maintenance appropriations. The purchase request numbers for this action is W81LJ800597499 and W81LJ800597500.

Nature: New Requirement Follow-on Requirement Mod to Existing Purchase Order/Contract Number

Pricing: Firm-Fixed Price Time & Materials Cost

3. DESCRIPTION OF SERVICES OR SUPPLIES: U.S. Army Corps of Engineers, Wilmington District has a need for the rebuilding of three (3) Caterpillar 3304 Pump Engines and two (2) Caterpillar SR4 Generator Ends for the Dredges Currituck & Merritt, and return to the USACE, Wilmington District, Engineer Repair Yard. The estimated value of this requirement is . Work to be completed by 60 days after award date.

a. Contractor shall furnish all labor, materials, supplies, equipment, and services

b. Services shall be performed by Caterpillar Trained/Certified Marine Diesel Power Technician(s), using new and/or remanufactured CATERPILLAR brand parts.

c. The units shall be blasted and painted with CATERPILLAR yellow paint.

d. Pick Up, Rebuild, Test, Paint, & Return to the Engineer Repair Yard, all of the items listed below:

Currituck CAT 3404 Pump Engine Merritt CAT 3404 Pump Engines Merritt CAT 3404 Pump Engines Merritt SR4 Generator End (port) Merritt SR4 Generator End (stbd)

REQUIREMENTS FOR NEW OR RE-MANUFACTURED CATERPILLAR BRAND PARTS

i. Cylinder head New/Remanufactured

ii. Cylinder kits New/Remanufactured

iii. Oil pump New/Remanufactured

iv. Fuel transfer pump New

v. Turbo cartridge New / Remanufactured

vi. Water temperature regulator New

vii. Oil Cooler New / Remanufactured

viii. Fuel injection nozzles New

ix. Main bearings and thrust bearing New

x. Crankshaft seals New

xi. Rod bearings New

xii. Spacer deck New

4. AUTHORITY CITED: FAR 13.106-1(b)(1)

FAR 13.106-1(b)(1)(i): For purchases not exceeding the simplified acquisition threshold (SAT), contracting officers may solicit from one source if the contracting officer determines that the circumstances of the contract action deem only one source reasonably available (e.g. urgency, exclusive licensing agreements, brand name, or industrial mobilization)

5. REASONS FOR AUTHORITY CITED:

The Dredges Currituck & Merritt work and travel the entire east coast of the United States to perform dredging operations. It is imperative to maintain the aforementioned engines and generator ends to the best of our capability to mitigate the risks associated with engine or generator end failure.

Mechanical failure of these engines or generator ends could cause extensive vessel and/or property damage, and/or injury, and/or loss of life.

Additionally, there would be extensive cost associated with availability/scheduling of a shipyard/dockside repair facility, and quick response services to repair or replace the failed unit.

Factory specification's and tolerances must be closely adhered to, so as to prevent failure(s). The requirement to use factory trained/certified Caterpillar Marine Power Systems Technicians and the use of New or New Remanufactured Caterpillar brand parts reduces the chance of failure(s).

6. EFFORTS TO OBTAIN COMPETITION: This action will be posted to Beta.SAM.gov and any quotes received that meet the requirement for brand name will be considered for contract award. This will ensure maximum competition between all companies able to provide brand name product.

7. ACTIONS TO INCREASE COMPETITION: There are multiple private sector/commercial sources available. The contracting office will continue to do market to ensure continuous competition for these services.

8. MARKET RESEARCH: Internet searches & previous contracts found the following small business

Vendors/Contractors (not an all-inclusive list) that can provide the labor, materials, supplies, equipment, and services to fulfill the contract requirements summarized in section 3 (above) of this document:

9. OTHER INFORMATION:

(a) Procurement History: Previous Purchase Order(s) or Contract(s): Yes No

If “YES”, for each purchase order or contract provide:

Contract number(s): W912PM-16-P-0087, W912PM-17-P-1155, W912PM18P0092

Was action competed? Yes No

10. TECHNICAL / REQUIREMENTS CERTIFICATION: I certify that the supporting data under my Cognizance, which is included in this abbreviated J&A is accurate and complete to the best of my knowledge and belief

Submitted By: M. Scott Aiken Position/Title: Engineering Technician (Civil) Email address: michael.s.aiken@usace.army.mil

Signature: __________________________________________

11. FAIR AND REASONABLE PRICE DETERMINATION AND CONTRACTING OFFICER CERTIFICATION:

As contracting officer, I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable (check appropriate box):

IAW 13.106-3 (a)(2)(i) - Market Research.

IAW 13.106-3 (a)(2)(ii) - Comparison of the proposed price with prices found reasonable on previous purchases.

IAW 13.106-3 (a)(2)(iii) - Current price lists, catalogs, or advertisements. However, inclusion of a price in a price list, catalog, or advertisement does not, in and of itself, establish fairness and reasonableness of the price.

IAW 13.106-3 (a)(2)(iv) - A comparison with similar items in a related industry.

IAW 13.106-3 (a)(2)(v) - The contracting officer’s personal knowledge of the item being purchased.

IAW 13.106-3 (a)(2)(vi) - Comparison to an independent Government estimate.

IAW 13.106-3 (a)(2)(vii) - Any other reasonable basis.

I hereby certify that this justification is accurate and complete to the best of my knowledge and belief.

Based on the foregoing, I approve this sole source justification subject to availability of funds, and provided that the services and supplies herein described have otherwise been authorized for acquisition.

Signature: __________________________________________

KARRI L. MARRES

PROCURING CONTRACTING OFFICER

AIKEN.MICHAEL.SCOT

T.1052737504

Digitally signed by

AIKEN.MICHAEL.SCOTT.1052737504

Date: 2020.05.01 15:35:59 -04'00'

MARES.KARRI.L.14589

89547

Digitally signed by

MARES.KARRI.L.1458989547

Date: 2020.05.07 22:02:21 -04'00'

File details come from the government source that posted it. Updated .