This document is a justification and approval for other than full and open competition to procure heating, ventilation, and air conditioning chillers from a specific manufacturer for the United States Army Garrison at Fort Hood, Texas. The Directorate of Public Works at Fort Hood expects to replace approximately 37 chillers in 28 planned projects over the next five years at an estimated total value of $7.8 million. The justification cites the Installation Management Command's category management decision to standardize on McQuay chillers from Daikin Applied based on an analysis that this approach will reduce costs through more efficient maintenance, training, and inventory management over the lifecycle of the chillers. Solicitations will be issued on a competitive basis to small businesses to install the chillers.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

Control No.: MICC 2020-81

Program: Fort Hood HVAC Chiller Standardization

Version – September 2018 CUI

JUSTIFICATION REVIEW DOCUMENT

FAR PART 6 JUSTIFICATION AND APPROVAL (J & A) FOR OTHER THAN

FULL AND OPEN COMPETITION

Program/Equipment: United States Army Garrison Fort Hood has a brand name requirement to procure Heating, Ventilation, & Air Conditioning (HVAC) chillers from a specific manufacturer (McQuay Chillers of Daikin Applied) to support new chiller purchases.

Authority: 10 U.S.C. 2304(c)(1) as implemented by FAR Part 6.302-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements

Amount: $

Prepared by:

Contracting Officer:

Technical:

Requirements:

Reviews: I have reviewed this justification and find it adequate to support other than full and open competition.

Program Manager:

DSN: 7

ADAM.

Date: 20

02 APR 2021

02 APR 2021

02 APR 2021

02 APR 2021

Program: Fort Hood HVAC Chiller Standardization

Version – September 2018 CUI

Small Business Specialist, Small Business Program:

Wendy Hercules DSN: 737-5352

Digitally signed by

JOUETT.WOLF.G.1256608401

for

Program: Fort Hood HVAC Chiller Standardization

Version – September 2018 CUI

FAR Part 6 Justification and Approval for Other than Full and Open Competition

1. Contracting Activity: U.S. Army Mission and Installation Contracting Command, (MICC) – Fort Hood, Shoemaker Center, 36000 Darnall Loop, Room 1300B, Fort Hood, Texas 76544-5095

Description of Action: This Class Justification and Approval (J&A) is requested to specify a make of Heating, Ventilation, and Air Conditioning (HVAC) chillers for lifecycle replacement for the United States Army Garrison (USAG) at Fort Hood, Texas. This action is taken in accordance with the Army’s Facility and Construction Category Management Policy and the designation of the Installation Management Command, (IMCOM) as a Category Lead. IMCOM has determined to standardize the use of McQuay Chillers of Daikin Applied throughout Fort Hood for both replacement of and incorporation into new HVAC installations. Authority to act under this Justification is for a five-year period for those projects identified in paragraph 3, starting on the date this Justification and Approval (J) is approved. The MICC-Fort Hood will solicit and award a number of Firm-Fixed-Price (FFP) contracts where the requirement is specifically for just a chiller replacement, or where chiller replacement is included as part of a larger construction project requirement. The Government will use FY21-26 Operations and Maintenance (O&M), Army funding for each contractual action. The government will not purchase the McQuay chillers directly, but will require the contractor to provide and install either as a chiller replacement action or as part of a larger construction requirement that requires, as a sub-task, the replacement of chillers.

3. Description of Supplies/Services: The mission of the USAG Fort Hood Directorate of Public Works (DPW) is to ensure that all facility support equipment is monitored, maintained, and replaced, to include HVAC systems and their chiller sub-components.

Fort Hood DPW expects to replace approximately 37 chillers in 28 planned projects over the next 5 years. This number is based on an analysis of the currently installed chillers’ installation date and manufacturer’s anticipated life expectancy. The table below identifies the known projects for the five-year period. In addition, it is possible that one or more chiller replacements will be needed due to unforeseeable chiller failures.

The total estimated value of this J&A is $7.8 million. This estimate is based on historical costs and the current five-year projected project cost. This Class J&A supports new HVAC chiller units to be incorporated into the construction contracts issued by MICC- Fort Hood covered for a five year period upon the approval of this J&A. Periods of performance will be specified in each individual contract.

Program: Fort Hood HVAC Chiller Standardization

Version – September 2018 CUI

Item # Project Estimated Value

1 Replace Chiller at DFAC Building 56425 2 Replace Chiller at Simulators Building 7051 - 2 Each 3 Replace Chiller at Building 37015 4 Replace Chiller at 56471 5 Replace Chiller Building 33007 6 Replace Chiller Building 7050 - 2 Each 7 Replace Chiller Building 12005 8 Replace Chiller Building 35014 9 Replace Chiller Building 6940 $

10 Replace Chiller Building 37002 $ 0 11 Replace Chiller Building 9112 11 Replace Chiller Building 26027 13 Replace Chiller Building 5664 14 Replace Chiller Building 4200 - 2 Each 15 Replace Chiller Building 5600 - 2 each 0 16 Replace Chiller Building 90051 17 Replace Chiller Building 410 - 2 Each 18 Replace Chiller Building 9575 $ 19 Replace Chiller Building 11050 20 Replace Chiller Building 56055 21 Replace Chiller Building 2804 - 2 Each $ 22 Replace Chiller Building 56057 23 Replace Chiller Building 22020 $ 0 24 Replace Chiller Building 18010 - 2 Each $ 25 Replace Chiller Building 56055 26 Replace Chiller Building 21022 - 3 Each 27 Replace Chiller Building 12005 $ 0 28 Replace Chiller Building 43016 $

Total Estimated Value: $

4. Authority Cited: 10 U.S.C. 2304(c), as implemented by FAR 6.302-1 -- Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Reason for Authority Cited: As described at FAR 6.302-1(a)(2), when the supplies or services required by the agency are available only from one responsible source, or for DoD, NASA and the Coast Guard, from only one or a limited number of responsible sources, and no other types of supplies or services will satisfy agency requirements, full and open competition need not be provided for. This J&A applies the Only One

Program: Fort Hood HVAC Chiller Standardization

Version – September 2018 CUI

Responsible Source authority using the application of FAR 6.302-1(b)(4), which indicates that use of FAR 6.302-1 is appropriate "When the agency head has determined in accordance with the agency's standardization program that only specified makes and models of technical equipment and parts will satisfy the agency's needs for additional units or replacement items, and only one source is available."

a. Background.

(1) On 16 April 2018, the Secretary of the Army issued a memorandum directing the implementation of Category Management to improve Army services contract processes and supporting data analytics to enable the Army to save time, money and manpower for higher priorities.

(2) On 8 April 2019, the Under Secretary of the Army issued a memorandum, Subject: Directive for Implementation of Category Management, establishing the implementation date of 30 September 2019 for specific categories, including category management for facilities and construction. The Commanding General for Army Materiel Command (AMC) and the Assistant Secretary of the Army for Installations, Environment, and Energy were identified as Co-managers of the Facilities and Construction categories.

(3) On 5 July 2019, U.S. Army Material Command, released Operation Order (OPORD) 19-190 providing guidance to AMC organizations on implementing category management. In this OPORD, AMC Facilities Category Co-manager responsibility was delegated to IMCOM.

(4) IMCOM, as a Category Lead, is responsible for establishing the priority of effort for contract spend within their assigned services based on those with the highest spend and greatest projected overall return on investment.

(5) In early fiscal year 2020, IMCOM initiated a pilot category management study at Fort Hood to determine if the establishment of a single manufacturer of a range of chiller sizes would result in efficiencies and dollar savings and thus meet the goals of category management. IMCOM completed this study and issued a Category Intelligence Report (CIR) for a HVAC Chiller Pilot that was approved on 14 August 2020 by both Facilities Category Co-Managers, Headquarters Department of the Army Assistant Deputy Chief of Staff G9, and IMCOM G4. In the CIR, analysis supported selecting a single manufacturer to procure HVAC Chiller systems from. By doing so, Fort Hood would realize measurable savings from efficiency during the sustainment of these chiller systems, by transitioning over time to a single manufacturer. The CIR identified McQuay Chillers of Daikin Applied as the manufacturer comprising the largest percentage of chillers on Fort Hood. On 11 September 2020, IMCOM G4 serving as the Army’s category lead for facilities, issued a memorandum mandating a selection of a single manufacturer of chiller systems for Fort Hood. This memorandum also directed the implementation of the CIR findings by identifying McQuay Chillers of Daikin Applied as the single manufacture of chiller systems for Fort Hood. By selecting this manufacturer as the single manufacturer to acquire chillers from for the next five years, Fort Hood expedites their means to realizing standardization of chillers and the cost savings and efficiencies realized during sustainment of these items.

b. Alternatives: The alternative to HVAC chiller standardization is to continue purchasing chillers based on Lowest Price Technically Acceptable criteria. This approach continues the present drawback of expending unnecessary financial resources and manpower due to the redundant costs and duplication of effort encountered by using multiple chiller manufacturers. Manufacturer supplied training is expensive, and training with more than one manufacturer is not cost feasible. Training and maintenance activities will continue to be inadequate, and new equipment integration increasingly burdensome with this strategy, until it ultimately becomes unsustainable.

c. Impact if this justification request is not approved. If this Class J&A is not approved, the Fort Hood chiller replacement contracts cannot be executed in accordance with the IMCOM’s Category Management decision. Failure to initiate this standardization effort will prevent IMCOM, and the Army, from realizing the efficiencies and reductions in costs that have been identified through category management efforts.

The Fort Hood DPW will continue to contend with significant duplication of manpower and financial costs due to the variety of existing chiller equipment across Fort Hood; the IMCOM CIR shows that limiting new chiller acquisitions to one manufacturer will substantially reduce these expenditures by reducing: training requirements; need for contract repairs that are beyond in-house capability; software engineering, documentation and procurement requirements; and lost mission man-hours due to equipment reliability issues and the resultant downtime. Failure to implement this Category Management initiative will result in forfeiture of the opportunity to use the DPW workforce more efficiently by increasing working knowledge of the chiller inventory while increasing HVAC system maintenance reliability, and enhancing DPW mission capability.

6. Efforts to Obtain Competition: It is contemplated that solicitations shall be issued to Small Business entities to install the selected brand on a competitive basis on individual FAR Part 14 Invitations for Bids and FAR Part 36 Construction Type contracts for the brand identified. The Contracting Officer shall publish the notices required by FAR 5.201 and any bids or proposals received shall be considered.

a. The cost and efficiency benefits to Fort Hood through standardization and interoperability by exclusively using McQuay Chiller of Daikin Applied, greatly outweigh the expected benefits of competing amongst different chiller manufacturers. Effective competition is not applicable at the manufacturer level, as this a sole source requirement. Competition will be achieved at the authorized distributor level.

b. Subcontracting Competition: Subcontracting the installations of the contemplated

Brand Name products will be achieved by utilizing Small Businesses during the solicitation phase of follow-requirements for the 28 projects listed in the table in paragraph 3.

7. Actions to Increase Competition: In accordance with FAR Part 5.2 Synopses of Proposed Contract Actions, a Sources Sought Notice (SSN) was issued under NAICS 333415, Commercial and Institutional Building Construction was posted on 14 October 2020, to include the brand name for McQuay Chillers of Daikin Applied.

a. As a result of SSN notice, ten (10) responses were received to include eight

(8) Small Business and two (2) Large Businesses. One of the Large Businesses was Mc-Quay-Daikin Applied. The cited brand name source noted that they had products available under Federal Supply Schedule (FSS), FAR Part 8.

b. The Directorate of Public Works (DPW) did provide a technical review of the Technical data provided by the Brand Name Source cited. The technical review team concluded the findings of the Technical Data provided by the Brand Name Contractor / Source were favorable to the Government and that the specifications met the contemplated requirements.

8. Market Research: This J&A is based on published research by IBIS World, and the IMCOM CIR. Both sources indicated there will be continued flexibility with different types of acquisition vehicles and that the current industrial base allows for competition and continued support of small businesses even with one manufacturer. Procurement IQ Procurement Report 28834333, “Chillers” published by IBIS World in December 2019, identifies the chiller price environment, supply chain, and vendors. The report states that the market for chillers has a shared negotiation power for buyers and suppliers, and also indicates that Fort Hood’s plan to switch out chillers at the end of their life cycle with a replacement of McQuay Chillers of Daikin Applied will have low switching costs. Buying a reported “top” brand chiller, such as McQuay Chillers of Daikin Applied, although more expensive, results in lower maintenance/sustainment costs over the life cycle of the chiller. In summary, limiting acquisition to McQuay chillers, although potentially more expensive to the Government initially, will result in an overall estimated 'life cycle" cost savings of up to $12 million over the five-year period of this J&A.

In addition to the aforementioned Procurement IQ Chiller report, IBIS World has also published the “HVAC System Construction & Maintenance” report, also referred to as the “HVAC Report.” This report, first published in October 2019 and updated in March 2020, states that there is a low level of market share concentration. Although the top HVAC manufacturers are diversified contracting businesses, the majority of vendors installing are small-scale (Small Businesses) contractors that provide services on a local level.

Research conducted in April 2020 by Fort Hood subject matter experts in the DPW and MICC-Fort Hood, indicated vendors’ training costs vary greatly. Some train only their own employees, which may render those vendors unable to compete. Fort Hood DPW states that most of the top chiller manufacturers train personnel off-site, usually in a city that would require employees of the Fort Hood DPW to travel to. McQuay Chillers of Daikin Applied is an exception and provides onsite training which greatly increases their marketability at Fort Hood.

The MICC-Fort Hood Construction Branch Chief researched Federal Supply Schedule providers under GSA Advantage and found two primary contracts that included 60 plus contractors. The Fort Hood local vendor demographics of HVAC service providers are:

69 Small Businesses 35 Other than Small Business 29 SBA Certified Disadvantages Small Business 23 Woman Owned Small Businesses 15 SBA Certified Section 8 (a) Small Business 12 Woman owned Small Business 6 Service Disabled Vet Owned Small Business 6 Woman Owned (EDWOSB) Small Businesses 4 Veteran Owned SB 1 SBA Certified HUB Zone Firms

FAR Part 8, Required Sources of Supply may be a viable option; however having to issue multiple Request for Quotes (RFQs) in GSA Administration’s E-buy Procurement System will prove difficult. This is due to the fact that without factoring in the installation, a storage location for any procurement will have associated costs.

9. Interested Sources: Sources that expressed interest in IMCOM’s market research were Carrier, and Trane who responded to Fort Hood’s request for training costs and were included as attachments to the CIR. Preliminary information provided by the three manufacturers consisted primarily of estimates of the cost of training Fort Hood personnel to maintain the respective manufacturer’s chillers. The results of the Sources Sought Notice determined multiple source exist that could supply McQuay Chillers.

10. Other Facts:

a. Procurement History. Prior to this standardization effort, there is no known history of sole source procurements of chillers at Fort Hood from McQuay Chillers of Daikin Applied.

b. Class J&A: This Class J&A will cover the procurement of future chillers up to $7.8 million for the next 5 years. Each solicitation will include the justification or documentation required by FAR 6.302-1(c), 13,106-1(b), or 13.501, and will be redacted as necessary. Contract files will be documented with a Contracting Officer scope determination and a copy of the approved J&A.

Program: Fort Hood HVAC Chiller Standardization

Version – September 2018 CUI

11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

___ Date: See electronic signature

Engineer

12. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

_____ __ ____ Date: see electronic signature

DPW O & M Division

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable. This determination will be made using cost analysis, price analysis, training should cost, construction contract repair IGCE, DPW HVAC maintenance technician expertise at Fort Hood, and consultation with MCFA contractor under an HQ IMCOM HVAC contract. As a part of this basis, certified cost or pricing data are not anticipated to be required due to the anticipated competition and low dollar amounts expected on each individual acquisition.

__ _______ __ Date: see electronic signature

Contracting Officer

14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

________ _ Date: see electronic signature

Contracting Officer

00'

C S.

.1239582717 5'00'

EXA 348071

.02 1 '

O signed by G 32 Date:

Date: See Digital Signature

Date: See Digital Signature

Date: See Digital Signature

Date: See Digital Signature

DPW O & M Division

Program: Fort Hood HVAC Chiller Standardization

Version – September 2018 CUI

Approval

Based on the foregoing justification, I hereby approve the procurement of McQuay Chillers of Daiken Applied for the United States Army Garrison Fort Hood on an other than full and open competition basis pursuant to the authority of Title 10 United States Code Section 2304(c)(1) -- Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. The estimated value of the contracts to be awarded under this class justification and approval is $7.8 million for a 5 year period of performance beginning upon approval of this request. The approval is subject to availability of funds, and provided that the services or supplies herein described have otherwise been authorized for acquisition.