This document is a Quality Assurance Project Plan (QAPP) Review Checklist dated January 2021, designed as a reference tool for contractors working on task orders. The checklist is based on EPA Requirements for QA Project Plans (QA/R-5) and is intended to guide the development and review of quality control measures for environmental data collection and technology programs. While no specific state, agency, or company is explicitly named, the document appears to be a standardized template for use in environmental monitoring and research projects.
The checklist provides a comprehensive framework for ensuring data integrity, covering elements such as project organization, sampling methods, analytical procedures, quality control, data management, and reporting. It requires contractors to submit a detailed quality assurance plan that meets EPA's QA/G-5 Guidance and complies with the American National Standard ANSI/ASQC E4-1994 for environmental data collection. The document outlines specific requirements for each project phase, including sampling design, equipment calibration, data validation, and management reporting, with checkboxes to verify compliance across multiple assessment categories.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
January 2021
QA PROJECT PLAN REVIEW CHECKLIST
Offeror is not to provide QAPP in its Solicitation Proposal submission. This Exhibit is being provided for reference only.
The following QAPP requirement is stated in “Scope of Work section 3.2“.
As part of requirements in any Task Order awarded, depending on Task Order Requirements, Contractor may be required to submit the quality control measures they will have in place to ensure integrity of the data, by way of a Quality Assurance Project Plan (QAPP). The Contractor may submit their own QAPP, provided that it meets the requirements of EPA’s QA/G-5 Guidance for Quality Assurance Project Plans (2002) or ADEQ’s QAPP Review checklist provided to the Contractor for use upon contract award (Exhibit A - Quality Assurance Project Plan (QAPP) Review Checklist). Contractor must also have an individual quality system that complies fully with the American National Standard ANSI/ASQC E4-1994, Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs.
This checklist is based on the elements in EPA Requirements for QA Project Plans (QA/R-5) (EPA, 2001a). This checklist can be used to either write or review a QA Project Plan, especially those involving field sampling and laboratory analyses.
Project Title Approved:
Preparer ☐ Yes Date Submitted for Review ☐ Yes with Edits
Reviewer ☐ No, please review comments and set up Start Date of Review a meeting to discuss.
End Date of Review
General Comments:
Notes:
IA = included and acceptable IU = unacceptable, need to be augmented M = missing information needs to be provided NA = not applicable
Element
IA IU M NA
A1. Title and Approval Sheet
Contains project title ☐ ☐ ☐ ☐
Indicates revision number, if applicable ☐ ☐ ☐ ☐
Indicates organization’s name ☐ ☐ ☐ ☐
Date signature of organization’s project manager ☐ ☐ ☐ ☐
Dated signature of organization’s QA manager present
Other signatures, as needed ☐ ☐ ☐ ☐
A2. Table of Contents
Lists QA Project Plan information sections ☐ ☐ ☐ ☐
Document version control and revisions page included ☐ ☐ ☐ ☐
A3. Distribution List
Includes all individuals who are to receive a copy of the QA Project Plan and identifies their organization
A4. Project/Task Organization
Identifies key individuals involved in all major aspects of the project, including contractors
Discusses their responsibilities ☐ ☐ ☐ ☐
Project QA Manager position indicates independence from unit generating data
Identifies individual responsible for maintaining the official, approved QA Project Plan
Organizational chart shows lines of authority and reporting responsibilities
A5. Problem Definition/Background
States decision(s) to be made, actions to be taken, or outcomes expected from the information to be obtained
Clearly explains the reason (site background or historical context) for initiating this project
Identifies regulatory information, applicable criteria, action limits, etc. necessary to the project
A6. Project/Task Description
Summarizes work to be performed, for example, measurements to be made, data files to be obtained, etc., that support the project=s goals
Provides work schedule indicating critical project points, e.g., start and completion dates for activities such as sampling, analysis, data or file reviews, and assessments
Details geographical locations to be studied, including maps where possible
Discusses resource and time constraints, if applicable
A7. Quality Objectives and Criteria
Author used and attached DQO template to define objectives and criteria
Identifies performance/measurement criteria for all information to be collected and acceptance criteria for information obtained from previous studies, including project action limits and laboratory detection limits and range of anticipated concentrations of each parameter of interest
Discusses precision ☐ ☐ ☐ ☐
Addresses bias ☐ ☐ ☐ ☐
Discusses representativeness ☐ ☐ ☐ ☐
Identifies the need for completeness ☐ ☐ ☐ ☐
Describes the need for comparability ☐ ☐ ☐ ☐
Discusses desired method sensitivity ☐ ☐ ☐ ☐
A8. Special Training/Certifications
Identifies any project personnel specialized training or certifications
Discusses how this training will be provided
Indicates personnel responsible for assuring these are satisfied
Identifies where this information is documented ☐ ☐ ☐ ☐
A.9 Documentation and Records
Identifies report format and summarizes all data report package information
Lists all other project documents, records, and electronic files that will be produced
Identifies where project information should be kept and for how long
Discusses back up plans for records stored electronically
States how individuals identified in A3 will receive the most current copy of the approved QA Project Plan, identifying the individual responsible for this
B1. Sampling Process Design (Experimental Design)
Describes and justifies design strategy, indicating size of the area, volume, or time period to be represented by a sample
Details the type and total number of sample types/matrix or test runs/trials expected and needed
Indicates where samples should be taken, how sites will be identified/located
Discusses what to do if sampling sites become inaccessible
Identifies project activity schedules such as each sampling event, times samples should be sent to the laboratory, etc.
Specifies what information is critical and what is for informational purposes only
Identifies sources of variability and how this variability should be reconciled with project information
B2. Sampling Methods
Identifies all sampling SOPs by number, date, and regulatory citation, indicating sampling options or modifications to be taken
Indicates how each sample/matrix type should be collected
If in situ monitoring, indicates how instruments should be deployed and operated to avoid contamination and ensure maintenance of proper data
If continuous monitoring, indicates averaging time and how instruments should store and maintain raw data, or data averages
Indicates how samples are to be homogenized, composited, split, or filtered, if needed
Indicates what sample containers and sample volumes should be used
Identifies whether samples should be preserved and indicates methods that should be followed
Indicates whether sampling equipment and samplers should be cleaned and/or decontaminated, identifying how this should be done and by-products disposed of
Identifies any equipment and support facilities needed
Addresses actions to be taken when problems occur, identifying individual(s) responsible for corrective action and how this should be documented
B3. Sample Handling and Custody
States maximum holding times allowed from sample collection to extraction and/or analysis for each sample type and, for in-situ or continuous monitoring, the maximum time before retrieval of information
Identifies how samples or information should be physically handled, transported, and then received and held in the laboratory or office (including temperature upon receipt)
Indicates how sample or information handling and custody information should be documented, such as in field notebooks and forms, identifying individual responsible
Discusses system for identifying samples, for example, numbering system, sample tags and labels, and attaches forms to the plan
Identifies chain-of-custody procedures and includes form to track custody
B4. Analytical Methods
Identifies all analytical SOPs (field, laboratory and/or office) that should be followed by number, date, and regulatory citation, indicating options or modifications to be taken, such as sub-sampling and extraction procedures
Identifies equipment or instrumentation needed ☐ ☐ ☐ ☐
Specifies any specific method performance criteria ☐ ☐ ☐ ☐
Identifies procedures to follow when failures ☐ ☐ ☐ ☐ occur, identifying individual responsible for corrective action and appropriate documentation
Identifies sample disposal procedures ☐ ☐ ☐ ☐
Specifies laboratory turnaround times needed ☐ ☐ ☐ ☐
Provides method validation information and SOPs for nonstandard methods
B5. Quality Control
For each type of sampling, analysis, or measurement technique, identifies QC activities which should be used, for example, blanks, spikes, duplicates, etc., and at what frequency
Details what should be done when control limits are exceeded, and how effectiveness of control actions will be determined and documented
Identifies procedures and formulas for calculating applicable QC statistics, for example, for precision, bias, outliers and missing data
B6. Instrument/Equipment Testing, Inspection, and Maintenance
Identifies field and laboratory equipment needing periodic maintenance, and the schedule for this
Identifies testing criteria ☐ ☐ ☐ ☐
Notes availability and location of spare parts ☐ ☐ ☐ ☐
Indicates procedures in place for inspecting equipment before usage
Identifies individual(s) responsible for testing, inspection and maintenance
Indicates how deficiencies found should be resolved, re-inspections performed, and effectiveness of corrective action determined and
B7. Instrument/Equipment Calibration and Frequency
Identifies equipment, tools, and instruments that should be calibrated and the frequency for this calibration
Describes how calibrations should be performed and documented, indicating test criteria and standards or certified equipment
Identifies how deficiencies should be resolved and
B8. Inspection/Acceptance for Supplies and Consumables
Identifies critical supplies and consumables for field and laboratory, noting supply source, acceptance criteria, and procedures for tracking, storing and retrieving these materials
Identifies the individual(s) responsible for this ☐ ☐ ☐ ☐
B9. Non-direct Measurements
Identifies data sources, for example, computer databases or literature files, or models that should be accessed and used
Describes the intended use of this information and the rationale for their selection, i.e., its relevance to project
Indicates the acceptance criteria for these data sources and/or models
Identifies key resources/support facilities needed ☐ ☐ ☐ ☐
Describes how limits to validity and operating conditions should be determined, for example, internal checks of the program and Beta testing
B10. Data Management
Describes data management scheme from field to final use and storage
Discusses standard record-keeping and tracking practices, and the document control system or cites other written documentation such as SOPs
Identifies data handling equipment/procedures that should be used to process, compile, analyze, and transmit data reliably and accurately
Identifies individual(s) responsible for this ☐ ☐ ☐ ☐
Describes the process for data archival and retrieval
Describes procedures to demonstrate acceptability of hardware and software configurations
Attaches checklists and forms that should be used ☐ ☐ ☐ ☐
C1. Assessments and Response Actions
Lists the number, frequency, and type of assessment activities that should be conducted, with the approximate dates
Identifies individual(s) responsible for conducting assessments, indicating their authority to issue stop work orders, and any other possible participants in the assessment process
Describes how and to whom assessment information should be reported
Identifies how corrective actions should be addressed and by whom, and how they should be verified and documented
C2. Reports to Management
Identifies what project QA status reports are needed and how frequently
Identifies who should write these reports and who should receive this information
D1. Data Review, Verification, and Validation
Describes criteria that should be used for accepting, rejecting, or qualifying project data
D2. Verification and Validation Methods
Describes process for data verification and validation, providing SOPs and indicating what data validation software should be used, if any
Identifies who is responsible for verifying and validating different components of the project data/information, for example, chain-of-custody forms, receipt logs, calibration information, etc.
Identifies issue resolution process, and method and individual responsible for conveying these results to data users
Attaches checklists, forms, and calculations ☐ ☐ ☐ ☐
D3. Reconciliation with User Requirements
Describes procedures to evaluate the uncertainty of the validated data
Describes how limitations on data use should be reported to the data users