REQUEST FOR QUOTE

SOLICITATION NUMBER: 69056720Q000012

SOLICITATION TYPE: SET ASIDE SMALL BUSINESS

PROJECT NAME: BLANKET PURCHASE AGREEMENT (BPA)

GEOTECHNICAL DRILLING SERVICES

QUOTE

SUBMITTAL DATE:

June 22, 2020

ISSUING OFFICE:

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

610 E 5TH ST

VANCOUVER, WA 98661

E-mail: WFL.purchasing@dot.gov

RFQ 69056720Q000012

Geotechnical Investigation BPA - Drilling

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

690567

Vancouver WA 98661

610 E FIFTH STREET

FHWA WESTERN FED LANDS DIVISION

Federal Highway Administration

CODE 16. ADMINISTERED BYCODE

X

238910

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED OR690567

RFPIFB

10. THIS ACQUISITION ISCODE

RFQ

14. METHOD OF SOLICITATION

13b. RATING

NAICS:

SMALL BUSINESS

05/21/2020

360-619-7683MONA NIMMO

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIME

06/22/2020 1400 PT

b. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

69056720Q000012

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 74OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

15. DELIVER TO

Vancouver WA 98661

610 E FIFTH STREET

FHWA WESTERN FED LANDS DIVISION

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$16.50

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS

THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

8(A)

Federal Highway Administration

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

DATED

ANGY LILJEDAHL

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

OFFER

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT:

REF.

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

X x

FHWA intends to issue up to six (6) five year BPAs to compete for Geotechnical Drilling in the Western Division including Alaska, Oregon, Washington, Idaho, Montana, Yellowstone National Park and Grand Teton National Park in Wyoming as needed.

Occasionally, work in other states and location may be requested.

Angy.Liljedahl Typewritten Text

DUNS _____________________________

Cage Code _________________________

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 2/2012) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

742 of

Contractor shall furnish supplies and/or services, if and when requested by the Contracting Officer or the authorized representative during the period specified in the "Effective Period." Purchases(Calls) made hereunder shall have a written Statement of Work (SOW).

Calls shall include a description of the job requirements, prices, delivery schedule and place of inspection and acceptance.

SECTION B: DESCRIPTION OF BLANKET PURCHASE AGREEMENT (BPA)

The Contractor must furnish supplies and/or services requested by the Contracting Officer during the period specified in the Call Statement of Work (SOW). Purchases (which may be referred to as Calls) made hereunder must have a written Statement of Work. The purchases must reference this agreement.

Such calls must include a description of the job requirements, prices, delivery schedule, place of inspection and acceptance. The effective date of this agreement is the date signed by the Contracting Officer and the Contractor.

Calls will include a detailed description of work. All items will be provided and ordered in accordance with the Calls attached Statement of Work and the most current Service Contract Act issued by the Department of Labor.

This agreement primarily covers the following geographical area: the states of Alaska, Oregon, Washington, Idaho, Montana; and Yellowstone National Park and Grand Teton National Park in Wyoming. Occasionally, work in other states and locations may be ordered. The Service Contract Act statute will be applicable. The actual work location will be designated within each Statement of Work attached to a Request for Quote (RFQ).

II. EXTENT OF OBLIGATION

The Government is obligated only to the extent of authorized calls made under this BPA.

III. PURCHASE LIMITATION

The shared ceiling limit for all the BPA ‘s awarded for this requirement is $18 Million for the 5 years of this agreement.

The dollar limitation for each individual call under this agreement is $7,000,000.00.

IV. INDIVIDUALS AUTHORIZED TO PURCHASE UNDER THE BPA

Orders may be placed by warranted contracting officers (contract specialists and purchasing agents) of the Federal Highway Administration – Western Federal Lands within their respective warrant authority and within the designated Order Limitation set forth in this BPA.

Individual Dollar Limitation Per Call

Elizabeth Firestone Angy Liljedahl Dean Umathum

$7 Million

Robert Kolln Michael Kendro Douglas Taylor

$5 Million

Mona Nimmo Sean Molina

$500,000

Kyle Wood Namrata Battan

$250,000

Authorized individuals will provide the SOW and the Itemized Bid Schedule for each job requirement.

There are no other authorized individuals that can place orders against this BPA.

V. DELIVERY TICKETS

Unless directed otherwise by the SOW, all soil samples, core samples, and all Daily Logs must be delivered to the address designated below no later than 10 calendar days following completion of the drilling project:

ATTN: Geotechnical Western Federal Lands Highway Division 610 East Fifth Street

RFQ 69056720Q000012

Vancouver, Washington 98661-3801 Service agreements made under this agreement must be accompanied by delivery tickets or sales slips that must contain the following minimum information:

1. Name of supplier

2. BPA number

3. Date of Purchase (call)

4. Purchase (call) Number

5. Itemized list of supplies/services furnished

6. Quantity, unit price, and extension of each item, less applicable discounts

7. Date of completion

All packing will be in accordance with standard commercial practices. Each package must be clearly marked with the BPA number and referenced call numbers. If there is to be shipping of any core samples the procedures and who to ship to will be listed in the SOW.

Delivery location and time will be identified in each Call. Any deviations must have the express consent of the Contracting Officer. All calls will be placed as FOB destination.

VI. INVOICES

The firm may request partial payment for each Call placed, provided that no successive request for partial payment is submitted within 28 days. An itemized invoice for each Call must be submitted with each payment request.

Instructions for submitting invoices can be found in SECTION C: CONTRACT ADMINISTRATION

DATA.

VII. DEFINITIONS

CALL: Award from a RFQ against the BPA CO: Contracting Officer COR: Contracting Officer’s Representative DIFFICULT ACCESS EQUIPMENT: Helicopters, cranes, barges and other specialty equipment designed for difficult access drilling conditions.

DRILL SITE: Consists of each borehole location, including access road(s), drill pad, staging area(s), and flagging area. Drill sites include all explorations described in the SOW of each call, including borings, test pits, Cone penetrometer tests (CPT), geoprobes, hand augers, and other exploration methods described in the SOW.

FHWA: Federal Highway Administration, Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, Washington FIELD INSPECTOR: Hole logger HEAVY EQUIPMENT: Excavators, bulldozers, backhoes, front end loaders, etc.

PROJECT: The specific section of the highway or other property on which drilling is to be performed as set forth in the SOW.

SOW: Statement or Scope of Work to be interchangeable

VIII. SCHEDULE OF DRILLING AND SAMPLING

The schedule for drilling and sampling, and estimated depth of each boring required will be provided within the SOW for a given RFQ.

IX. CONTRACTOR-FURNISHED PROPERTY & SERVICES

The Contractor will furnish equipment that meets state, local and federal environmental requirements.

Equipment must be free from petroleum leaks or other environmentally hazardous liquid. Failure to provide equipment that meets these requirements may result in termination of the BPA.

RFQ 69056720Q000012

1. DRILLING MACHINE

The drilling machine(s) and all associated equipment must be able to meet the performance standards and drilling requirements set forth in each SOW.

The Contractor must furnish a drilling machine consisting of a truck-mounted, track-mounted, or ATV-mounted drill, capable of triple tube wire-line core drilling, obtaining core, and standard penetration tests (SPT) and split-barrel sampling for the full depth specified in each SOW.

The Contractor may be required to furnish a portable drilling machine capable of being transported to drill locations by crane, helicopter, skidding, or hand packable. The portable drilling machine must be able to perform core drilling for the full depth specified in each SOW and must be capable of drilling using a casing advancer system with a large enough diameter that N-size core rods can be used to drill inside the casing. The portable drilling machine must also be capable of conducting SPT tests and obtaining split-barrel samples for the full depth specified in each SOW. Drill sites for portable drilling machines will be off the main roads, on slopes below or above the road, on new road alignments, and on pioneer roads.

The drilling machine must be furnished complete with all the materials, operating accessories, modifications, and attachments that may be necessary to fulfill the requirements of the SOW. This includes, but is not limited to:

Drill fluid pumps;

Hollow core auger flights with center rods, plug, and bits;

Core barrel and rods;

Diamond core bits;

Split-barrel samplers;

Hammers;

Water tanks;

Hoses; and Accessory pumps.

Inoperable equipment must be repaired or replaced within 48-hours at the Contractor's expense.

If artesian water conditions are encountered, the driller must be sufficiently prepared to continue drilling when the discharge rate and pressure is low. If high discharge rate and/or pressure artesian water conditions are encountered, the driller must be sufficiently prepared to plug and abandon the hole. The driller must not move the drill rig off a hole if they have encountered artesian conditions until the hole is plugged.

2. CORE DRILLING EQUIPMENT

H-sized triple tube wire-line core drilling equipment in general accordance with ISRM (International Society for Rock Mechanics) Commission on the Standardization of Laboratory and Field Tests (1978, 1981) must be used unless stated otherwise in the SOW or if a portable drill machine is required to access a boring location. Portable drill machines must be capable of wire-line core drilling N-size or H-size core.

Diamond bits, casing shoes and advancers, reaming shells, and pavement coring bits, must be supplied by the Contractor.

Provide equipment, such as core trays, additional split inner core barrels, or PVC half pipes, to display the rock core to the Field Inspector before the core is placed into the core box.

3. HOLLOW STEM AUGER DRILLING EQUIPMENT

Hollow stem augers in accordance with ASTM D 4700 must be used for soil sampling to required depths, installation of instrumentation, and to allow H-sized coring (or N-sized core if a portable drilling machine is required). Hollow stem augers must have a minimum inner diameter (I.D.) of 4.25 inches and maximum outside diameter (O.D.) of 9 inches. When the augers are being advanced, a center rod and plug with a drag bit must be used down the hollow center of the augers. All sampling rods, split spoon samplers, shoes, and auger tools must be supplied by the Contractor.

If heave or disturbance of the soil occurs due to hydrostatic pressures below groundwater level, the driller

RFQ 69056720Q000012

must flood the hollow center of the augers with water or approved drilling fluid to maintain an adequate head of water so that drilling may continue.

4. CASING ADVANCER EQUIPMENT

Casing advancer equipment consists of steel flush-joint casing with an outside diameter of at least 4 inches. The casing may be advanced by driving it into the ground, or behind a drilling bit. Before inserting samplers down the casing, it must be cleaned out to the sampling depth at the bottom of the casing. When using casing advancer below groundwater, a head of water above the groundwater level must be maintained inside the casing to prevent ground heave or disturbance.

5. TEST PIT EQUIPMENT

Test pit equipment may include excavators, backhoes, and other digging equipment when specified in the SOW. During excavation, the bottom of the pit must be kept relatively level so that each excavated lift represents a uniform soil horizon. Excavated material must be stockpiled adjacent to the excavation in separate stacks relative to excavation depth. An attempt must also be made to keep different soil and/or rock separate to better facilitate field identification.

Test pits must be backfilled with excavated soils unless otherwise specified in the SOW, and the backfilled materials must be compacted by tamping with the excavator bucket. More extensive compaction methods may be specified in the SOW.

6. SUBGRADE SAMPLING EQUIPMENT

Subgrade sampling equipment consists of a large diameter earth auger bit attached to solid stem auger.

The large diameter earth bit must have a minimum O.D. of 14-inches and the capability to drill 5-feet below ground surface. The bit must have a nearly flat bottom profile. The solid stem auger must have an O.D. of 8- to 10-inches and will be 5-feet long. Replacement auger teeth, sample bags, hand excavation equipment (rock hammer, shovel, post-hole digger, pavement patch) and tamper must be supplied by the Contractor.

7. MUD-ROTARY OR ROTARY-WASH DRILLING EQUIPMENT

Mud-rotary or rotary-wash drilling equipment consists of a combination of an inner drilling rod and bit advanced without casing while recirculating bentonite or polymer drilling fluids to carry out cuttings and stabilize the hole from caving and heave. Sampling is similar to hollow-stem auger methods. Jetting of the fluid downward is not allowed. Mud-rotary may be used when specified in the SOW.

8. CONE PENTROMETER TESTING EQUIPMENT

In-situ testing using a cone penetrometer consists of pushing a cylindrical steel probe into the ground at a constant rate and measuring the resistance to penetration. The penetrometer probe can consist of either a 35.7-mm diameter probe body with a 10-cm2 projected area and a 150-cm2 friction sleeve, or a 43.7-mm diameter probe body with a 15-cm2 projected area with a 200-cm2 friction sleeve, as specified in the SOW. Cone penetrometer testing must be performed in accordance with ASTM D 5778.

Use a CPT rig capable of recording cone tip resistance, sleeve friction resistance, pore water pressure, shear wave velocity, and temperature. Provide data in electronic format and graphical interpretive format using correlations specified in the SOW.

9. OTHER DRILLING EQUIPMENT

Other drilling equipment may include solid stem augers, hand augers, bucket auger, sonic drilling, air rotary drilling, direct push probe (aka geoprobe), alternate coring bits, split-barrel sampler rings sleeves and other methods when specified in the SOW. Details of drilling equipment and methods can be found in publication No. FHWA NHI-01-031 Subsurface Investigation – Geotechnical Site Characterization.

10. SPARK ARRESTERS

RFQ 69056720Q000012

All stationary and mobile diesel and gasoline engines, except exhaust turbo-charged engines, used in the Contractor's operations must be equipped with spark arresters.

X. PERSONNEL REQUIREMENTS

The Contractor must furnish a drill crew consisting of at least one journeyman-level drill operator and one experienced drill helper. Additional qualifications may be included in the SOW. In addition, the SOW may indicate the need for flaggers. The Contracting Officer (CO) will have the authority to require the replacement of any Contractor personnel not exhibiting adequate capability or reasonable safety and responsibility in their job performance.

Personnel removed due to Government determination of unsuitability must be replaced within 2 days. If the Contractor replaces personnel during the performance of a SOW, there will be no expense to the Government.

The Contractor is responsible under this agreement for the control, management, and supervision of the day-to-day activities and performance of their employees while performing the services required by the agreement. Services to be delivered under this agreement by the Contractor to the Government are non-personal as defined by FAR Part 37.

1. JOURNEYMAN-LEVEL DRILL OPERATOR

The Drill Operator is responsible for the safe and efficient transportation, operation, and maintenance of equipment utilized in drilling, sampling, and testing of bore holes. The Drill Operator supervises the building of access roads, crane or boom truck operations, or other operation as needed to gain access to sites. The Drill Operator must have a minimum of 3 years of experience in the operation of drill equipment in the geotechnical field. Drill Operators must possess a valid State driller’s license in the state(s) in which the work is to be performed under the specific SOW, if required by that State’s governing body. The Contractor must have current driver's licenses that permit the transport of drill operation equipment. Such licenses must comply with all applicable Federal and State codes and regulations. The Drill Operator's driving record must indicate the safe and responsible use of drilling operation vehicles.

The Drill Operator must be capable of performing standard geotechnical tests such as the standard penetration test and thin wall undisturbed sampling (i.e. Shelby). In addition, the Drill Operator must be proficient in the use of split-barrel samplers and similar tests. The Drill Operator must understand the use of, and be able to install, inclinometer casing, piezometer instruments, and standpipe piezometers as directed. The Drill Operator must be able to locate borings on the ground from plans or other diagrams and read and understand survey stakes. The Drill Operator must be capable of following oral and/or written instructions of a general nature. Drill Operator must be physically fit and capable of lifting and carrying heavy pieces of drill equipment in adverse or inclement conditions such as mud, snow, ice, or irregular terrain.

2. DRILL HELPER

The Drill Helper must work under the direct supervision of the Drill Operator. The Helper will be required to assist the Drill Operator with heavy lifting of drill equipment in possibly adverse conditions, such as mud, snow, ice, or uneven ground. The helper must have a minimum of six (6) months experience working with heavy equipment, and must be familiar with the operation of water pumps.

The Drill Helper must have a good overall mechanical aptitude and possess good manual dexterity. Drill Helpers must possess a valid State driller’s license in the state(s) in which the work is to be performed under the specific SOW, if required by that State’s governing body. The Drill Helper must have current driver's licenses that permit the transport of drill operation equipment. Such licenses must comply with all applicable Federal and State codes and regulations. The Drill Helper's driving record must indicate the safe and responsible use of drilling operation vehicles.

3. FLAGGING PERSONNEL

Flagging personnel must perform in accordance with The Manual on Uniform Traffic Control Devices, RFQ 69056720Q000012

Part VI, Section F - Control of Traffic Through Work Areas. Flagging personnel must have current certifications (flagging cards) from the American Traffic Safety Services Association or a State agency.

4. FIELD INSPECTOR

When required in the SOW, the Contractor must provide an experienced (minimum 4 years unless stated otherwise in the SOW) geotechnical engineer or geologist to act as the Field Inspector to log all drill holes when required in the SOW. All drill logs must be completed in accordance with the Federal Lands Highway Soil Description and Identification Guidelines and the Federal Lands Highway Rock Characterization Guidelines. Digital pictures must be taken of each core run before it is placed in the core box (meaning while it is inside a core tray, split inner core barrel, or PVC half pipe as explained in Section C2). Take an additional digital pictures of each full core box while it is on the project. Also provide a digital picture of each split-barrel sample while it is in the sampler. Include a ruler or scale in all core and split-barrel sample pictures. Identify the depth, sample or run number, and boring number for each digital picture.

Production of gINT logs (gINT template and library to be supplied by the government) will be required and based on field logs. The draft and final gINT logs will be e-mailed to the contact listed as the COR in the SOW. Logs will be reviewed by the Government and sent back for revisions. This process may require multiple revisions. The Contractor must supply core boxes and wood separator blocks, and tape to seal the boxes, the field inspector will supply a digital camera, heavy duty zipper type sealable plastic bags or other approved air tight containers, tape measures, writing utensils and grease or wax pencils for marking core, hammers, knives, and any other equipment required for penetration sample containment and test hole logging.

The Field Inspector may be required to make a site visit prior to the start of drilling.

XI. PERFORMANCE REQUIREMENTS

1. GENERAL

The Contractor must perform the drilling at the locations set forth in the SOW. WFLHD will stake or flag each drill site. Actual depth of individual holes may vary from the amount set forth in the SOW as allowed under Section P. The Contractor will be paid for the actual number of holes drilled and the actual depths drilled.

If a Contractor has been documented by WFLHD as unable to complete specific work requirements for previous WFLHD SOWs, they may be disqualified from bidding on future projects with similar work requirements. These work requirements may include but are not limited to drilling or sampling in certain subsurface materials or conditions, the installation of instruments, performing in situ testing, inability to provide equipment that is in good working order, or providing qualified personnel.

The Contractor must comply with all state drilling regulations including but not limited to: possessing required licenses, submitting completed boring logs to the State, and abandoning test holes in compliance with state and all local regulations and procedures.

2. DRILL WORK

a. SOIL SAMPLING

The Contractor must conduct standard penetration sampling in accordance with standard methods specified by the American Society for Testing and Materials (ASTM) in ASTM D 1586-84, Standard Test Method for Penetration Test and Split-Barrel Sampling of Soils.

Standard penetration tests (SPT) and split-barrel sampling must be conducted in soil, as determined by the SOW. The Contractor must open the split-barrelsampler after SPT each test, and provide the open sampler with sample contained within to the Field Inspector.

Borings must be advanced using hollow stem augers with a center plug or bit. Subsurface materials at the drill site may preclude SPT sampling in some parts of one or more holes. If material is encountered that is too large for hollow stem augers to advance, the H-size core barrel must be inserted, and advancement of

RFQ 69056720Q000012

the hole must be continued with SPT tests taken as directed by the Field Inspector.

Drive samples will be performed using the standard 2-inch outside diameter split-barrel sampler unless otherwise directed by the drill inspector or COR. The Contractor must also furnish a 2.5-inch O.D. and a 3-inch O.D. split-barrel sampler. Soil catchers must be furnished and used in SPT and all other drive samplers unless directed by the COR or drill inspector.

If SPT refusal occurs prior to obtaining the specified depth, the borehole must be advanced another 1½-feet and the SPT repeated. If SPT refusal occurs again, the Field Inspector may direct the Driller to change to core drilling or to continue auguring to the required depths.

SPT refusal is defined by AASHTO T 206 and ASTM D 1586, as when the number of blows exceeds 50 for any 6-inch increment, when the total number of blows equals 100, or if the sampler has not advanced as a result of the last 10 consecutive blows.

When coring or augering in rock and subsurface material is characterized as highly weathered, very weak to weak rock, take SPT samples every 5 feet at a minimum to gauge relative density of the very weak to weak rock material.

Thin-walled (Shelby) tube sampling must be in accordance with ASTM D 1587-83, Standard Practice for Thin-Walled Tube Sampling of Soils. The outside diameter of the thin-walled tubes will be 3 inches and the length of the thin-walled tubes will be 3 feet unless otherwise specified in the SOW.

If specified in the SOW, the Contractor must also furnish a pitcher barrel sampler and have it available for use during thin-walled (Shelby) tube sampling.

If volatile or poisonous gas is encountered, the boring must be terminated and the COR must be notified immediately.

b. CORE DRILLING AND SAMPLING

If auger and/or SPT refusal occurs, as determined by the Field Inspector, the Contractor will begin core drilling. Coring may be performed in all fresh, broken, and/or weathered rock, providing continuous core samples of the materials being investigated. Pavement cores must be drilled through the entire thickness of pavement present in the roadway, up to a maximum of 12- inches. Core samples must be recovered in as intact a state as possible at the locations and to the depths prescribed in the SOW. Core samples must be emptied from the core barrel into a core tray, PVC half pipe, or other suitable container that minimizes disturbance to the sample for examination. The pavement core must be boxed by the Contractor after the Field Inspector's examination. All recovered core and other drilled materials must be delivered to the designated office per the schedule established in the SOW.

c. SUBGRADE SAMPLING

The COR will determine the frequency of subgrade sampling and/or select specific sampling locations in the SOW. Sampling must begin by carefully augering through the pavement, if present, without disturbing the underlying base course, and hand excavating the pavement material to the top of the base coarse. If pavement cores are also required, drill the pavement core in a separate location within 5 feet of the marked subgrade boring location. Prevent all drill fluids from pavement coring operations from entering the subgrade boring. Loosen base course with auger without mixing with underlying materials.

Hand excavate and place all base course into sample bag(s) or other approved container. Hand clean base of hole so as not to mix base course with underlying material. Carefully loosen underlying material with auger so as not to mix individual, distinct layers. Sample each distinct strata encountered as determined by the COR or Field Inspector to auger refusal or to a minimum depth of 5-feet. Obtain 100-pound samples in sand, silt and clay. Obtain 150-pound samples in predominantly gravel or cobble materials.

Sample weight must not exceed 75-pounds per bag or other approved container. The Contractor must permit the COR to log the completed hole prior to backfilling. Backfill the hole with material suitable for compaction. Compact each 1-foot of loosely placed fill with a tamper. Replace base course with gravel and/or sand. Replace pavement to original depth with compacted pavement patch.

d. GROUNDWATER LEVEL SAMPLING

RFQ 69056720Q000012

Provide a water bailer or pump and an electronic water level meter capable of measure the depth to groundwater to 1/100 of a foot, unless stated otherwise in the SOW. Pump drill water from the boring when necessary and measure groundwater levels as directed by the COR or Field Inspector.

e. OTHER SAMPLING

Other sampling methods, such as Osterberg sampling, pitcher barrel sampling, direct push, sonic sampling, grab sampling, or other sampling may be specified in the SOW.

Additional groundwater sampling equipment, such as peristaltic pumps, submersible pumps, disposable sampling bailers, and other equipment may be specified in the SOW. Details of subsurface sampling and methods can be found in publication No. FHWA NHI- 01-031 Subsurface Investigation – Geotechnical Site Characterization.

3. INSTALLATIONS

a. SLOTTED AND SOLID PIEZOMETER

When required in the SOW, the Contractor must install a PVC standpipe piezometer to the depth as directed by the COR or field inspector. One centering device must be attached for each 20-25 feet of PVC pipe to insure adequate annular spacing throughout the length of the standpipe piezometer. A slotted PVC screen must be installed within the water-bearing strata as specified in the SOW. Backfill around the screen must consist of number 8, uniform graded silica sand. A bentonite seal must be installed above the screen to the top of the hole. A cap of common materials must be placed over the seal. A plastic cap must be installed on top of the PVC pipe. A permanent, locking cover must be cemented in place surrounding and protecting the top of the PVC pipe. All pipe, screens, bentonite, sand, and other materials necessary for installation must be furnished by the Contractor.

b. INCLINOMETERS

When required in the SOW, the Contractor must install flush coupled, ABS plastic inclinometer casing.

For installations of less than 100-feet, quick connect inclinometer casing may be used. For installations of 100-feet or greater, quick connect couplings may not be used. On 100-foot and deeper installations all casing joints must be connected using a PVC cement as specified by the manufacturer, and two "pop" rivets per joint.

Each joint must be covered by "duct" tape to preclude entrance of grout. The inclinometer casing must be inserted inside the drill casing. The inclinometer casing must contain four internal grooves at 90-degree intervals which must be oriented in the bore-hole at the direction of the COR or Field Inspector. The hole must be filled with grout before any drill rods are extracted. Grout must be pumped continuously until the annular space is completely filled and excess grout is flowing from the hole at the ground surface. Grout must consist of a prepackaged Portland cement that meets the requirements of ASTM C 150-94, mixed with powdered bentonite. One cup of soda ash must be added to each grout batch of 100-gallons or less.

Mix soda ash with water first then add the cement. Then mix in the bentonite. Adjust the amount of bentonite to produce a grout with the consistency of heavy cream.

Based on the results of drilling, use one of the following grout mixes:

RFQ 69056720Q000012

If the borehole has water in it, the buoyancy of the inclinometer casing must be overcome by adding water (or environmentally safe anti-freeze in cold regions) inside the inclinometer casing or by other means. Do not hold the inclinometer casing in place from the top.

c. VIBRATING WIRE PIEZOMETER INSTALLATION

When required in the SOW, grout the Vibrating Wire Piezometers (VWPs) into the boreholes following the manufacturers recommendations. Install VWPs at the depth as directed by the COR or Field Inspector.

Note the vibrating wire piezometer serial number on the boring logs and depth of installation below ground surface to the nearest 0.1-foot. Submit the VWP calibration certificate to the COR at least 5 days prior to mobilization to the site.

d. SONDEX

When required in the SOW, the Contractor must furnish a 3 inch Sondex pipe (corrugated plastic pipe used for drains), Sondex pipe couplings, Sondex sensing rings, strong cable ties (16 inches or longer) or wire, mastic tape, and vinyl tape. The Sondex couplings are used to join lengths of Sondex pipe. The cable ties or wire are used to secure the Sondex pipe to the bottom of the casing and to hold the Sondex couplings onto the Sondex pipe. The mastic tape and vinyl tape are used to seal the bottom and each coupling so that grout cannot enter in the void between the Sondex pipe and the inclinometer casing.

Cut an 8-foot section of Sondex pipe to be attached to the bottom section of inclinometer casing. Cut the remaining Sondex pipe into 10-foot sections.

Attach sensing rings to the Sondex pipe at 3-foot intervals or as directed in the SOW.

Protect the rings from corrosion with mastic and tape.

Prepare the bottom section of casing as usual, and secure the bottom 12 to 18- inches of Sondex pipe to the bottom of the casing. This can be difficult since (1) the Sondex pipe is quite strong and larger in diameter than the casing, and (2) the bottom of the Sondex pipe must be sealed against entry of grout. Seal the bottom of the Sondex pipe using mastic and tape. Slit the bottom of the Sondex pipe to flatten it against the inclinometer casing, secure it to the casing with cable ties or wire, and then carefully waterproof it.

Lower the first section into the borehole so the next section can be connected. If the borehole has water in it, the buoyancy of the Sondex pipe must be overcome by adding water (or environmentally safe anti-freeze in cold regions) inside the Sondex pipe or by other means. Do not hold the Sondex pipe in place from the top.

Slide a 10-foot length of Sondex pipe over a 10-foot length of casing. Join the casing, then joint the Sondex pipe. Fit the Sondex coupling onto the butted ends of Sondex pipe.

RFQ 69056720Q000012

Secure with cable ties and then waterproof the entire coupling.

Lower the pipe into the borehole so the next section can be connected. Join the casing, and then join the Sondex pipe. Continue until the casing has reached the specified depth.

Protect the top of the casing and Sondex pipe from grout spills.

Backfill the borehole with grout. Use the grout mix specified in the SOW.

e. OTHER INSTALLATIONS

Other installations, such as thermistors, trolls, spectral acceleration arrays (SAA), time- domain reflectometer (TDR), strain gauges, load cells, thermometers, barometers, rain gauges, cameras, or other installations and instrumentation may be specified in the SOW. Instrumentation installations may also include above and/or below ground wiring and remote communication equipment installation, including cell phone and satellite phone communication systems with battery and/or photovoltaic power sources.

4. TESTING

Downhole testing such as vane shear testing, pressure meter testing, dilatometer testing, dynamic cone penetrometer, downhole boring optical and acoustic imaging, downhole and crosshole seismic testing, temperature, multigas meter, and other methods may be specified in the SOW.

Above ground testing such as Falling Weight Deflectometer (FWD) testing, plate load testing, and other methods may be specified in the SOW.

Geophysical testing such as seismic refraction and/or reflection, refraction microtremor (ReMi) testing, multichannel analysis of surface waves (MASW) testing, resistivity, ground penetrating radar (GPR), and other methods may be specified in the SOW.

Groundwater and infiltration testing such as drawdown tests, slug tests, pumping tests, double-ring infiltrometer tests, single-ring infiltrometer tests, EPA falling head tests, constant head tests, and other tests may be specified in the SOW.

XII. FIELD INSPECTION

Field Inspector duties include but are not limited the following:

The borings must be drilled as close to the marked locations as possible. Moving the hole will be allowed only to avoid obstructions such as overhead utilities or guardrail. If it appears the hole will need to be moved, contact and obtain approval from the COR prior to drilling the hole.

When drilling through pavement, take an accurate measurement of the pavement thickness to the nearest 0.1- inch. Measure the roadway base thickness or estimated base thickness to the nearest ½ inch.

Complete a field log for all investigation locations in accordance with the Federal Lands Highway Soil Description and Identification Guidelines and the Federal Lands Highway Rock Characterization Guidelines.

Take photos of each core box on site. Place core in the box like reading a book, starting at the top and working from left to right and then down. Label the beginning and end of each core run.

Using a permanent marker, draw a line across all mechanical fractures.

Label all samples with at least the project name, boring number, depth, date, and sample number.

Record the recovery of each split spoon sample to the nearest inch. Take a photo of each boring location.

The boring Stationing is listed in the SOW. Measure the offset from the existing centerline of the actual drilled location and note it on the logs. Take a GPS reading at each boring location and record the latitude and longitude on the log.

Take water level reading during drilling, after completion, and after withdrawal of the drill rods.

When coring and the material is highly weathered, take SPT samples to get information on the weathered rock strength.

The Field Inspector will submit a daily report with the quantities delivered that day to match the

RFQ 69056720Q000012

quote sheet items. The Field Inspector and the driller will both sign the completed form. Field Inspectors report format is provided by the Government.

The Field Inspector may be required to set up single channel dataloggers for use with vibrating wire piezometers. Connect the wiring from the vibrating wire piezometers to the dataloggers at the drill site in accordance with the manufacturers recommendations. The dataloggers currently in use by WFLHD are produced by Durham Geo Slope Indicator (DGSI). The Field Inspector will use the associated software to input calibration factors and set the reading schedule. The software is a free download from DGSI’s website.

The Field Inspector may be required to wire and program o t h e r dataloggers a s s p e c i f i e d i n t h e S O W for use with thermistor strings, vibrating wire piezometers, in-place-inclinometers and various other geotechnical instruments. The Field Inspector must be familiar with the use of dataloggers and use industry standard practices and procedures as well as following guidelines given in the owner’s manual for each device.

XIII. DRILL CONTRACTOR

The Contractor must monitor the drill runs and depths, SPT and drive sampler blow counts, water color changes and estimated percent (%) water return, and changes in drill reaction to subsurface materials. On a per drill run basis, the Drill Operator must inform the Field Inspector of the materials encountered (fresh rock, broken rock, weathered rock, soil, boulders), type of drilling used, drilling activity performed, and measured depth to water.

The Contractor must document any information that might give an indication to the character of, or a change in, the subsurface materials being encountered. The Contractor must confirm with the Field Inspector the depth of all sample locations, beginnings and endings of runs, and water depths to the nearest 1/10- foot.

The Driller must furnish a signed copy of the Driller’s Daily Log to the Field Inspector at the close of each workday. The Field Inspector will immediately review the Driller’s Daily Log for consistency with the Government’s daily records. The Field Inspector will note all difference and discuss with the Driller.

If both parties agree, changes must be made to the Driller’s Daily Log. All unresolved differences must be recorded by the Field Inspector, signed by the Field Inspector and the Driller, and the Field Inspector will notify the COR by phone within 24-hours of close of the subject workday.

The Contractor must email the original Driller’s Daily Log to the COR to the address in the SOW within 72-hours of the subject workday. These daily records and the samples are considered deliverables and must be received prior to payment authorization.

XIV. MARKING HOLES

Upon completion of the drilling, all drill holes, except those where instrumentation is installed, or if the hole is in the traveled-way, must be clearly marked. The Contractor must furnish and install a 4-foot wood lath. The Contractor must label the lath with a wide permanent marking pen or paint pen (or durable equivalent). Each lath must have the following information:

1. Drill hole number and station;

2. Final hole depth; and

3. Date drilling completed.

XV. ABANDONMENT OF HOLES AND LOST EQUIPMENT

If the drilling casing, augers, or apparatus are removed from a bore hole, or if the hole is abandoned, without the permission of the COR, or a hole is started and for any reason not carried to the depth required by the SOW, or if the Contractor fails to furnish the COR the required samples, cores, and daily logs, the Contractor must make an additional boring at a location near the original site which will be selected by the COR. No payment will be made for either the abandoned hole or any cores obtained therein. However, the Contractor must make a record of abandoned bore holes and note the reasons for

RFQ 69056720Q000012

the abandonment.

All completed test holes must be abandoned in accordance with established state and local regulations and procedures.

Equipment lost in the drill hole or at any drill site will be the responsibility of the Contractor. If the equipment is lost in a drill hole prior to achieving full depth, another hole will need to be drilled adjacent at no additional cost to the Government. Payment will be made for advancement of the boring beyond the depth of abandoned drill hole adjacent to the new boring.

XVI. THIN-WALLED (SHELBY) TUBE PRESERVATION

Preserve and transport thin-wall (Shelby) tube samples in accordance with ASTM D4220M-14. Use a shipping container that allows the samples to be maintained, at all times, in the same orientation as when sampled. Include sufficient packing material inside the container to cushion or isolate the samples from vibration and shocks.

XVII. ROCK CORE PRESERVATION

The rock cores must be placed in waxed cardboard or corrugated plastic core boxes provided by the Contractor. The cores from each boring must be kept separate and the cores must be properly placed in the order in which they were removed from the core barrel. Adjacent runs must be separated by means of wood blocks (or equivalent). On each separation block the Contractor must clearly, accurately and permanently mark:

1. The depth of the top of the run to the nearest 1/10th-foot

2. The depth of the bottom of the run to the nearest 1/10th-foot

3. The run number

The Contractor must label the core boxes showing the following information:

1. Date the core was obtained

2. WFLHD Project name and WFLHD Project Number

3. Boring number

4. Starting and ending depths of core

5. Contractor's name

6. Box number and total number of boxes per boring (i.e. Box No. 2 of 8)

When coring soft rock materials, such as, siltstone, mudstone, claystone, and coals, wrap the core recovered in plastic wrap to maintain the natural moisture content of the materials for potential laboratory testing.

XVIII. PAVEMENT CORE PRESERVATION

The pavement cores must be placed in individual airtight storage container and placed in a box suitable for their protection and transport. On the airtight storage container, using a permanent marker, the Contractor must clearly write:

1. The thickness of pavement drilled measured in the drill hole and an actual core length;

2. The boring number, station, and WFLHD project name and WFLHD project number; and

3. The date.

XIX. WATER HAULING

The Contractor is eligible to claim payment for water haul when obtaining and hauling water from an approved water source more than 1/8th of a mile from the drill hole. This includes furnishing and operating equipment for the loading and hauling of water. The Contractor must provide a water truck with a minimum capacity of 500-gallons per single load of water, a pump capable of pumping a minimum of

RFQ 69056720Q000012

25-gallons per minute, and all necessary hoses. Water hauling will be paid only if the Contractor loads and hauls three-quarters or more of the trucks capacity. The Contractor will use only water sources designated and approved in the SOW. If a water source or sources are not designated in the SOW, it is the Contractor’s responsibility to locate and secure Federal, State, and local permitting (if required) for a source.

XX. MOBILIZATION

Two types of Mobilization and Demobilization will be recognized.

1. Project Mobilization & Demobilization - Includes initial mobilization to the first drill site at FHWA's project location and demobilization from the last drill site to the Contractor's place of business of all required personnel, equipment, material, and incidentals needed to successfully complete the work specified in the SOW.

2. On Project Moves - Includes the mobilization of all equipment and support vehicles from one drill site to the next. On Project Moves will only be utilized if the drill sites are 20-miles or more apart. If the drill sites are less than 20-miles apart, mobilization will be incidental to the cost of drilling. On Project Moves will also be utilized for the time required to move from one drill site to another when negotiating terrain with a track mounted drill rig

The following are incidental to the above quote items: (1) preparing work area for drilling and sampling operations; (2) removing drill rods and augers from a completed borehole; (3) loading parts and drill related equipment onto drill rigs and support trucks; and (4) steam cleaning of equipment or tools.

XXI. DRILL SITE ACCESS -NEPA Clearance to be provided or stated in the SOW.

Three primary types of drill site access will be recognized.

1. Drill Crew Work – consists of providing access to the drill site without the use of Heavy Equipment or Difficult Access Equipment. Drill Crew Work consists of all personnel and equipment, such as chainsaws, needed to access, prepare, and reclaim a drill site.

2. Construct Drill Access – consists of the use of Heavy Equipment as defined under Part A.

3. Difficult Access Equipment Use – consists of the use of difficult access equipment as defined under Part A.

Other access and mobilization equipment may include airplane, all-terrain vehicle (ATV), snowcat, snowmobile, winch, brush mower, barge, platform, pack animal, and other equipment or methods specified in the SOW.

XXII. FLAGGING PERSONNEL

The Contractor must provide flagging personnel when drilling alongside or within the traveled way of a highway, street, or roadway, including bridges and tunnels. The Contractor must also provide flagging personal when transporting loads over a traveled way using a helicopter or crane. The Contractor must provide all required equipment such as safety vests, flagging paddles, etc. All flagging personnel must be certified and have their certification card with them while performing traffic control duties.

Work is to be performed at the designated drill sites.

The work must consist of the control of motorized and non-motorized vehicular traffic to protect project personnel at designated drill sites in a manner that provides the safe and efficient movement of traffic past or around drill equipment and/or crews performing work while protecting on-site workers and equipment.

All flaggers must be in radio communication with both the flagging personnel and the drill Contractor.

Work must be performed in accordance with the most recent version of The Manual of Uniform Traffic Control Devices (MUTCD).

XXIII. MEASUREMENT AND PAYMENT

1. GENERAL

RFQ 69056720Q000012

For each SOW, the agreed unit price listed for each bid item will constitute full compensation for furnishing all equipment, labor, materials, and supplies, and performing all operations necessary to complete each item of work, except for standby time included in the quote sheet/schedule…