BP.2 - Addendum 03 - Highview.pdf
PDF 374 KB Posted
- Solicitation number
- RFP-CWS-250000002689-5
- Issued by
- Wayne County, Dansville Village, Michigan
About this file
This document is an Addendum (No. 3) for the Crestwood School District's Highview Elementary School Additions & Renovations project, specifically for Bid Package #2. The addendum was issued on July 22, 2025, with the bid proposal due date remaining unchanged at 11:00 a.m. on Tuesday, July 29, 2025. The document provides updates and clarifications to the contract documents, focusing on Bid Category 09A for Metal Studs, Drywall & Acoustical Ceilings, and includes updates from the Axiom Project Manual, pre-bid Request for Information (RFIs), and documentation from Ehresman Associates.
The addendum requires all bidders to review the changes and include all work reasonably inferred in their scope of work, with instructions to acknowledge receipt of the addendum on the Bid Proposal Form. The updated documents are available through the Axiom Construction Services Group Public Plan Room, and the addendum covers various aspects including project manual updates, pre-bid clarifications, write-ups, drawings, specifications, and potential substitution requests. No specific pricing details or funding sources are explicitly outlined in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BP.2 - Addendum 04 - Highview.pdf | ||
| ADVERTISEMENT FOR BIDS - BP2 Highview ES.pdf | ||
| BP.2 - Addendum 01 - Highview.pdf | ||
| BP.2 - Addendum 02 - Highview.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Crestwood School District
Highview ES Additions & Renovations
Bid Package #2
ADDENDUM No. 3
July 22, 2025
Bid Proposal Due Date: 11:00 a.m., Tuesday, July 29, 2025(Unchanged)
The following clarifications and/or Changes made to the Contract Documents are hereby made part of the Contract Documents.
All bidders shall be held responsible to review the Addendum and to include in its Bid Proposal all Work reasonably inferred to be included in its Scope of Work.
Acknowledge receipt of this Addendum in the space provided on the Bid Proposal Form.
Documents
1. Axiom Project Manual
a. SOW – Bid Category 09A – Metal Studs, Drywall & Acoustical Ceilings
2. Pre-Bid RFIs
3. Ehresman Associates
• Write up, drawings & specifications – See Attached
4. Substitution Requests
END OF SECTION
Addendum Document Availability
a. Addendum Documents are available at the following location:
1. Axiom Construction Services Group Public Plan Room
File details come from the government source that posted it. Updated .