This document is an Advertisement for Bids for the Montrose Community Schools BP1 HS/MS Auditorium Renovations & Addition RE-BID project. Sealed bid proposals will be accepted from qualified contractors by Montrose Community Schools. A pre-bid meeting and project walk-through will be conducted, and bids must be submitted via BuildingConnected prior to 1:00 PM on November 8, 2024. Bids will be publicly opened and read aloud at 1:05 PM that same day. The project will utilize separate prime contractors, and the Owner will award contracts on or about November 25, 2024. Contractors must provide a bid security in the form of a bid bond, cashier's check, or money order in the amount of 5% of the base bid, as well as complete familial disclosure and Iran business relationship affidavit forms.
The Advertisement specifies that the Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and waive informalities, irregularities, and/or errors in the bid proposals. The bid division referenced is 116100 - Stage Rigging.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Advertisement for Bids for Montrose Community Schools
Project Information Sealed bid proposals will be accepted from qualified contractors by Montrose Community Schools for Montrose Community Schools for the BP1 HS/MS Auditorium Renovations & Addition RE-BID. Proposals may be mailed or delivered in person to:
Linden Moore, Superintendent C/o Montrose Community Schools ELECTRONIC SEALED BIDDING Bids must be sumitted via BuildingConnected Only
Pre-Bid Meeting A pre-bid meeting and project walk-through will be conducted by the Construction Manager, Wolgast Corporation, and the Architect, Integrated Designs, Inc., on By Appointment Only.
Bid Information Proposals must be received prior to 1:00 PM (local time) on November 8, 2024 by BuildingConnected Only. Proposals will be publicly opened and read aloud at 1:05 PM in the Montrose Community Schools Public Virtual Meeting Only. All bids received after 1:00 PM on the bid date will not be accepted and will be returned to the Bidder unopened.
Proposals and Award The Project will utilize separate prime contractors. All contracts for construction will be direct contracts with the Owner. Overall administration of the Project will be the responsibility of the Construction Management Firm, Wolgast Corporation. The Owner will award contracts on or about November 25, 2024, to separate prime contractors for separate bid divisions or combinations of bid divisions. All bids shall be submitted on the bid forms provided in the project specifications, completely filled in, and executed (copies of the bid forms are acceptable). Facsimile bids will not be accepted.
Plans and Questions Requests by Contractors for inclusion as Bidders shall be addressed to the Project Manager, Craig Myers, at Wolgast Corporation. One (1) set of Bidding Documents will be provided to each contractor furnishing a plan deposit fee of $100.00 per paper set and $0 deposit for Electronic Copy through Wolgast Corporation. All checks and/or money orders are to be made payable to the Montrose Community Schools. Plan deposits are refundable. Plans may be obtained by contacting the Project Administrator, Donna Ratzlaff, at Wolgast Corporation at (989) 790-9120. All questions regarding the bidding procedures, design, and drawing/specification intent are to be directed to the Construction Manager on a Clarification Request Form (Section 00310), attention Craig Myers.
Bid Security A Bid Security by a qualified surety authorized to do business in the state where the Project is located and in the amount of five percent (5%) of the Base Bid shall accompany each proposal or proposal combination. The Bid Security may be in the form of a Bid Bond, Cashier’s Check, or Money Order. Personal checks are NOT acceptable. Bids may not be withdrawn for a period of sixty (60) days after the bid date.
Successful Bidders may be required to furnish Surety Bonds as stated in the Project Specifications (Section 00600).
Familial Disclosure All bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy. The District shall not accept a bid that does not include this sworn and notarized disclosure statement.
Iran Business Relationship Affidavit All bidders must provide a signed Iran Business Relationship Affidavit. Effective April 1, 2013 all bids, proposals, and/or qualifications statements received in the State of Michigan must comply with the Iran Economic Sanctions Act, 2012 P.A. 517. The District shall not accept a bid that does not include this signed affidavit.
Owners’ Rights The Owner reserves the right to reject any or all proposals, accept a bid other than the low bid, and to waive informalities, irregularities, and/or errors in the bid proposals, which they feel to be in their own best interest.
Bid Division 116100 – Stage Rigging
File details come from the government source that posted it. Updated .