BP-04 Torrey Hill Water Filtration Ad for Bid.pdf
PDF 102 KB Posted
- Solicitation number
- RFP LFCS 190000002634 1
- Issued by
- Genesee County, Michigan
About this file
This is an Advertisement to Bid issued by Lake Fenton Community Schools for Bid Package 003 Torrey Hill Water Filtration System, with Barton Malow Company serving as Construction Manager. The project solicits bid proposals for a water filtration system installation at the Torrey Hill facility. Bid proposals must be submitted through Building Connected by 2:00 p.m. local time on July 11, 2019, with public opening of bids occurring at the same date and time. The bid requirements are based on the Project Manual dated June 27, 2019, bid set drawings issued by I.D.I. on May 23, 2019, and specifications dated October 10, 2018. Bidders are required to submit an OSHA Form 300 for the most recent completed year, their worker's compensation Experience Modification Rate (EMR) factor, and a sworn notarized disclosure statement in accordance with MCL 380.1267 regarding any familial relationships between bidder ownership or employees and school board members or the superintendent. Bid proposals cannot be withdrawn for sixty days following the submission deadline.
Successful bidders must furnish a Performance Bond and Payment Bond in the amount of 100% of the contract price, along with Certificates of Insurance as specified in the Project Manual. Bidders are required to include state sales and/or use taxes in their bid proposals unless otherwise specified in Section 00880 of the Project Manual. Bidders must also provide Bid Security through a qualified surety authorized to conduct business in Michigan. The Owner reserves the right to reject any or all bid proposals in whole or in part and to waive any informalities or irregularities. The successful bidder will be required to enter into an agreement with the Owner using the Agreement Form identified in Section 00500 of the Project Manual.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Barton Malow Company Lake Fenton Community Schools
PROJECT MANUAL 00100-5 ISSUE DATE: June 27, 2019
SECTION 00100 – Advertisement to Bid
SECTION 00100
ADVERTISEMENT TO BID
Lake Fenton Schools requests Bid Proposals for Bid Package 003 Torrey Hill - Water Filtration System. Bid
Proposals will be received through Building Connected by 2:00 p.m. local time on July 11, 2019. All Proposals shall be submitted through Building Connected, for instructions on how to submit a bid please follow this link:
https://buildingconnected-community.force.com/s/article/How-to-submit-your-bid-directly-through-
BuildingConnected
1. Proposals shall be based on the requirements set forth in the Project Manual by Barton Malow Company dated
June 27, 2019: the bid set drawings issued by I.D.I. on May 23, 2019 and the specifications manual dated October
10, 2018.
2. Link to the Barton Malow Public Plan Room https://app.buildingconnected.com/public/55a1292ff1a96708004a19dc
3. Accepted Bidders will be required, as a condition precedent to award of Contract, to furnish in the amount of 100% of the contract price, satisfactory Performance Bond and Payment Bond and Certificates of Insurance as required in the Project Manual.
4. Unless otherwise specifically set forth in Section 00880 of the Project Manual, this Project is subject to state sales and/or use taxes and Bidder is required to include such taxes in its Bid Proposal.
5. Barton Malow Company has been contracted by the Owner in the capacity of Construction Manager for the Project, and as such has the rights and obligations set forth in its contract with the Owner for those services, and shall act as representative of the Owner to the extent required/allowed under its Owner contract.
6. Bid Proposals will be publicly opened July 11, 2019 at 2:00pm, evaluated by Barton Malow Company, Owner and the Architect, with recommended awards subsequently made by Barton Malow Company and Integrated Designs
Inc. The Owner shall not open, consider, or accept a Bid Proposal that is received after the date and time specified for bid submission in this Advertisement for Bids.
7. Bid Proposals shall be submitted through Building Connected. Bidders will be required to submit with their Bid
Proposals a Bid Security by a qualified surety authorized to do business in the state where the Project is located, an
OSHA Form 300 for the most recent completed year, their worker's compensation Experience Modification Rate
(EMR) factor, and any other information required in the Instructions to Bidders. Bidders shall not withdraw Bid
Proposals for a period of Sixty (60) Days after date for receipt of Bid Proposals.
8. The successful Bidder(s) will be required to enter into an agreement with Owner on the Agreement Form identified in Section 00500 of the Project Manual.
9. The right to reject any or all Bid Proposals, either in whole or in part, or to waive any informalities or irregularities therein is reserved by the Owner.
10. All Bid Proposals shall be accompanied by the sworn statement included in Section 00410 of the Project Manual, in accordance with MCL 380.1267, disclosing any familial relationship that exists between the owner(s) or any employee of the Bidder and any member of the school board or the superintendent of the school district. Bid
Proposals that do not include this sworn and notarized disclosure statement shall not be accepted.
BARTON MALOW COMPANY
File details come from the government source that posted it. Updated .