Boxborough_Underground_Fuel_Storage_Tank_Removal_Addendum_1.pdf

PDF 2 MB Posted

Attached to
Invitation for Bid: Underground Fuel Tank Replacement
Solicitation number
BD-27-1702-THALL-THALL-133104
Issued by
Middlesex County, Boston City, Massachusetts

About this file

This document is Addendum #1 to the Invitation for Bids for the Town of Boxborough, Massachusetts Underground Fuel Storage Tank Removal Project, dated September 16, 2026. The addendum modifies and supplements the original bid documents dated September 9, 2026, and addresses five key questions from bidders regarding project scope and specifications. The project involves the removal of two 4,000-gallon diesel underground storage tanks (USTs) located at a former fueling area. The addendum clarifies that no additional electrical shutdown work is required, all fuel has been removed from the existing tanks, and existing vent pipes at the pump house/pump shed shall remain in place and be capped at their base rather than removed. Bidders are required to acknowledge receipt of this addendum in their bids, and failure to do so may result in bid rejection.

The most significant modification pertains to environmental compliance responsibilities. The addendum shifts responsibility for retaining and coordinating with a Massachusetts Licensed Site Professional (LSP) and qualified environmental consultant from the Town to the Contractor, with all associated costs to be included in the base bid. The addendum incorporates three pages of existing tank and site plans as Attachment A for bidder reference, though the Town does not guarantee the accuracy of subsurface or existing structure information. All other provisions, requirements, and specifications of the original bid documents remain unchanged and in full force and effect.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Boxborough — Underground Fuel Storage Tank Removal Project Addendum #1 | Page 1

TOWN OF BOXBOROUGH, MASSACHUSETTS

INVITATION FOR BIDS

UNDERGROUND FUEL STORAGE TANK REMOVAL PROJECT

ADDENDUM #1

Date: September 16, 2026

This Addendum forms part of the Contract Documents and modifies and supplements the original Invitation for Bids and Contract Documents dated September 9, 2026 for the Underground Fuel Storage Tank Removal Project. Bidders shall incorporate the information and clarifications contained herein into their bids.

Questions from Bidders Question 1 — Electrical Service / Existing Underground Tank System

Reference: Section 00900 – Specifications, Section 7, “UST Removal,” and the Existing Site Plan included as Attachment A, Plan 1.

Response: No additional electrical shutdown of the former underground tank system is anticipated. Based on the Town’s understanding, the electrical service associated with the former underground tank system has been transferred to the current aboveground fuel storage tanks, which are currently in service. The existing site plan identifies the electrical conduit and petroleum line serving the former fueling area. The Contractor shall verify existing conditions and coordinate any required utility isolation or safe work procedures before commencing work.

Question 2 — Fuel Remaining in the Existing Underground Tanks

Reference: Section 00900 – Specifications, Sections 2, “Project Objectives,” and 7, “UST Removal.”

Response: No. All fuel has been removed from the existing underground storage tanks. The Contractor shall nevertheless address any residual liquids, sludge, or other regulated materials encountered during the work in accordance with the Contract Documents and applicable requirements.

Question 3 — Licensed Site Professional (LSP) and Environmental Consultant

Reference: Section 00900 – Specifications, Section 8, “Environmental Testing and Licensed Site Professional,” Section 9, “Petroleum Releases and Contaminated Soil,” Section 15, “Contractor Qualifications,” and Section 20, “Summary of Base Bid Requirements.”

Response: The Town does not have a Licensed Site Professional (LSP) or environmental consultant designated for this project. The requirement in Section 8 for coordination with a “Massachusetts Licensed Site Professional (LSP) designated by the Town” is hereby modified. The Contractor shall retain and provide, at its own cost, a Massachusetts Licensed Site Professional (LSP) and qualified environmental consultant necessary to perform and coordinate the environmental testing, evaluation, sampling, regulatory notifications, and related environmental services required for the project. The Contractor shall include all associated costs in its base bid, except for costs expressly identified elsewhere in the Contract Documents as separate or time-and-material work.

Question 4 — Vent Pipes at Pump House / Pump Shed

Reference: Section 00900 – Specifications, Section 7, Item 5, “UST Removal.”

Response: Section 7, Item 5 is hereby modified with respect to the vent piping. The existing vent pipes at the pump house/pump shed shall remain in place. The vent pipes shall be capped at the base of the structure and shall not be removed from the pump house/pump shed. This clarification supersedes any conflicting requirement in the Contract Documents concerning removal of the vent pipes from the structure.

Question 5 — Physical Specifications / Existing Underground Tanks

Reference: Section 00900 – Specifications, Section 7, “UST Removal,” and Attachment A to this Addendum.

Response: The existing tank/site plans are provided with this Addendum as Attachment A. The attachment includes:

(1) an existing site sketch identifying the former fueling area, electrical conduit, petroleum line, diesel vent, and diesel suction piping; (2) an existing tank detail/manufacturer drawing; and (3) an existing field sketch showing the

Town of Boxborough — Underground Fuel Storage Tank Removal Project Addendum #1 | Page 2 arrangement of the two underground tanks and associated dimensions. The existing Contract Documents identify the tanks as two (2) 4,000-gallon diesel USTs. The attached drawings are provided for bidders’ information and shall be considered part of the Contract Documents by this Addendum.

Town of Boxborough — Underground Fuel Storage Tank Removal Project Addendum #1 | Page 3

ADDENDUM #1 — CONTRACT DOCUMENT MODIFICATIONS

1. Licensed Site Professional / Environmental Consultant

Section 00900, Section 8, is modified so that the Contractor, rather than the Town, is responsible for retaining the Massachusetts Licensed Site Professional (LSP) and qualified environmental consultant required for the project. All references in the Contract Documents to a “Town-designated LSP” shall be construed as referring to the LSP retained by the Contractor under this Addendum.

Section 00900, Section 20, “Summary of Base Bid Requirements,” is also modified. The item stating “Coordination with the Town-designated LSP” is revised to read: “Retention and coordination with the Contractor’s Massachusetts Licensed Site Professional (LSP) and qualified environmental consultant, including all required environmental testing and regulatory coordination.”

2. Vent Piping

Section 00900, Section 7, Item 5, is modified as stated in Question 4 above. Vent pipes at the pump house/pump shed shall remain in place and shall be capped at the base of the structure. The Contractor shall not remove the vent pipes from the pump house/pump shed.

3. Existing Tank Plans

The three-page existing tank/site plan package included as Attachment A is incorporated into the Contract Documents.

The plans are provided to assist bidders in understanding existing conditions and tank configuration. As provided in Section 00100, “Information Not Guaranteed,” bidders are responsible for familiarizing themselves with site conditions, and information concerning subsurface conditions and existing structures is not guaranteed by the Town.

4. No Other Changes

Except as expressly modified or clarified by this Addendum #1, all other provisions, requirements, specifications, plans, bid forms, and Contract Documents remain unchanged and in full force and effect.

ACKNOWLEDGEMENT OF ADDENDUM

Acknowledgement of receipt of this Addendum is required with the Bid. Bidders shall acknowledge this Addendum in Section 00300, Form of General Bid, where the Bidder is required to identify the addenda received and incorporated into its bid. Failure to acknowledge this Addendum in accordance with the Contract Documents may result in rejection of the bid.

TOWN OF BOXBOROUGH

By: Town Administrator’s Office

Town of Boxborough — Underground Fuel Storage Tank Removal Project Addendum #1 | Page 4

ATTACHMENT A

Existing UST Site and Tank Plans — Provided for Bidder Information and Incorporated by Addendum #1

Town of Boxborough — Underground Fuel Storage Tank Removal Project Addendum #1 | Page 5

ATTACHMENT A — PLAN 2 OF 3

Town of Boxborough — Underground Fuel Storage Tank Removal Project Addendum #1 | Page 6

ATTACHMENT A — PLAN 3 OF 3

File details come from the government source that posted it. Updated .