Boonville Metal Roof and Siding Plans.pdf

PDF 340 KB Posted

Attached to
FY27 CD Boonville Maintenance Metal Roof and Siding Project
Solicitation number
300000283819268
Issued by
Missouri

About this file

This file contains architectural and construction plans for the Boonville Maintenance facility metal roof and siding replacement project, prepared by the Missouri Department of Transportation, Division of General Services, Facilities Management. The project involves the complete removal and replacement of the existing metal roofing system, exterior wall metal siding, trim, fascia, gutters, and downspouts at the Central District maintenance facility located at 16803 Highway 5, Boonville, Missouri 65233 in Cooper County. The scope of work includes installation of new 26-gauge mechanically seamed metal roofing with ridge cap, new 26-gauge wall metal and trim, prefinished ice and snow guards, aluminum 6-inch gutters with 3-inch by 4-inch downspouts, replacement of three man doors and four overhead garage doors with new hardware and operators, removal and reinstallation of all lighting systems, replacement of roof boots and penetrations, disconnection and reconnection of all utilities, and landscape and ground restoration. The facility has an eave height of 116 feet 1 inch, finished floor elevation of 100 feet, with dimensions of approximately 180 feet by 40 feet. Pre-bid attendance is mandatory on October 1, 2026, at 10:00 A.M., and bidders must contact the buyer of record, Logan Wilbers at logan.wilbers@modot.mo.gov, five business days before bid closing if submitting hard copy bids. Bids will be received electronically through MissouriBURS, via mail, UPS, or FedEx.

The contractor is responsible for verifying all conditions and dimensions, coordinating all trades, disposing of all debris off-site, obtaining utility locates, and maintaining a clean and safe work environment with appropriate personal protective equipment. The work must comply with the current International Building Code for Group B business use classification. The contractor is required to preserve old hardware for MoDOT and coordinate all work with the site facilities team and supervisor regarding equipment storage locations and operational hours. All restoration work, including regrading and reseeding of damaged landscaping areas, must be completed to MoDOT standards prior to final project acceptance. The contractor must supply a separate bid for any additional wet ceiling insulation discovered during roof panel removal, and MoDOT will be notified when damage insulation is found. The plans were designed by Curtis Reinkemeyer with a design date of August 26, 2026.

View the file

Other files

File Type Posted
MODOT 0000000410SL_1_SUPPLIER.pdf PDF
section 01300 and 01700.pdf PDF
AWO 33.pdf PDF
Boonville Metal Roof and Siding Specs.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BOONVILLE MAINTENANCE METAL ROOF AND SIDING - CENTAL DISTRICT

16803 HIGHWAY 5, BOONVILLE, MO 65233

COOPER COUNTY

MISSOURI DEPARTMENT OF TRANSPORTATION

INDEX OF DRAWINGS CODE REQUIREMENTS

PROJECT NOTES

CODE ANALYSIS

M

IS

SO

U

R I D

EP

A

R

TM

EN

T

O F

TR

A

N

SP

O R

TA

TI

O N

D

IV

IS

IO

N O

F G

EN

ER

A L

SE

R

V

IC

ES

FA

C

IL

IT

IE

S M

A N

A G

EM

EN

T C

O V

ER

S

H

EE

T B

O O

N V

IL

LE

M A

IN

TE

N A

N C

E M

ET

A

L R

O O

F A

N D

S

ID

IN

G

C

EN

TA

L

D

IS

TR

IC

T

H

IG

H W

A Y

, B

O O

N V

IL

LE

, M O

C

O O

PE

R

C O

U N

TY

AutoCAD SHX Text

BUILDING CODE - CURRENT IBC

AutoCAD SHX Text

USE GROUP CLASSIFICATION GROUP B, BUSINESS

AutoCAD SHX Text

1. CONTRACTOR SHALL VERIFY ALL CONDITIONS CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON DRAWINGS. 2. CONTRACTOR SHALL COORDINATE WORK OF CONTRACTOR SHALL COORDINATE WORK OF ALL TRADES. 3. ALL WORK SHALL COMPLY WITH CURRENT ALL WORK SHALL COMPLY WITH CURRENT IBC. 4. CONTRACTOR TO DISPOSE OF ALL DEBRIS CONTRACTOR TO DISPOSE OF ALL DEBRIS OFF SITE.

AutoCAD SHX Text

COVER SHEET

AutoCAD SHX Text

NOTES

AutoCAD SHX Text

ELEVATIONS

AutoCAD SHX Text

ELEVATIONS

AutoCAD SHX Text 1 - 4

AutoCAD SHX Text 2 - 4

AutoCAD SHX Text 3 - 4

AutoCAD SHX Text 4 - 4

AutoCAD SHX Text Sheet

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text of

AutoCAD SHX Text

DESIGN BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CURTIS REINKEMEYER

AutoCAD SHX Text 8/26/2026

M

IS

SO

U

R I D

EP

A

R

TM

EN

T

O F

TR

A

N

SP

O R

TA

TI

O N

D

IV

IS

IO

N O

F G

EN

ER

A L

SE

R

V

IC

ES

FA

C

IL

IT

IE

S M

A N

A G

EM

EN

T N

O

TE

S B

O O

N V

IL

LE

M A

IN

TE

N A

N C

E M

ET

A

L R

O O

F A

N D

S

ID

IN

G

C

EN

TA

L

D

IS

TR

IC

T

H

IG

H W

A Y

, B

O O

N V

IL

LE

, M O

C

O O

PE

R

C O

U N

TY

AutoCAD SHX Text BUILDING METAL (SIDING & TRIM) FULL REPLACEMENT OF BUILDING METAL SIDING AROUND THE ENTIRE STRUCTURE. CONTRACTOR TO REMOVE ALL EXISTING WALL METAL AND TRIM AND INSTALL NEW 26 GAUGE WALL METAL AND TRIM. DISCARD OFF-SITE. CONTRACTOR TO INSTALL NEW PREFINISHED ICE/SNOW GUARDS CONTRACTOR TO VERIFY SIDING PROFILE HEIGHT TO ENSURE ALIGNMENT WITH EXISTING WINDOW ELEVATIONS. REMOVE REFRIGERATION LINES, ANY CONDUIT, AND OTHER EXTERIOR-MOUNTED LINES OR PANELS TO ALLOW PROPER INSTALLATION OF NEW SIDING. PROVIDE J- TRIM AROUND MAIN ELECTRICAL PANELS, WINDOWS, AND DOORS. REMOVE BUILDING SIGNAGE PRIOR TO WORK AND REINSTALL IN SAME LOCATION UPON COMPLETION OF SIDING INSTALLATION.

AutoCAD SHX Text ROOF REPLACEMENT CONTRACTOR TO REMOVE ALL EXISITNG METAL ROOFING AND TRIM (DISCARD OFF-SITE) AND INSTALL NEW 26 GAUGE MECHANICALLY SEAMED ROOF AND RIDGE CAP, PER MANUFACTURE INSTALLATION PROCESS. REPLACE ALL ROOF BOOTS (SIZE AS REQUIRED) AND ENSURE ALL ROOF PENETRATIONS ARE PROPERLY SEALED. REMOVE (1) ROOF PENETRATION NOTED ON SHEET 4. PATCH AS REQUIRED. CONTRACTOR TO REPLACE WET CEILING INSULATION IN NOTED AREAS IN ROOF PANEL REMOVAL. MODOT TO BE NOTIFIED WHEN DAMAGE INSULATION IS FOUND. CONTRACTOR TO SUPPLY BID FOR ADDITIONAL WET CEILING INSULATION DISCOVERED.

AutoCAD SHX Text GUTTERS & DOWNSPOUTS CONTRACTOR TO REMOVE EXISTING GUTTERS, DOWNSPOUTS AND FASCIA. INSTALL NEW ALUMINUM 6" GUTTERS AND 3" X 4" DOWNSPOUTS AND FASCIA AROUND THE ENTIRE BUILDING.

AutoCAD SHX Text DOORS & HARDWARE CONTRACTOR TO REPLACE (3) MAN DOORS (SIZE 36" X 7'-0" X 1-3/4" INSULATED HOLLOW (SIZE 36" X 7'-0" X 1-3/4" INSULATED HOLLOW SIZE 36" X 7'-0" X 1-3/4" INSULATED HOLLOW METAL DOOR W/ 11" X 11" X 3/4" INSUL. TEMPERED GLASS. PAINTED. REINFORCED FOR CLOSER.) ) 1-1/2 PR. BUTTS F179-4-1/2 X 4-1/2 US26D STANLEY F179-4-1/2 X 4-1/2 US26D STANLEY US26D STANLEY STANLEY 1 ENTRANCE MB1A-3-01-15-626-S1 MARSHALL BEST ENTRANCE MB1A-3-01-15-626-S1 MARSHALL BEST MB1A-3-01-15-626-S1 MARSHALL BEST MARSHALL BEST MARSHALL BEST 1 CLOSER 8616DS DORMA CLOSER 8616DS DORMA 8616DS DORMA DORMA 1 THRESHOLD 2005A 36" X AL PEMKO THRESHOLD 2005A 36" X AL PEMKO 2005A 36" X AL PEMKO 36" X AL PEMKO PEMKO 1 SWEEP 97V 36" NATIONAL GAURD SWEEP 97V 36" NATIONAL GAURD 97V 36" NATIONAL GAURD NATIONAL GAURD 1 GASKET SET 305CN PEMKO GASKET SET 305CN PEMKO 305CN PEMKO PEMKO 1 KICK PLATE 8” X DW-2” ROCKWOOD KICK PLATE 8” X DW-2” ROCKWOOD 8” X DW-2” ROCKWOOD X DW-2” ROCKWOOD ROCKWOOD OLD HARDWARE TO BE PRESERVED FOR MODOT CONTRACTOR TO COORDINATE ALL DOOR REPLACEMENTS WITH THE FACILITIES TEAM. CONTRACTOR TO REMOVE AND REPLACE METAL FRAMING AROUND ALL GARAGE DOORS; OVERHEAD DOORS AND OPERATORS WILL REMAIN UNCHANGED. CONTRACTOR TO REMOVE EXISTING GARAGE DOOR LABELS ON SHEET 3. FILL DOOR OPENING WITH 2X MATERIAL, INSULATE (R-19), FRAMING AS REQUIRED. INTERIOR TO BE FINISHED TO MATCH EXISTING CONTRACTOR TO INSTALL (4) NEW OVERHEAD GARAGE DOORS AND OPERATORS. SEE SPEC. CONTRACTOR TO INSTALL NEW OVERHEAD DOOR METAL TRIM AND DOOR SEALS.

AutoCAD SHX Text LIGHTING CONTRACTOR TO REMOVE AND REINSTALL ALL LIGHTING. CONTRACTOR TO PROVIDE BLOCKING, JUNCTION BOX AND ELECTRICAL WHIP AS REQUIRED FOR FUNCTIONAL SYSTEM.

AutoCAD SHX Text MECHANICAL (HEATERS & VENTING) REMOVE OR REPLACE ALL ROOFTOP EQUIPMENT BOOTS AS REQUIRED. SIZE AS REQUIRED.

AutoCAD SHX Text ELECTRICAL & LOW VOLTAGE CONTRACTOR IS RESPONSIBLE FOR ALL UTILITY LOCATES PRIOR TO WORK. DISCONNECT ELECTRICAL WIRING, ANY PANELS OR BOXES, AND CONDUIT AS REQUIRED FOR SIDING INSTALLATION. ALL BUILDING PENETRATIONS TO BE SEALED WITH PROPER INDUSTRY APPROVED SEALANT.

AutoCAD SHX Text LANDSCAPE AND GROUND RESTORATION REQUIREMENTS CONTRACTOR IS RESPONSIBLE FOR PREVENTING DAMAGE TO LANDSCAPING, GRASS AREAS, AND SOIL SURFACES DURING CONSTRUCTION ACTIVITIES. CONTRACTOR SHALL REPAIR ANY RUTS, DEPRESSIONS, OR GROUND DISTURBANCE CAUSED BY EQUIPMENT, VEHICLES, OR CONSTRUCTION OPERATIONS. REPAIRS SHALL INCLUDE REGRADING, TAMPING, AND RESTORING THE SURFACE TO ORIGINAL CONDITION

AutoCAD SHX Text CONTRACTOR SAFETY RESPONSIBILITIES CONTRACTOR SHALL COORDINATE WITH THE SITE SUPERVISOR TO DETERMINE APPROVED LOCATIONS FOR STORING EQUIPMENT, MATERIALS, AND METAL ON SITE. THE CONTRACTOR MUST COORDINATE WITH THE SITE SUPERVISOR REGARDING OPERATIONAL HOURS. CONTRACTOR PERSONNEL SHALL WEAR APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT (PPE) AT ALL TIMES WHILE ON SITE, INCLUDING HARD HATS, SAFETY VESTS, SAFETY GLASSES, GLOVES, AND ANY ADDITIONAL PPE REQUIRED BY SITE CONDITIONS. CONTRACTOR PERSONNEL AND WORK AREAS ARE SUBJECT TO UNSCHEDULED SITE SAFETY INSPECTIONS CONDUCTED BY MODOT. CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL EMPLOYEES AND SUBCONTRACTORS FOLLOW ESTABLISHED SAFETY PROCEDURES AND COMPLY WITH ALL REGULATORY REQUIREMENTS. AREAS WHERE GRASS OR VEGETATION HAS BEEN DAMAGED SHALL BE RESEEDED OR REPLANTED BY THE CONTRACTOR TO ENSURE FULL RESTORATION. ALL RESTORATION WORK MUST BE COMPLETED TO MODOT STANDARDS PRIOR TO FINAL PROJECT ACCEPTANCE. CONTRACTOR SHALL MAINTAIN A CLEAN, SAFE, AND ORDERLY WORK ENVIRONMENT AT ALL TIMES WHILE ON SITE. CONTRACTOR IS RESPONSIBLE FOR SECURING ALL METAL, MATERIALS, AND EQUIPMENT STORED ON SITE TO PREVENT HAZARDS, DAMAGE, OR DISPLACEMENT DUE TO WEATHER.

AutoCAD SHX Text Sheet

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text of

AutoCAD SHX Text

DESIGN BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CURTIS REINKEMEYER

WEST ELEVATION

SOUTH ELEVATION

M

IS

SO

U

R I D

EP

A

R

TM

EN

T

O F

TR

A

N

SP

O R

TA

TI

O N

D

IV

IS

IO

N O

F G

EN

ER

A L

SE

R

V

IC

ES

FA

C

IL

IT

IE

S M

A N

A G

EM

EN

T

EL

EV

A

TI

O

N S

B O

O N

V

IL

LE

M

A

IN

TE

N

A N

C E

M

ET

A L

R O

O F

A N

D S

ID

IN

G C

EN

TA

L D

IS

TR

IC

T

H

IG

H

W A

Y

, B O

O N

V

IL

LE

, M

O

C O

O

PE

R C

O U

N

TY

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/16" = 1'-0"1/16" = 1'-0"

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/16" = 1'-0"1/16" = 1'-0"

AutoCAD SHX Text

EAVE HGT. EL. 116'-1"

AutoCAD SHX Text

FIN. FL. EL. 100'-0"

AutoCAD SHX Text 180'-0"

AutoCAD SHX Text CONTRACTOR RESPONSIBLE FOR CONTACTING, DISCONNECTING AND RECONNECTING OF ALL UTILITIES.

AutoCAD SHX Text

CONTRACTOR NOTES

AutoCAD SHX Text CONTRACTOR RESPONSIBLE REMOVING AND RECONNECTING ALL PIPING, CONDUIT, ETC. TO ALLOW FOR A FUNCTIONAL SYSTEM AFTER NEW METAL ROOF AND WALLS ARE INSTALLED.

AutoCAD SHX Text

DOOR TO BE REMOVED

AutoCAD SHX Text

EAVE HGT. EL. 116'-1"

AutoCAD SHX Text

FIN. FL. EL. 100'-0"

AutoCAD SHX Text 40'-0"

AutoCAD SHX Text

WATER DAMAGE

AutoCAD SHX Text Sheet

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text of

AutoCAD SHX Text

DESIGN BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CURTIS REINKEMEYER

EAST ELEVATION

NORTH ELEVATION

M

IS

SO

U

R I D

EP

A

R

TM

EN

T

O F

TR

A

N

SP

O R

TA

TI

O N

D

IV

IS

IO

N O

F G

EN

ER

A L

SE

R

V

IC

ES

FA

C

IL

IT

IE

S M

A N

A G

EM

EN

T R

O O

F D

ET

A

IL

S

B O

O N

V

IL

LE

M

A

IN

TE

N

A N

C E

M

ET

A L

R O

O F

A N

D S

ID

IN

G C

EN

TA

L D

IS

TR

IC

T

H

IG

H

W A

Y

, B O

O N

V

IL

LE

, M

O

C O

O

PE

R C

O U

N

TY

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/16" = 1'-0"1/16" = 1'-0"

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

SCALE: 1/16" = 1'-0"1/16" = 1'-0"

AutoCAD SHX Text

EAVE HGT. EL. 116'-1"

AutoCAD SHX Text

FIN. FL. EL. 100'-0"

AutoCAD SHX Text 180'-0"

AutoCAD SHX Text

EAVE HGT. EL. 116'-1"

AutoCAD SHX Text

FIN. FL. EL. 100'-0"

AutoCAD SHX Text CONTRACTOR RESPONSIBLE FOR CONTACTING, DISCONNECTING AND RECONNECTING OF ALL UTILITIES.

AutoCAD SHX Text

CONTRACTOR NOTES

AutoCAD SHX Text CONTRACTOR RESPONSIBLE REMOVING AND RECONNECTING ALL PIPING, CONDUIT, ETC. TO ALLOW FOR A FUNCTIONAL SYSTEM AFTER NEW METAL ROOF AND WALLS ARE INSTALLED.

AutoCAD SHX Text 40'-0"

AutoCAD SHX Text

REMOVE ROOF PENETRATION.

AutoCAD SHX Text

POSSIBLE WATER DAMAGE

AutoCAD SHX Text Sheet

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text of

AutoCAD SHX Text

DESIGN BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

CURTIS REINKEMEYER

Sheets and Views
Boonville Maintenance Metal Siding-Cover Sheet
Boonville Maintenance Metal Siding-notes
Boonville Maintenance Metal Siding-Elevations 1
Boonville Maintenance Metal Siding-Elevations 2

File details come from the government source that posted it. Updated .