This document is a Statement of Work (SOW) for ordnance assessment testing of twelve Tomahawk Shroud Explosive Bolts (P/N 2220628) at Pacific Scientific EMC in Chandler, AZ. The contractor will perform non-destructive testing, including visual inspection, bridgewire resistance, insulation resistance, electrostatic discharge, radiographic examination, and no-fire testing. Functional testing will also be conducted at cold and hot temperatures. The contractor will provide a test procedure and a technical report with all test data and results. The SOW is related to a sole source Special Notice for this requirement, which the Naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division intends to award to Pacific Scientific Energetic Materials Co. on a firm fixed price basis. The anticipated period of performance is 6 months.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW-EBOLT-2024
June 2024
STATEMENT OF WORK FOR
ORDNANCE ASSESSMENT TESTING OF
TOMAHAWK SHROUD EXPLOSIVE BOLT (P/N 2220628)
1.0 INTRODUCTION
1.1 Scope. This statement of work (SOW) defines the efforts to conduct non-destructive and functional testing of twelve (12) service returned Shroud Explosive Bolts (Raytheon P/N
2220628, PacSci P/N 93670-04) at Pacific Scientific EMC in Chandler, AZ. The explosive bolt test samples will be furnished by the Naval Surface Warfare Center, Indian Head
Division (NSWC IHD).
1.2 Background. This will be the fourth Service Life Assessment Program (SLAP) for the
Tomahawk Shroud Explosive Bolt. The last SLAP testing was conducted at Pacific
Scientific EMC in Chandler, AZ under contract #N00174-21-P-0279.
2.0 APPLICABLE DOCUMENTSDrawings.
2.1.1 Pacific Scientific Drawing 93670, Explosive Bolt Assembly
2.1.2 Raytheon Source Control Drawing 2220628, Explosive Bolt Assembly
2.2 Specifications.
2.2.1 Specification No. 60782, Explosive Bolt Assembly
2.3 Test Procedures.
2.3.1 Pacific Scientific Acceptance Test Procedure, TP-93670-04
3.0 REQUIREMENTSGovernment Furnished Property.
3.1.1 The Government will furnish the following Government Furnished Property (GFP) to the Contractor for use in performance of this contract:
ITEM: QUANTITY:
Shroud Explosive Bolts (Raytheon P/N 2220628) ______12____
3.1.2 The property will be delivered at the Government’s expense to the contractor’s facility.
3.1.3 Only the property listed above and on the GFP Attachment will be furnished by the
Government. All other property required for performance of this contract shall be furnished by the contractor.
3.1.4 Within 30 days after GFP is determined by the contractor to be lost, damaged, destroyed, no longer usable, or no longer needed for the performance of the contract, the
Contractor shall notify the Contracting Officer, in writing, thereof.
3.1.5 Disposition instructions are as follows:
• Material will be destroyed by the contractor during testing and fired hardware shall be disposed of by the contractor after acceptance of all CDRLs.
3.2 On-Site Visit and Coordination. Pacific Scientific shall notify NSWC IHD at least ten (10) days prior to functional testing so Government representatives can make travel arrangements to witness testing. During on-site visit, NSWC IHD technical representative shall observe non-destructive and functional test setups and all testing.
3.3 Test Procedure. The contractor shall provide the Shippable Work Order (SWO), in accordance with the most current revision of TP-93670-04, to the Government for review and approval at least 15 working days prior to testing. (CDRL A001)
3.4 Non-destructive Testing (NDT) and Electrical Testing. NDT and electrical testing shall not result in the damage or degradation of the integrity of the unit. Testing shall be performed as shown in Table 1. All non-destructive test and inspection results shall be recorded in the SWO and provided in the Technical Report -Test Data Pack. (CDRL
A002)
3.4.1 The visual inspection shall be conducted in accordance with ATP TP-93670-04 on the units shown in SOW Table 1. Units shall be visually inspected for defects in workmanship, service-related damage, and conformance to applicable drawings.
Photographs shall be taken prior to testing to document any non-conformance or damage. These are service returned units and may not be up to cleanliness standards of initial lot manufacture due to in-service use. Observations shall be documented for record only. Visual inspection results and photographs shall be provided in the
Technical Report -Test Data Pack.
3.4.2 The bridgewire resistance test shall be conducted on the units two times in accordance with Table 1 and ATP TP-93670-04. Units shall be tested before and after no-fire testing as required in Table 1. Photographs shall be taken of the test setup with a unit.
Bridgewire resistance test results shall be recorded in ohms and provided in the
Technical Report -Test Data Pack.
3.4.3 The insulation resistance test shall be conducted on the units in accordance with Table 1 and ATP TP-93670-04. Photographs shall be taken of the test setup with a unit.
Insulation resistance test results shall be recorded in ohms and provided in the Technical
Report -Test Data Pack.
3.4.4 The electrostatic discharge (ESD) test shall be conducted on the units in accordance with
Table 1 and ATP TP-93670-04. Photographs shall be taken of the test setup with a unit.
Electrostatic discharge test results shall be provided in the Technical Report -Test Data
Pack.
3.4.5 The radiographic examination shall be conducted on the units in accordance with Table 1 and ATP TP-93670-04. Radiographic inspection report and a digital or film copy of x-rays shall be provided with the Technical Report -Test Data Pack.
3.4.6 The no-fire test shall be conducted on the units in accordance with Table 1 and ATP TP-
93670-04. Photographs shall be taken of the test setup with a unit. No-fire test results including no-fire calibration and tester operation screen(s) shall be provided in the
Technical Report -Test Data Pack.
3.5 Functional Testing. Testing shall be performed in accordance with Table 1 and ATP TP-
93670-04. All test data and inspection results shall be recorded and provided in the
Technical Report -Test Data Pack. (CDRL A002)
3.5.1 Prior to functional testing, the units shall be temperature conditioned at 28°F or 167°F, as required in Table I, for a minimum of 4 hours and no longer than 24 hours.
Photographs shall be taken of a functional test setup with a unit.
3.5.2 Test data including bridgewire break time, function time to complete severance of the bolt, and voltage/current-time traces shall be delivered in the Technical Report -Test Data
Pack.
3.5.3 Post functional visual inspection results including complete severance of the bolt in the specified zone, and photographs of each post-fired unit shall be delivered in the Technical
Report -Test Data Pack.
Table 1: Test Matrix
TEST*
SOW SECTION
REQUIREMENT A B TOTAL
Visual Inspection 3.4.1 6 6 12
Bridgewire Resistance 3.4.2 6 6 12
Insulation Resistance 3.4.3 6 6 12
Electrostatic Discharge 3.4.4 6 6 12
Radiographic Inspection (X-ray) 3.4.5 6 6 12
No-Fire Current 3.4.6 6 6 12
Bridgewire Resistance 3.4.2 6 6 12
Functional Test 3.5, 3.5.2
Cold Temperature (+28 °F) 3.5.1 6 6
Hot Temperature (+167 °F) 3.5.1 6 6
Post-Function Visual Inspection 3.5.3 6 6 12
*Tests shall be conducted in the sequence as shown.
Shroud Explosive Bolts
(GROUPS)
3.6 Technical Report – Test Data Pack. The contractor shall provide the work completed
SWO with all inspection and test results, radiographic report and digital or film radiographs, data sheets (including FET data), voltage/current-time traces, raw data in
Excel compatible file format, conditioning chamber temperature profile, photographs, equipment and calibration list, and if necessary, associated non-conformance reports to the
Government for review and approval. (CDRL A002)
3.7 Test Failures. In the event of any failure, the contractor shall be limited to verifying the respective test setup and photographing test item and test setup. Contractor shall notify the
Government representative before proceeding with testing.
3.8 Period of Performance shall not exceed 6 months.
4.0 DELIVERABLES
4.1 Test Procedure. (CDRL A001)
First Submission – The Shippable Work Order (SWO) shall be submitted for government review and approval at least 15 working days prior to testing.
Subsequent Submission – Comments and questions shall be addressed in the subsequent submission within 7 working days of receipt of comments from the government.
4.2 Technical Report – Test Data Pack. (CDRL A002)
First Submission – The work completed SWO with all inspection and test results, radiographic report, data sheets (including FET data), and voltage/current-time traces shall be submitted to the Government for review and approval within 10 working days after completion of functional testing.
Subsequent Submission – Voltage/current-time raw data in Excel compatible file format, conditioning chamber temperature profile, equipment and calibration list, all photographs, copy of digital or film x-rays and if necessary, associated non-conformance reports shall be submitted to the Government for review and approval within 20 working days after completion of functional testing.
4.3 CDRL Summary
Table 2: CDRL Submittals
CDRL
NUMBER
TITLE FIRST SUBMISSION SUBSEQUENT
SUBMISSION
CDRL A001 Test Procedure
(SOW Section 3.3 &
4.1)
15 working days prior to testing
Within 7 working days after comments
CDRL A002 Technical Report –
Test Data Pack
(SOW Section 3.4, 3.5, 3.6 & 4.2)
Within 10 working days after completion of functional testing
Within 20 working days after completion of functional testing
4.4 Points of Contact and Deliverable Address.
NSWC IHD
4393 Benson Rd, Suite 101
Indian Head, MD 20640-5092
WAWF Acceptor:
Chrissy Fish-DeAtley, Code E24CF christina.m.fishdeatley.civ@us.navy.mil
301-744-2313
Technical Repsentative:
Garrett Batchelor, Code E24GB garrett.a.batchelor.civ@us.navy.mil