Boiler_Safety_Device_Testing_PWS_Inspection_V1_COR Approved.docx
DOCX document 42 KB Posted
- Attached to
- BOILER SAFETY DEVICE TESTING SERVICES
- Solicitation number
- 36C26126Q0778
About this file
This is a Performance Work Statement (PWS) for Boiler Safety Device Testing Services at the VA Central California Health Care System's Central Energy Plant in Fresno, California. The contractor shall provide all necessary labor, supervision, management, tools, testing equipment, transportation, permits, personal protective equipment, and qualified personnel to perform recurring inspection and testing services for boiler plant equipment, pressure vessels, and Boiler External Inspection (BEI) safety devices. The scope of work includes monthly boiler safety device testing activities, one Government-scheduled semiannual boiler safety device inspection/testing cycle per contract year, boiler pressure vessel inspection support, BEI safety device testing, completion of Government-provided testing checklists, deficiency identification and reporting, and inspection and testing documentation. Services must be performed in accordance with VHA Directive 1810, the VHA Boiler and Associated Plant Safety Device Testing Manual, Government-provided testing checklists, applicable manufacturer recommendations, OSHA requirements, and Federal, State, and local regulations.
The contract explicitly excludes repairs, corrective maintenance, equipment replacement, valve replacement, system modifications, or warranty work. This is a Firm-Fixed-Price (FFP) services contract anticipated to be awarded to a qualified firm capable of providing these inspection and testing services. The Department of Veterans Affairs is currently conducting market research through a pre-solicitation phase to identify qualified contractors, assess capability and experience, confirm geographic availability in the Central California region, and determine business size status to inform the final acquisition strategy.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26126Q0778_Sources Sought.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
BOILER SAFETY DEVICE TESTING SERVICES
1. BACKGROUND
The Central Energy Plant at the VA Central California Health Care System (VACCHCS), Fresno, California, provides steam and associated utility support necessary to sustain medical center operations and patient care activities. The boiler plant and associated equipment are mission-critical infrastructure requiring recurring inspections, testing, operational verification, and documentation to support safe and reliable operations.
VHA Directive 1810 establishes requirements for boiler and boiler plant operations and identifies the need for safe and efficient operation of high pressure, low pressure, and hot water boilers and boiler plants in VA medical facilities. The directive also requires safety devices installed in the boiler plant, steam distribution system, and boilers to be regularly tested to ensure proper function, and provides that safety devices required to be tested every six months must be tested once annually by VA medical facility staff and once annually by a qualified testing contractor unless otherwise approved by the Office of Healthcare Engineering (OHE).
This requirement supports VHA Directive 1810 compliance by obtaining qualified contractor support for boiler pressure vessel inspections, Boiler External Inspection (BEI) safety device testing, and completion of Government-provided testing forms/checklists. The contractor will perform required monthly testing activities and one required semiannual boiler safety device inspection/testing cycle during each contract year. The VA facility will remain responsible for its internal boiler operations program, scheduling decisions, and any testing activities not assigned to the contractor under this contract.
This requirement is for inspection and testing services only. The contractor shall not perform repairs, corrective maintenance, replacement of valves, parts replacement, system modifications, or warranty work under this contract unless separately authorized by the Contracting Officer through a separate contractual action.
2. SCOPE
The contractor shall provide all labor, supervision, management, tools, testing equipment, transportation, personal protective equipment (PPE), permits, and qualified personnel necessary to perform boiler pressure vessel inspections and Boiler External Inspection (BEI) safety device testing services for the Central Energy Plant located at VACCHCS Fresno, California.
The contractor shall perform required monthly testing activities and one Government-scheduled semiannual boiler safety device inspection/testing cycle during each contract year in accordance with VHA Directive 1810 requirements, applicable VHA Boiler and Associated Plant Safety Device Testing Manual requirements, Government-provided testing forms/checklists, manufacturer recommendations, OSHA requirements, and applicable Federal, State, and local regulations.
Services shall include inspection, testing, operational verification, completion of Government-provided forms/checklists, identification and reporting of deficiencies, and submission of inspection/testing documentation for the boiler plant equipment, pressure vessel inspection items, and BEI safety devices identified in Attachment A - Equipment and Safety Device Inventory.
The contractor shall coordinate all site access, outages, shutdowns, and testing activities with VA Central Energy Plant personnel prior to performing work. The contractor shall not perform work that jeopardizes the facility’s ability to maintain required steam operations or N+1 operational redundancy without prior approval from the COR or designated VA representative.
Place of performance:
Central Energy Plant, Building 2 2615 E. Clinton Avenue Fresno, CA 93703
3. REQUIRED SERVICES
The contractor shall perform inspection and testing services for the equipment and safety devices identified in Attachment A and shall complete applicable Government-provided forms/checklists associated with the required monthly testing activities and the assigned semiannual inspection/testing cycle.
3.1 Boiler Plant Equipment and Pressure Vessel Inspection Support The contractor shall perform applicable inspection and testing activities associated with the boiler plant equipment and pressure vessel inspection items identified in Attachment A. These items include, but are not limited to, boilers, boiler economizers, deaerator feed tank, condensate feed tank, steam reducing stations, boiler vessel inspection activities, deaerator tank integrity inspection, and condensate tank integrity inspection.
Inspection activities shall be performed in accordance with VHA Directive 1810, applicable VHA Boiler and Associated Plant Safety Device Testing Manual requirements, Government-provided forms/checklists, manufacturer recommendations, and applicable safety standards. The contractor shall document inspection results using the Government-provided forms/checklists and shall identify any deficiencies or abnormal conditions observed during performance.
3.2 Boiler External Inspection (BEI) Safety Device Testing
The contractor shall perform BEI safety device testing and operational verification for applicable safety devices identified in Attachment A. Required testing shall be performed using Government-provided testing forms/checklists and in accordance with the applicable VHA Directive 1810 requirements and VHA Boiler and Associated Plant Safety Device Testing Manual requirements.
The contractor shall perform the monthly testing activities assigned under the contract and one Government-scheduled semiannual boiler safety device inspection/testing cycle during each contract year. The COR or designated VA representative will identify the specific testing cycle, schedule, and associated Government-provided forms/checklists to be completed by the contractor.
Testing may include, as applicable to the assigned testing cycle and Government-provided forms/checklists, operational testing, verification of proper function, interlock verification, alarm verification, shutdown verification, pressure verification, timing verification, seat leakage verification, and related testing necessary to verify safe and proper operation of boiler plant safety devices.
The contractor shall complete all Government-provided testing forms, checklists, inspection sheets, and associated documentation applicable to the inspection and testing services performed under this contract.
3.3 Safety and Operational Coordination
The contractor shall provide all required testing equipment, safety equipment, PPE, lockout/tagout procedures, confined space procedures, hot work permits when applicable, and qualified personnel necessary to safely perform the required inspection and testing services.
The contractor shall coordinate with VA Central Energy Plant personnel prior to performing work that requires equipment access, boiler shutdown, system isolation, operational testing, or other activities that may affect boiler plant operations. The contractor shall immediately notify VA Central Energy Plant personnel of any identified unsafe condition, failed safety device, equipment deficiency, or operational concern discovered during inspection or testing activities.
3.4 Deficiency Identification and Reporting
The contractor shall document all identified deficiencies, failed components, non-compliant conditions, abnormal operating conditions, failed safety devices, and recommended corrective actions identified during inspection and testing activities.
The contractor shall not perform corrective maintenance or repairs under this contract. Deficiencies requiring repair, replacement, adjustment beyond testing requirements, or other corrective action shall be documented and reported to the COR or designated VA representative for separate Government action.
3.5 Documentation Requirements
The contractor shall provide all completed Government-provided forms/checklists, inspection reports, testing documentation, certification documentation, deficiency reports, and related records generated during performance of the work to the COR or designated VA representative.
Documentation shall clearly identify the equipment inspected or tested, testing performed, results obtained, deficiencies identified, recommended corrective actions, technician name(s), date of service, and applicable checklist/form completed.
4. EQUIPMENT COVERED
The contractor shall perform inspection, testing, and associated documentation services for the boiler plant equipment, pressure vessel inspection items, and BEI safety devices identified in Attachment A - Equipment and Safety Device Inventory.
Attachment A is organized into three tables: Boiler Plant Equipment, Pressure Vessel Inspections, and BEI Safety Devices. Applicable Government-provided testing forms/checklists associated with the equipment identified in Attachment A will be provided as separate attachments to the final PWS and shall be completed by the contractor for required inspection/testing activities performed under this contract.
5. PERFORMANCE REQUIREMENTS
The contractor shall perform all services in a professional and workmanlike manner using qualified personnel knowledgeable in boiler pressure vessel inspections and BEI safety device testing services.
The contractor shall ensure all work is performed in accordance with VHA Directive 1810, applicable VHA Boiler and Associated Plant Safety Device Testing Manual requirements, manufacturer recommendations, OSHA requirements, and all applicable Federal, State, and local regulations.
The contractor shall coordinate all inspection, testing, access, outage, isolation, and shutdown activities with VA Central Energy Plant personnel prior to performing work.
The contractor shall not perform work that jeopardizes the facility’s ability to maintain required boiler plant operations or N+1 operational redundancy without prior approval from the COR or designated VA representative.
The contractor shall promptly address and resolve performance concerns, operational coordination issues, reporting deficiencies, and documentation deficiencies identified by the COR or designated VA representative during performance of the contract.
The contractor shall maintain a clean and safe work area throughout performance and shall remove contractor-generated debris and waste materials from the Government facility upon completion of work unless otherwise directed by the COR.
Completed Government-provided forms/checklists and inspection/testing reports shall be submitted to the COR or designated VA representative within five (5) business days following completion of each required inspection/testing activity unless otherwise directed by the COR.
5.1 Scheduling Requirements
The Government will identify the required monthly testing activities and the specific semiannual testing cycle to be performed by the contractor during each contract year. The contractor shall coordinate scheduling with the COR or designated VA representative and VA Central Energy Plant personnel prior to performing work.
The contractor shall provide advance coordination before work requiring access to equipment, outages, shutdowns, system isolation, or operational testing. The contractor shall not perform simultaneous shutdown or testing activities that could adversely affect boiler plant operations without prior Government approval.
6. DELIVERABLES AND REPORTING REQUIREMENTS
The contractor shall provide complete, accurate, and legible documentation for all inspection and testing services performed under this contract.
Deliverables include, at a minimum:
Completed Government-provided testing forms/checklists applicable to the monthly testing activities performed;
Completed Government-provided testing forms/checklists applicable to the assigned semiannual inspection/testing cycle;
Inspection and testing reports documenting work performed and results obtained;
Deficiency reports identifying failed safety devices, non-compliant conditions, abnormal operating conditions, and recommended corrective actions;
Technician name(s), date of service, equipment tested, and applicable checklist/form completed;
Certification or qualification documentation upon request by the Contracting Officer or COR.
The contractor shall immediately notify the COR or designated VA representative of any identified condition that may impact safe boiler plant operation, create an immediate safety concern, impact regulatory compliance, or require emergency operational response.
7. CONTRACTOR QUALIFICATIONS
The contractor shall possess the technical capability, qualified personnel, and resources necessary to safely and successfully perform boiler pressure vessel inspections and BEI safety device testing services identified within this PWS.
The contractor shall qualify as a “Qualified Testing Contractor” as defined by VHA Directive 1810. VHA Directive 1810 defines a qualified testing contractor as an individual/company that has performed testing in compliance with the VHA Boiler and Associated Plant Safety Device Testing Manual in at least three other VA medical facilities.
The contractor shall ensure all personnel performing work under this contract are properly trained, qualified, and knowledgeable in boiler pressure vessel inspections, boiler safety device testing, steam boiler safety systems, burner management systems, lockout/tagout procedures, confined space procedures, and applicable OSHA safety requirements.
The contractor shall comply with all applicable Federal, State, and local licensing, certification, and safety requirements associated with performance of the required services, including any State of California requirements applicable to the services being performed.
Contractor personnel performing work under this contract shall be able to effectively communicate in English with VA personnel and shall be capable of reading and understanding applicable safety procedures, operational instructions, equipment documentation, warning signs, and testing documentation necessary to safely perform the required services.
Upon request by the Contracting Officer or COR, the contractor shall provide documentation demonstrating personnel qualifications, certifications, licenses, training, and experience applicable to the services being performed under this contract.
8. PLACE AND HOURS OF PERFORMANCE
Services shall be performed at the Central Energy Plant located at:
Central Energy Plant, Building 2 2615 E. Clinton Avenue Fresno, CA 93703 Normal hours will be 8:00am – 4:30 pm Monday-Friday shall be coordinated with the COR or designated VA representative. Work performed outside normal business hours, during weekends, or on Federal holidays shall require prior approval from the COR or designated VA representative.
The contractor shall comply with all VA facility access, badging, parking, safety, and security procedures applicable to the place of performance.
9. GOVERNMENT-FURNISHED INFORMATION AND COORDINATION
The Government will provide reasonable access to the Central Energy Plant and associated boiler plant equipment, pressure vessels, and safety devices necessary for performance of the required services identified within this PWS.
The Government will provide applicable equipment information, Government-provided testing forms/checklists, available historical inspection/testing records when available, and operational coordination support necessary to facilitate performance of the required services.
The Government will coordinate required boiler outages, operational shutdown approvals, access to equipment, and scheduling of monthly and semiannual inspection/testing activities as necessary to support contract performance.
The Government does not guarantee uninterrupted access to equipment or facilities and reserves the right to modify scheduling requirements as necessary to support medical center operations, patient care activities, or emergency operational requirements.
10. SECURITY REQUIREMENTS
The contractor shall comply with all applicable VA facility security, safety, access, and badging requirements while performing services under this contract.
Contractor personnel shall conduct themselves in a professional manner while performing work at VA facilities and shall comply with all applicable VA workplace conduct, safety, harassment prevention, smoking, and drug-free workplace policies while on Government property.
Possession of firearms, weapons, or other prohibited items is not permitted on VA property except as authorized by applicable Federal law and VA policy.
Contractor personnel shall not access VA information systems, networks, or Government data beyond what is necessary to perform the required services identified within this contract.
11. RECORDS MANAGEMENT REQUIREMENTS
The contractor shall maintain all records, inspection reports, testing documentation, certifications, and related documentation generated under this contract in accordance with applicable Federal and VA records management requirements.
All records and documentation generated in performance of this contract shall be provided to the Government upon request and upon completion of contract performance.
The contractor shall protect all Government information obtained during performance of the contract from unauthorized disclosure and shall use such information only for purposes associated with performance of the required services.
12. INVOICE AND PAYMENT REQUIREMENTS
Payment under this contract shall be based upon satisfactory completion of required monthly testing activities, one required semiannual inspection/testing cycle during each contract year, and submission of required inspection/testing documentation and completed Government-provided testing forms/checklists.
Invoices shall include, at a minimum:
Contract number;
Invoice number and date;
Billing period or date of service;
Description of inspection/testing services completed;
Reference to completed Government-provided forms/checklists submitted;
Applicable CLIN or contract line item;
Total amount invoiced.
Invoices shall be supported by documentation demonstrating satisfactory completion of services performed. The Government reserves the right to reject invoices that are unsupported, incomplete, inaccurate, or not consistent with contract performance requirements.
Invoices shall be submitted electronically through the Government-designated invoicing system unless otherwise directed by the Contracting Officer.
ATTACHMENT A
Equipment and Safety Device Inventory The contractor shall perform inspection/testing services for the equipment and safety devices listed below, as applicable to the required monthly testing activities and the Government-scheduled semiannual inspection/testing cycle. The COR shall review and confirm the final equipment inventory prior to solicitation release.
A.1 Boiler Plant Equipment
| Equipment/System |
| Manufacturer |
| Model Number |
| Quantity |
| Inspection Type |
| Cleaver Brooks Boiler |
| Cleaver Brooks |
| 3WI 200-300-200ST |
| 3 |
| Operational / Integrity Inspection |
| Boiler Economizers |
| Cain Industries |
| S/N 4849, 4850, 4851 |
| 3 |
| Operational / Integrity Inspection |
| Deaerator Feed Tank |
| Parker Boiler CO. |
| 61466 |
| 1 |
| Integrity Inspection |
| Condensate Feed Tank |
| Parker Boiler CO. |
| 61464 |
| 1 |
| Integrity Inspection |
| Steam Reducing Stations |
| Armstrong |
Spirax Sarco 94115080 71417
| 2 |
| Operational Inspection |
A.2 Pressure Vessel Inspections
| Equipment/System |
| Quantity |
| Inspection Type |
| Boiler Vessel Inspection (Waterside/Fireside/Integrity) |
| 3 |
| Pressure Vessel Inspection |
| Deaerator Tank Integrity Inspection |
| 1 |
| Integrity Inspection |
| Condensate Tank Integrity Inspection |
| 1 |
| Integrity Inspection |
A.3 BEI Safety Devices
| Safety Device |
| Quantity |
| BEI Testing Required |
| High Water Alarm on Condensate Tank (HWACT) |
| 1 |
| Yes |
| Low Water Alarm on Condensate Tank (LWACT) |
| 1 |
| Yes |
| High Water Alarm on Deaerator Tank (HWADT) |
| 1 |
| Yes |
| Low Water Alarm on Deaerator Tank (LWADT) |
| 1 |
| Yes |
| Deaerator Overflow Drain System (DAODS) |
| 1 |
| Yes |
| Deaerator Safety Valve (DASV) |
| 1 |
| Yes |
| Safety Valve Following PRV (SVFPRV) – Deaerator |
| 1 |
| Yes |
| Safety Valve Following PRV (SVFPRV) – Other |
| 1 |
| Yes |
| Liquid Relief Valve on Oil Pump Set (LRVOPS) |
| 3 |
| Yes |
| Liquid Relief Valve on Economizer (LRVE) |
| 3 |
| Yes |
| Carbon Monoxide and Combustible Gas Alarms in Boiler Plant (CMCGABP) |
| 3 |
| Yes |
| Emergency Stop Panic Button (ESPB) |
| 1 |
| Yes |
| High Fuel Gas Pressure Alarm on Main Gas Line (HFGPAMG) |
| 1 |
| Yes |
| Low Water Alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO) |
| 3 |
| Yes |
| High Water Alarm on Boiler (HWAB) |
| 3 |
| Yes |
| High / High High Boiler Steam Pressure Limit Switches (HBSPLS & HHBSPLS) |
| 3 |
| Yes |
| Steam Safety Valves on Boiler (SVB) |
| 6 |
| Yes |
| Low Fuel Gas Pressure Cutoff Switch (LFGPCS) |
| 3 |
| Yes |
| High Fuel Gas Pressure Cutoff Switch (HFGPCS) |
| 3 |
| Yes |
| Automatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV & AFGSVV) – Main Gas |
| 3 |
| Yes |
| Automatic Pilot Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (APFGSOV & APFGSVV) – Pilot Line |
| 3 |
| Yes |
| Proof of Closure on Automatic Fuel Shutoff Valves (POC-AFGSOV) – Natural Gas |
| 3 |
| Yes |
| Flame Scanner – Main Flame Out (FSMFO) |
| 3 |
| Yes |
| Flame Scanner Not Sensing Igniter Spark (FSNSIS) |
| 3 |
| Yes |
| Igniter Timing (IT) |
| 3 |
| Yes |
| Main Flame Ignition Timing (MFIT) |
| 3 |
| Yes |
| Pre-Purge and Post-Purge Timing (PPT) |
| 3 |
| Yes |
| Low-Fire Proving Switch (LFPS) |
| 3 |
| Yes |
| Forced Draft Damper Wide-Open Pre-Purge Proving Switch (FDDWOPS) |
| 3 |
| Yes |
| Combustion Air Pressure Switch (CAPS) – Variable Speed Fan |
| 3 |
| Yes |
| Purge Airflow Proving Switch (PAPS) |
| 3 |
| Yes |
| Forced Draft Motor Interlock Switches (FDMIS) |
| 3 |
| Yes |
| Outlet Stack Damper Position Interlock Switch (OSDPI) |
| 3 |
| Yes |
| Furnace Pressure Interlock (FPI) |
| 3 |
| Yes |
| Low Pilot Fuel Gas Pressure Cutoff Switch (LPFGPCS) |
| 3 |
| Yes |
| Flue Gas Recirculation Damper Interlock (FGRDI) |
| 3 |
| Yes |
| Low Flue Gas Oxygen Level Interlock (LFGOLI) |
| 3 |
| Yes |
| Low Fuel Oil Pressure Cutoff Switch (LFOPCS) |
| 3 |
| Yes |
| High Fuel Oil Pressure Cutoff Switch (HFOPCS) |
| 3 |
| Yes |
| Low Atomizing Media Pressure Switch (LAMPS) |
| 3 |
| Yes |
| Low Atomizing Media Differential Pressure Switch (LAMDPS) |
| 3 |
| Yes |
| Secondary Low Atomizing Media Pressure Switch (SLAMPS) |
| 1 |
| Yes |
| Automatic Fuel Oil Shutoff Valves (AFOSV) – Seat Leakage |
| 3 |
| Yes |
| Proof of Closure on Automatic Fuel Oil Shutoff Valves (POC-AFOSV) |
| 3 |
| Yes |
| Oil Burner Position Switch (OBPS) |
| 3 |
| Yes |
| Outside Air Damper Interlock with Alarm (OADIA) |
| 1 |
| Yes |
| Outside Air Make Up Unit Interlock with Alarm (OAMUIA) |
| 1 |
| Yes |
| Steam Safety Valves (accumulation test at high fire) |
| 3 |
| Yes |
ATTACHMENT B
Government-Provided Testing Forms/Checklists Below are the VHA Directive 1810 testing forms/checklists for the required monthly testing activities and the Government-scheduled annual and semiannual inspection/testing cycle. The contractor shall complete and submit all applicable forms/checklists for the services performed under this contract.
| Monthly |
| Quantity |
| Number of Boilers |
| Fire Auxiliary Main and Pilot Fuel for One Hour |
| 12 |
| 3 |
| Checklist for Low Water Alarm and Cutoffs on Boiler (LWA,LWCO,ALWCO) |
| 12 |
| 3 |
| Checklist for Low Water Alarm and Cutoffs (LWA,LWCO,ALWCO) |
| 12 |
| 3 |
| Checklist for High Water Alarm on Boiler (HWAB) |
| 12 |
| 3 |
| Checklist for High Water Alarm and Cutoffs (HWAB) |
| 12 |
| 3 |
| Checklist for Flame Scanner - Main Flame Out Boiler (FSMFO) |
| 12 |
| 3 |
| Checklist for Flame Scanner for Main Flame Out (FSMFO) |
| 12 |
| 3 |
| Semiannual (One Required Cycle Per Contract Year) |
| Quantity |
| Number of Boilers |
| Annual (Semi-Annual Test) |
| 1 |
| 3 |
| A Checklist for Igniter Timing (IT) |
| 1 |
| 3 |
| A Checklist for Main Flame Ignition Timing (MFIT) |
| 1 |
| 3 |
| A Checklist for Forced Draft Wide-Open Pre-purge Proving Switch (FDDWOPS) |
| 1 |
| 3 |
| A Checklist for Combustion Air Pressure Switch (CAPS) |
| 1 |
| 3 |
| A Checklist for Forced Draft Motor Interlock Switches (FDMIS) |
| 1 |
| 3 |
| A Checklist for Low Atomizing Media Pressure Switch (LAMPS) |
| 1 |
| 3 |
| A Checklist for Proof of Closure on Automatic Fuel Oil Shutoff Valves (POC-AFOSOV) |
| 1 |
| 3 |
| Annual |
| Quantity |
| Number of Boilers |
| Emergency Stop/Panic Buttons (ESPB) |
| 4 |
| Boiler Plant |
| Steam Safety Valves (accumulation test at high fire) |
| 6 |
| 3 |
ATTACHMENT C
SERVICE SCHEDULE REQUIREMENTS
| Service Activity |
| Frequency |
| Description |
| Monthly Boiler Safety Device Testing |
| Monthly |
| Contractor shall perform required monthly boiler safety device testing activities in accordance with VHA Directive 1810 requirements, Government-provided testing forms/checklists, and manufacturer recommendations applicable to equipment identified in Attachment A. |
| Semiannual Boiler Safety Device Inspection and Testing Cycle |
| Semiannual (One Required Cycle Per Contract Year) |
| Contractor shall perform one required semiannual boiler safety device inspection/testing cycle during each contract year in accordance with VHA Directive 1810 requirements, Government-provided testing forms/checklists, and operational coordination requirements established by the COR or designated VA representative. |
| Boiler Pressure Vessel Inspections |
| As Required by VHA Directive 1810 and Operational Schedule |
| Contractor shall perform required boiler pressure vessel inspections associated with equipment identified in Attachment A and applicable Government-provided testing forms/checklists. |
| Operational Coordination and Outage Scheduling |
| As Required |
| Contractor shall coordinate all inspections, testing activities, outages, shutdowns, and operational access requirements with the COR and Central Energy Plant personnel prior to performance of work. |
| Inspection/Test Documentation Submission |
| After Each Inspection/Testing Event |
| Contractor shall submit completed inspection reports, testing documentation, and Government-provided testing forms/checklists following completion of required inspection/testing activities. |
| Deficiency Reporting |
| As Required |
| Contractor shall document and report identified deficiencies, failed devices, unsafe conditions, or operational concerns identified during inspections/testing activities. |
| Corrective Action Recommendations |
| As Required |
| Contractor shall provide recommendations for corrective action associated with identified deficiencies or non-compliant conditions identified during inspections/testing activities. |
File details come from the government source that posted it. Updated .