Boiler_&_Pump_Specification_Package.pdf
PDF 815 KB Posted
- Solicitation number
- PD 24-25.133
- Issued by
- Escambia County, Florida
About this file
This document is a detailed technical specification for boiler and pump equipment for the Escambia County Facilities Management in Florida, specifically for the ELM Building Boiler Replacement project. The specification covers the procurement of AERCO Benchmark 3000 Low NOx boilers and Bell & Gossett E-1510 pumps, with a design basis focusing on natural gas-fired condensing boilers. The document provides comprehensive technical requirements for the equipment, including detailed specifications for construction, controls, electrical characteristics, venting, installation procedures, and performance testing. The equipment is intended to replace non-operational boilers that are beyond their life expectancy, with delivery scheduled to support installation prior to October 15, 2025.
The specification sets strict technical standards for the boiler equipment, including requirements for UL and NEMA compliance, efficiency ratings, electrical specifications, and advanced control features. The boilers must meet specific performance criteria, such as low NOx emissions (20 ppm corrected to 3% oxygen), multiple efficiency levels at different firing rates, and integrated control systems with capabilities like Boiler Sequencing Technology, variable speed pump control, and Building Automation System compatibility. The document also outlines warranty terms, with different coverage periods for various components, ranging from 18 months to 10 years depending on the specific part. The procurement appears to be equipment-only, with the county seeking to advance purchase the equipment to align with a separate installation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .