Boiler Plant Equipment List.pdf

PDF 144 KB Posted

Attached to
C1NB--Modernize Boiler Plant 590-22-990
Solicitation number
36C24624R0085
Issued by

About this file

This document is a Pre-Solicitation for a federal contract opportunity to modernize the boiler plant at the Hampton VA Medical Center. The Department of Veterans Affairs is seeking the services of an Architect-Engineer (A-E) firm with specialized experience in hospital design and boiler plant modernization to provide design and construction period services for this project. The estimated cost of construction is between $10 million and $20 million, and the project will be set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The A-E firm will be required to submit an SF-330 package, which will be evaluated based on criteria such as professional qualifications, specialized experience, past performance, capacity to accomplish the work, and construction period services. The A-E firm must be certified as an SDVOSB by the Small Business Administration. The deadline for submitting the SF-330 package is August 21, 2024.

View the file

Other files

File Type Posted
36C24624R0085.docx DOCX document
590-22-990 Modernize Boiler Plant SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EQUIPMENT NAME DATE LIFE

EXPECTENCY

#1 Boiler Age 1971 2001 10 years

#2 Boiler Age 1971 2001 10 years

#3 Boiler Age 1971 2001 10 years

Economizer #1 Boiler 2015 25 years

Economizer #2 Boiler 2015 25 years

Economizer #3 Boiler 2015 25 years

Boiler Control Panel #1 2015 5 years

Boiler Control Panel #2 2015 5 years

Boiler Control Panel #3 2015 5 years

Master Boiler Control Panel

2015 5 years

Scader System Hays Cleveland

2015 5 years

DA TANK 1991 5 years

Condensate Tank 2020 30 Years

Boiler Blow Down Tank 1971 3-5 years

#1 Main Feed Pump Electric

Apr-24 10 years

#2 Main Feed Pump Electric

Feb-24 10 Years

#3 Main Feed Pump Steam

1989 do not know

Air Compressor #1 Sullair

2014 10 years

Air Compressor #2 Quincy

2020 25 years

Air Compressor #3 Quincy

1991 5 years

FD Fan Motor #1 2015 5 years

FD Fan Motor #2 2015 5 Years

FD Fan Motor #3 2015 5 Years

VFD Drive #1 2015 5 years

VFD Drive #2 2015 5 years

VFD Drive #3 2015 5 years

Fuel Oil Service Pump #1 2013 5 years

Fuel oil Service Pump #2 Before 2006 5 years

Fuel Oil Tank #1

Fuel oil Tank #2

Fuel Oil tank #3

Water Softener #1

Water Softener #2

Water Softener Salt Tank

Main Sump Pump #1 2020 10 years

Main Sump Pump #2 2020 10 years

Steam Pressure 90/60 Reducer Top

2021 10 years

Steam Pressure 90/60 Bottom

1991 5 years

Steam Augmenting Station

Before 2000 5 years

Boiler #1 Safety Valves

Boiler #2 Safety Valves

Boiler #3 Safety Valves

Chemical Pump (Polymer)

5 Years

Chemical Pump (Amine) chemical Pump ( sulfite)