Boiler Plant Equipment List.pdf
PDF 144 KB Posted
- Attached to
- C1NB--Modernize Boiler Plant 590-22-990
- Solicitation number
- 36C24624R0085
About this file
This document is a Pre-Solicitation for a federal contract opportunity to modernize the boiler plant at the Hampton VA Medical Center. The Department of Veterans Affairs is seeking the services of an Architect-Engineer (A-E) firm with specialized experience in hospital design and boiler plant modernization to provide design and construction period services for this project. The estimated cost of construction is between $10 million and $20 million, and the project will be set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The A-E firm will be required to submit an SF-330 package, which will be evaluated based on criteria such as professional qualifications, specialized experience, past performance, capacity to accomplish the work, and construction period services. The A-E firm must be certified as an SDVOSB by the Small Business Administration. The deadline for submitting the SF-330 package is August 21, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24624R0085.docx | DOCX document | |
| 590-22-990 Modernize Boiler Plant SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT NAME DATE LIFE
EXPECTENCY
#1 Boiler Age 1971 2001 10 years
#2 Boiler Age 1971 2001 10 years
#3 Boiler Age 1971 2001 10 years
Economizer #1 Boiler 2015 25 years
Economizer #2 Boiler 2015 25 years
Economizer #3 Boiler 2015 25 years
Boiler Control Panel #1 2015 5 years
Boiler Control Panel #2 2015 5 years
Boiler Control Panel #3 2015 5 years
Master Boiler Control Panel
2015 5 years
Scader System Hays Cleveland
2015 5 years
DA TANK 1991 5 years
Condensate Tank 2020 30 Years
Boiler Blow Down Tank 1971 3-5 years
#1 Main Feed Pump Electric
Apr-24 10 years
#2 Main Feed Pump Electric
Feb-24 10 Years
#3 Main Feed Pump Steam
1989 do not know
Air Compressor #1 Sullair
2014 10 years
Air Compressor #2 Quincy
2020 25 years
Air Compressor #3 Quincy
1991 5 years
FD Fan Motor #1 2015 5 years
FD Fan Motor #2 2015 5 Years
FD Fan Motor #3 2015 5 Years
VFD Drive #1 2015 5 years
VFD Drive #2 2015 5 years
VFD Drive #3 2015 5 years
Fuel Oil Service Pump #1 2013 5 years
Fuel oil Service Pump #2 Before 2006 5 years
Fuel Oil Tank #1
Fuel oil Tank #2
Fuel Oil tank #3
Water Softener #1
Water Softener #2
Water Softener Salt Tank
Main Sump Pump #1 2020 10 years
Main Sump Pump #2 2020 10 years
Steam Pressure 90/60 Reducer Top
2021 10 years
Steam Pressure 90/60 Bottom
1991 5 years
Steam Augmenting Station
Before 2000 5 years
Boiler #1 Safety Valves
Boiler #2 Safety Valves
Boiler #3 Safety Valves
Chemical Pump (Polymer)
5 Years
Chemical Pump (Amine) chemical Pump ( sulfite)