BNO New Engine_Redacted.pdf
PDF 294 KB Posted
- Attached to
- PUMP & ENGINE PACKAGE
- Solicitation number
- FA487726QA123
About this file
This is a Single Source Justification (Simplified Acquisition) document prepared by the 355 Contracting Squadron for a non-competitive procurement action. The contracting activity is seeking to purchase a new pump and engine to repair a Distributor & Water Tank Vehicle, Model 1500R. The specific requirement is for a Darley HE 500 350-500 GPM single stage centrifugal pump with a Kubota V3600 engine, 84.5 horsepower, with control panel and 4-inch VICeither T ports, JP8 fuel capability, and no installation or service required.
The justification for single source procurement under RFO 12.102(a) is based on technical specifications that are mandatory for the 1500 International Water Distribution Truck, which is engineered to accommodate only two direct-fit engine models: the V3600-E3 and V3600-T-E3. The document notes that any alternative engine would require major structural modifications to the engine bay, additional component integration, and reengineering of supporting systems, making such modifications cost-prohibitive and technically unfeasible. Market research identified multiple Service Disabled Veteran Owned Small Businesses capable of fulfilling the requirement with the requested or similar specifications. The Contracting Officer has determined under FAR 13.106-1(b)(1) that only a single source is reasonably available for this acquisition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Real ID Requirement .pdf | ||
| Salient-Characteristics_Redacted.pdf | ||
| Provisions and Clauses FA487726QA123 updated.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Single Source Justification (Simplified Acquisition)
CONTROLLED UNCLASSIFIED INFORMATION
April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 2April 2021 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 2
Section F: Contracting Officer's Determination
I have determined, in accordance with FAR 13.106-1(b)(1), that the circumstances of this contract action deem only a single source is reasonably available.
Date Typed Name and Rank/Grade of Contracting Officer Signature of Contracting Officer
File details come from the government source that posted it. Updated .