This is a Statement of Work (SOW) for the Federal Bureau of Prisons facility at FCC Beaumont requiring contractor services for the removal, cleaning, and disposal of gray water, grease, and non-potable water from storage tanks across the institution complex.
The contractor shall provide comprehensive labor, equipment, materials, and disposal services to pump, remove, transport, and properly dispose of accumulated gray water, grease, sludge, sediment, and non-potable water from six tanks located at four facility locations: FPC (Camp) with one 7,200-gallon tank, FCI Low with two 6,000-gallon tanks, FCI Medium with one 12,000-gallon tank, and USP with two 6,000-gallon tanks, totaling 43,200 gallons of estimated capacity. The contractor must thoroughly clean each tank to remove residual buildup and restore operational condition. All work must be completed safely and efficiently with minimal operational disruption. Required equipment includes vacuum pumping trucks, pressure washing equipment, transport vehicles, cleaning chemicals, spill containment materials, personal protective equipment, and specialized tools. The contractor is responsible for coordinating scheduling and access, ensuring disposal at approved facilities with proper documentation, leaving work areas clean and operational, and reporting any identified deficiencies. Deliverables include confirmation of completion, estimated gallons removed, disposal manifests, and documentation of identified deficiencies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 15B50226Q00000047 - Grease Trap Cleaning.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCC Beaumont – Food Service
Statement of Work :
Removal and Cleaning of Gray Water, Grease, and Non-Potable Water Storage Tanks
1. Scope of Work The contractor shall provide all labor, supervision, equipment, transportation, materials, tools, cleaning agents, disposal services, and incidentals necessary to remove, transport, and properly dispose of accumulated gray water, grease, sludge, sediment, and non-potable water from designated storage tanks located throughout the institution complex.
The contractor shall thoroughly clean each tank to remove residual grease buildup, standing liquids, sediment accumulation, and other debris to restore tanks to operational condition.
2. Locations and Tank Capacities FPC – (Camp) 1 Tank – 7,200 Gallons FCI Low (FCIL) – 2 Tanks – 6,000 Gallons Each FCI Medium (FCIM) – 1 Tank – 12,000 Gallons USP – 2 Tanks – 6,000 Gallons Each
Total Estimated Capacity: 43,200 Gallons
3. Contractor Responsibilities
- Pump, remove, and transport all contents.
- Provide vacuum trucks, pumps, hoses, pressure washing equipment, and cleaning tools.
- Provide all cleaning chemicals and supplies.
- Remove grease buildup and residual materials.
- Dispose of waste per all applicable regulations.
- Leave work areas clean and operational.
- Coordinate scheduling and access.
- Report deficiencies observed.
4. Disposal Requirements Dispose of all waste at approved facilities and provide documentation upon request.
5. Equipment and Supplies Vacuum pumping equipment, pressure washing equipment, transport vehicles, cleaning chemicals, spill containment, PPE, and specialized tools.
6. Performance Requirements Work shall be completed safely and efficiently with minimal operational disruption.
7. Deliverables Confirmation of completion, estimated gallons removed, disposal manifests, and identified deficiencies.