BMS-ATC Replacement Project Manual 20210524.pdf

PDF 29 MB Posted

Attached to
Automatic Temperature Control System Replacement
Solicitation number
BD-21-1301-10-10-63129
Issued by
Nantucket County, Nantucket CDP, Massachusetts

About this file

The document is a project manual for the BMS-ATC Replacement Project, which is a state and local contract opportunity issued by the Town of Nantucket, Massachusetts. The project involves the replacement of the existing Trane Tracer Summit BMS/ATC Control System with a new BACnet IP BMS/ATC Control System, as well as the integration of the new BMS/ATC Control System with an existing Alerton Control System located at 4 Fairgrounds Road, Nantucket, MA. The project is being undertaken in accordance with the drawings, specifications, and contract documents prepared by Garcia, Galuska & DeSousa, Inc.

The project manual does not provide specific details on pricing terms, set asides, incumbents, current environment, funding requirements and sources, or any other salient information. The document focuses on the technical aspects of the project, including the scope of work, project specifications, and related exhibits and addenda.

View the file

Other files

File Type Posted
DRAWINGS BMS-ATC Upgrade 4-01-21.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Manual and Specifications

NANTUCKET PUBLIC SAFETY

REPLACEMENT OF

BUILDING MANAGEMENT SYSTEM (BMS)

AND

AUTOMATIC TEMPERATURE CONTROLS (ATC)

4 Fairgrounds Road, Nantucket, MA

Issued for Bid

May 24, 2021

MAY 24, 2021 NANTUCKET PUBLIC SAFETY BUILDING

AUTOMATIC TEMPERATURE CONTROLS

Nantucket, MA

SECTION 00 01 10 – Page 1 of 1

TABLE OF CONTENTS

May 24, 2021 – Issued for Bid and Construction

PROJECT MANUAL AND SPECIFICATIONS

00 01 10 TABLE OF CONTENTS

00 01 15 LIST OF DRAWINGS

DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS

00 11 16 ADVERTISEMENT FOR BID

00 21 13 INSTRUCTIONS TO BIDDERS

00 41 13 FORM OF GENERAL BID

00 41 14 STATEMENT of NON-COLLUSION GENERAL

00 45 44 CERTIFICATE FOR CORPORATE SIGNATURE

00 45 48 TAX COMPLIANCE CERTIFICATIONS

00 50 00 STANDARD TOWN OF NANTUCKET CONTRACT

00 61 13 PAYMENT BOND

00 73 43.01 WAGE RATE SCHEDULES AND FEDERAL REGULATIONS

00 73 43.02 MASSACHUSETTS PREVAILING WAGE RATES

00 73 43.03 PREVAILING WAGE WEEKLY PAYROLL REPORT FORM

00 73 43.04 PAYROLL STATEMENT OF COMPLIANCE FORM

00 73 43.05 EXCERPTS FROM APPLICABLE STATE LAW

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY

01 26 00 CONTRACT MODIFICATION PROCEDURES

01 29 00 PAYMENT PROCEDURES

01 50 00 TEMPORARY FACILITIES

01 73 00 EXECUTION

01 77 00 PROJECT CLOSEOUT

DIVISION 23 – HEATING, VENTILATION AND AIR CONDITIONING

23 09 23 AUTOMATIC TEMPERATURE CONTROLS

SECTION 00 01 15 – Page 1 of 1

LIST OF DRAWINGS

LIST OF DRAWINGS

T1.0 TITLE SHEET

M0.1 LEGEND, ABBREVIATIONS AND GENERAL NOTES

MD1.0 EXISTING DDC COMMUNICATION RISER

M1.0 NEW DDC COMMUNICATION RISER

M2.0 AHU-1 CONTROL DIAGRAM AND SEQUENCE

M3.0 HRC-1 CONTROL DIAGRAM AND SEQUENCE

M4.0 EXISTING EQUIPMENT CONTROL DIAGRAMS AND SEQUENCES

M5.0 EXISTING ATC VALVE SCHEDULE

M6.0 EXISTING HV AC EQUIPMENT LOWER LEVEL

M7.0 EXISTING HV AC EQUIPMENT MAIN LEVEL

M8.0 EXISTING HV AC EQUIPMENT UPPER LEVEL

M9.0 EXISTING CEILING PLANS LOWER LEVEL

M10.0 EXISTING CEILING PLANS MAIN LEVEL

M11.0 EXISTING CEILING PLANS UPPER LEVEL

SECTION 00 11 16 – Page 1 of 1

ADVERTISEMENT FOR BID

TOWN OF NANTUCKET

INVITATION FOR BIDS

REPLACEMENT OF

BUILDING MANAGEMENT (BMS)

AND

AUTOMATIC TEMPERATURE CONTROLS (ATC)

The Town of Nantucket, Massachusetts, the Awarding Authority, invites sealed bids for the replacement of existing Trane Tracer Summit BMS/ATC Control System with a new BACnet IP

BMS/ATC Control System. Work also includes integration of the new BMS/ATC Control System with an existing Alerton Control System with related work located at 4 Fairgrounds Road, Nantucket, MA, in accordance with Drawings, Specifications and Contract Documents prepared by Garcia, Galuska & DeSousa, Inc, 375 Faunce Corner Road, Suite D, Dartmouth, MA 02747.

General Bidders may obtain complete sets of the Bidding Documents, including Bid Forms, online at https://www.nantucket-ma.gov/bids.aspx for a downloadable set of the Bidding Documents.

Addenda, if any, will be issued online. Any contract regarding this bid must be approved by the

Town of Nantucket and the Town reserves the right to reject any and all proposals if it is in its best interest to do so. Questions about the above may be directed to Maria Davis, Office Administrator, Nantucket Police Department, 4 Fairgrounds Road, Nantucket, MA 02554, 508-325-4100 x 5700, Monday – Friday, 8:00 am – 4:00 pm or at mdavis@police.nantucket-ma.gov.

A non-mandatory pre-bid meeting will be held at the project site at 4 Fairgrounds Road, Nantucket, MA, on Monday, June 7, 2021 at 11:00am.

Sealed bids will be received up to Thursday, June 10, 2021 at 1:59 p.m. at the Nantucket Police

Department, Attention: Ms. Maria Davis, Office Administrator, 4 Fairgrounds Road, Nantucket, MA 02554 until the time specified below at which time the bids will be publicly opened and read.

Bids will be opened at the above location, Thursday, June 10, 2021 at 2:00 p.m. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price.

All bids for this project are subject to applicable public bidding laws of Massachusetts, including, but not limited to G.L. c.30 §39M and c. 149 §44A-J & to minimum wage rates as required by

M.G.L. c. 149 §§26 to 27H inclusive.

Sealed bids shall be submitted on a form furnished by the Awarding Authority and clearly identified as a bid, endorsed with the name and address of the bidder, and the name of the project, and submitted to:

Ms. Maria Davis, Office Administrator

Nantucket Police Department

4 Fairgrounds Road

Nantucket, Massachusetts, 02554 https://www.nantucket-ma.gov/bids.aspx mailto:mdavis@police.nantucket-ma.gov

SECTION 00 21 13 – Page 1 of 6

INSTRUCTIONS TO BIDDERS

1. Receipt and Opening of Bids

The Town of Nantucket, Massachusetts, herein called the Owner, acting by and through its Town

Administration, will receive sealed Bids for the replacement of the BUILDING MANAGEMENT (BMS)

AND AUTOMATIC TEMPERATURE CONTROLS (ATC).

This Project is subject to M.G.L. c.30, § 39M and c.149, § 44A-44H, the provisions of which are incorporated herein by reference and shall control in the event of any conflict among these provisions and the provisions of the bid documents. It is the responsibility of every bidder to know the requirements of c.

30, § 39M and c.149, § 44A-44H.

All general bidders shall provide with their bids, a properly executed bid form, a 5% bid security, statement of non-collusion and a tax compliance certification.

General bids must be received no later than 1:59 pm prevailing time, on June 10, 2021, at which time said bids will be publicly opened and read. Bids must be submitted in a clearly marked envelope stating:

BUILDING MANAGEMENT (BMS) AND AUTOMATIC TEMPERATURE CONTROLS (ATC).

and RELATED WORK BID by the due date to:

Maria Davis, Office Administrator

Nantucket Police Department

4 Fairgrounds Road, Second Floor

Nantucket, Massachusetts 02554

2. Location and Work to be Done

The project consists of a building that houses the Fire Station and Police Station in one building. In 2019 the Fire Station was constructed and an Alterton Control System installed which includes an ACM Global

Controller. Within the Police Station (constructed 2010), there is currently a Trane Tracer Summit Control

System installed. The scope of work for this project includes this Trane Control System being removed in its entirety and replaced with a new BACNet IP Control System. The scope of work also includes integrated/tie-in to the existing Alerton Control System in the Fire Station. The design intent is to have both the Alerton Control System and the new BACNet IP Control System within the Police Station on one platform, controlled/viewed/monitored from one central location/workstation/platform. This single platform shall include all building graphics/floor plans and all related equipment/sensors/sequences/alarms, etc. The Building Management System (BMS) shall be completely open and shall be provided with Tridium

Niagara/JACE controllers for integration with existing Alerton Control System in the Fire Station. Provide a SEAMLESS integration/tie-in to the existing Alerton Control System and all existing equipment. The integration/tie-in shall include Direct Digital Control (BMS) historical data collection, archiving and alarm, energy and information management for all existing control points and graphics. The use of proprietary networks, communication protocols or ARCnet is prohibited.

The Contractor shall provide all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified.

SECTION 00 21 13 – Page 2 of 6

May 24, 2021 – Issued for Bid and Construction

The Work to be done and paid for under any item shall not be limited to the exact extent mentioned or described but shall include all incidental work necessary or customarily done for the completion of that item.

3. Pre-Bid Meeting

A non-mandatory pre-bid meeting will be held at the Project location at 4 Fairgrounds Road on Monday, June 7, 2021 at 11:00 AM. Attendance is not mandatory; however, the Contractor is not relieved of responsibility for being fully aware of all project conditions.

4. Preparation of Bid

Each bid must be submitted on the prescribed form. All blank spaces for bid prices must filled in, in both words and figures.

Each bid must be submitted as specified in Receipt and Opening of Bids, above.

5. Bid Opening Procedure

Bids shall be filed at the place and before the time specified in Receipt and Opening of Bids, above. Bid signatures will be checked.

All modifications to the bid documents will be issued via an addendum. All registered plan holders will be electronically notified when addenda are issued. Hard copies of the addenda will not be forwarded to the plan holders

The total dollar amount of each bid will be read, and the three apparent lowest bids will be selected for further consideration.

6. Bid Modification

Any bidder may withdraw or modify his bid, electronically, in a signed writing at any time prior to the scheduled closing time for receipt of bids, provided such writing is received prior to the bid closing time.

Bidders may not withdraw their bid after the bid opening except as may otherwise be expressly provided by law.

7. Ability and Experience of Bidder

No award will be made to any bidder who cannot satisfy the Owner that he has sufficient ability and experience in this class of work and sufficient capital and plant to enable him to prosecute and complete the work successfully within the time named. The Owner's decision or judgment on these matters will be final, conclusive, and binding.

The Owner may make such investigations as he deems necessary, and the bidder shall furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner may request.

SECTION 00 21 13 – Page 3 of 6

8. Conditions of Work

Each bidder must familiarize themselves fully with the conditions relating to the construction of the project and the employment of labor thereon. Failure to do so will not relieve a successful bidder of his obligation to furnish all material and labor necessary to carry out the provisions of his contract. Insofar as possible the Contractor, in carrying out his work, must employ such methods or means as will not cause any interruption of or interference with the work of any other Contractor.

9. Addenda and Interpretations

No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any bidder orally. All information given to bidders other than by means of the plans, specifications, or by addenda, as described below, is given informally and shall not be used as the basis of a claim against the

Owner.

Every request for such interpretation should be in writing addressed the attention of Charles Gibson, 4

Fairgrounds Road, Nantucket, MA 02554, or emailed at cgibson@police.Nantucket-MA.gov and to be given consideration must be received at least seven days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the specifications which, addenda will be made available for inspection online at https://www.nantucket-ma.gov/bids.aspx, not later than two days prior to the date fixed for the opening of bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. Hard copies of the addenda will not be forwarded to the plan holders. The bidder is solely responsible for reviewing all addenda posted on the project website. All addenda so issued shall become part of the Contract Documents.

10. Security for Faithful Performance

Simultaneously with his delivery of the executed Contract, the Contractor shall furnish a payment bond, in the amount of fifty (50%) of the contract amount as security for the payment of all persons performing labor and materials under this contract as specified in the GENERAL CONDITIONS included herein. The surety on such bond or bonds shall be a surety company qualified to do business under the laws of the

Commonwealth and satisfactory to the Owner. The bonds shall remain in force for one year after final acceptance of the work by the Owner, unless the Owner, in writing, releases the Contractor from the obligation sooner.

11. Power of Attorney

Attorneys-in-fact who sign Contract bonds must file with each bond a certified and effectively dated copy of their power of attorney.

12. Laws and Regulations

The bidder's attention is directed to the fact that all applicable State laws, municipal ordinances or Bylaws, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they will be deemed to be included in the Contract the same as though herein written out in full.

mailto:cgibson@police.Nantucket-MA.gov

SECTION 00 21 13 – Page 4 of 6

13. Liquidated Damages for Failure to Enter into Contract

Subject to, and except as otherwise may be provided by G.L.c.149. §§ 44B and 44E. the successful bidder, upon his failure or refusal to execute and deliver the Contract and bonds required within five (5) days

(Saturdays, Sundays and legal holidays excluded) after he/she has received notice of the acceptance of his/her bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, a portion of security deposited with his/her bid, but the amount forfeited shall not exceed the difference between his/her bid price and the bid price of the next lowest responsible and eligible bidder.

14. Obligation of Bidder

At the time of the opening of bids each bidder will be presumed to have inspected the site and to have read and to be thoroughly familiar with the Contract Documents (including all addenda). The failure or omission of any bidder to examine any form, instrument, or document shall in no way relieve any bidder from any obligation in respect of his bid.

15. Information Not Guaranteed

All information given in the Contract Documents relating to subsurface and other conditions, natural phenomena, existing pipes, and other structures is from the best sources at present available to the Owner.

All such information is furnished only for the information and convenience of bidders and is not guaranteed.

It is agreed and understood that the Owner does not warrant or guarantee that the subsurface or other conditions, natural phenomena, existing pipes, or other structures encountered during construction will be the same as those indicated in the Contract Documents.

It is further agreed and understood that no bidder or Contractor shall use or be entitled to use any of the information made available to him or obtained in any examination made by him in any manner as a basis of or ground for any claim or demand against the Owner or the Architect, arising from or by reason of any variance which may exist between the information made available and the actual subsurface or other structures actually encountered during the construction work, except as may otherwise be expressly provided for in the Contract Documents.

16. Bid Security

As stated in G.L.c.149. § 44B, each bid must be accompanied by a certified check, a bid bond, cash, a treasurer's or cashier's check, payable to Town of Nantucket, in the amount of 5% of the bid amount. Such checks will be returned to all except the three lowest responsible and eligible bidders within five days, Saturdays, Sundays, and legal holidays excluded, after the opening of bids, and the remaining checks will be returned promptly after the Owner and the accepted bidder have executed the Contract, or if no notice of intent to award has been presented to the selected contractor within 30 days, Saturdays, Sundays and holidays excluded, after the date of the opening of bids, upon demand of the bidder at any time thereafter.

In addition, as with the bid deposits of the general bidders, the Owner shall retain the bid deposits of the three lowest responsible and eligible sub-bidders for each sub-trade, as well as bid deposits of the sub-bidders named in the general bids of the three lowest responsible and eligible general bidders.

SECTION 00 21 13 – Page 5 of 6

17. Right to Reject Bid

The Owner reserves the right to waive any informalities in the bids, and to reject any and all bids, should the Owner deem it to be in the public interest to do so, and for any other reason as may be allowed by law.

The Owner may also reject bids which in its sole judgment are either incomplete, conditional, obscure or not responsive or which contain additions not called for, erasures not properly initialed, alterations, or similar irregularities, or the Owner may waive such omissions, conditions or irregularities.

18. Time for Completion

The successful Contractor shall commence work within ten (10) calendar days of the date of the Notice to

Proceed or, in the absence of such a notice, of the date of execution of a contract with the Town, and to fully complete the project within the time limit stated in the Contract Documents.

19. Comparison of Bids

Bids will be compared on the basis of the quantities and unit and lump sum prices set forth in the bid forms.

In the event that there is a discrepancy in FORM OF GENERAL BID between the lump sum or unit prices written in words and figures, the prices written in words will govern.

The Owner agrees to examine and consider each FORM OF GENERAL BID submitted in consideration of the qualifications of the bidder and the bidder's agreements, as hereinabove set forth and as set forth in

FORM OF GENERAL BID.

20. Award of Contract

The Contract will be awarded to "the lowest responsible and eligible bidder" pursuant to General Laws

Chapter 149, Section 44A(2), as amended. Such a bidder shall possess the skill, ability and integrity necessary for the faithful performance of the work, shall be able to furnish labor that can work in harmony with all other elements of labor employed, or to be employed, in the work, and shall otherwise comply with all applicable provisions of law, including satisfaction of the OSHA requirements as stated in the Form of

General Bid included herein and prescribed by G.L.c.149.§ 44E.

21. Statutes Regulating Competitive Bidding

Any bid which does not comply with the provisions of Massachusetts General Laws Chapter 149, Sections

44A through 44H, as amended, need not be accepted and the Owner may reject every such bid.

22. OSHA Training Requirement

Any person submitting a bid for, or signing a contract to work on any public works or public building project is to certify OSHA 10 compliance that all employees to be employed at the worksite shall have successfully completed a course in construction safety approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time that the employee begins work.

SECTION 00 21 13 – Page 6 of 6

23. Wage Rates

Prevailing Wage Rates as determined by the Commissioner of Department of Labor and Industries under the provision of the Massachusetts General Laws, Chapter 149, Section 26 to 27G, as amended, apply to this project.

State schedules of Prevailing wage rates are included in the Supplemental General Conditions section of the contract documents.

24. Contractor Records

The Contractor shall comply with the provisions of Massachusetts General Laws, Chapter 30, Section 39R and Chapter 149, Section 27B concerning Contractor records.

25. Insurance

The Contractor shall carry and continuously maintain until completion of the Contract, insurance as specified in the Contract Documents.

26. Contract

The successful general bidder and the sub-bidders included in such general bidder’s bid shall be required to execute the form of subcontract prescribed by G.L.c.149. § 44F.

SECTION 00 41 13 – Page 1 of 2

FORM OF GENERAL BID

FORM FOR GENERAL BID

NAME OF BIDDER: __________________________________________________________________

The Bidder, in compliance with the Advertisement for Bid for the supply and installation of the

“REPLACEMENT OF BUILDING MANAGEMENT (BMS) AND AUTOMATIC

TEMPERATURE CONTROLS (ATC).”, having examined the Drawings and Specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the project in accordance with the Contract

Documents within the time set forth below, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required under the Contract Documents, of which this proposal is a part.

To the Awarding Authority:

A. The undersigned proposes to furnish all labor and materials required for supply and installation of the Project entitled “REPLACEMENT OF BUILDING MANAGEMENT (BMS) AND

AUTOMATIC TEMPERATURE CONTROLS (ATC).”, 4 Fairgrounds Road, Nantucket, MA 02554, in accordance with the plans and specification, for the contract price specified below, subject to additions and deductions according to the terms of the specifications.

B. This General Bid includes Addenda numbered

C. The proposed contract price is __________________________________dollars ($___________).

D. The undersigned agrees that, if he is selected as General Contractor, he will within five days, Saturdays Sundays and legal holidays excluded, after presentation thereof by the Awarding

Authority execute a contract in accordance with the terms of this bid and furnish a performance bond and also a labor and materials or payment bond, each of a surety company qualified to do business under the laws of the Commonwealth and satisfactory to the Awarding Authority and each in the sum of the contract price, the premiums for which are to be paid by the General Contract and are included in the Contract price; provided, however, that if there is more than one surety company, the surety companies shall be jointly and severally liable.

The undersigned hereby certifies that he is able to furnish labor that can work in harmony with all other elements of labor employed or to be employed on the work; that all employees to be employed at the worksite will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll report for each employee; and that he will comply fully with all laws and regulations applicable to awards made subject to section

44A.

The undersigned further certifies under penalties of perjury that this bid is in all respects bona fide, fair and made without collusion or fraud with any other person. As used in this subsection, the work "person" shall mean any natural person joint venture, partnership, corporation or other business or legal entity.

SECTION 00 41 13 – Page 2 of 2

FORM OF GENERAL BID

The undersigned further certifies under penalties of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.

Date:

(Name of General Bidder)

BY:

(Signature and Title of Person Signing Bid)

(Business Address)

(City, State and Zip)

(Telephone No.)

SECTION 00 41 14 – Page 1 of 1

STATEMENT OF NON-COLLUSION GENERAL

STATEMENT OF NON-COLLUSION – GENERAL BIDDER

I, ________________________, _______________________, of ________________________________

(Name) (Title) (General Bidder)

Whose principal place of business is located at _________________________________________________

(Address) do hereby certify that:

1. The proposed bid price has been arrived at independently, without collusion, consultation communication as to any other contractor or with any competitor.

2. The said bid price was not disclosed by the Contractor and was not knowingly discussed prior to the submission, directly or indirectly, to any other contractor or to any competitor.

3. No attempt was made by the Contractor to induce any other person, partnership or corporation to submit or note to submit a proposal for the purpose of restricting competition.

4. This bid is in all respects bona fide, fair and made without collusion or fraud with any other person.

As used in this section the word "person" shall mean any natural person, joint venture, partnership, corporation, or other business or legal entity.

Signed under the pains of perjury this ______________ day of ___________________, 2021.

Name of General Bidder

By:

Title:

RETURN THIS FORM WITH YOUR BID RESPONSE

SECTION 00 45 44 – Page 1 of 1

CERTIFICATE BY CORP SIGN CONTRACT

CERTIFICATE BY CORPORATION TO SIGN CONTRACT

At a duly authorized meeting of the Board of Directors of the

_______________________________________ held on _______________________

(Name of Corporation) (Date) at which all the Directors were present or waived notice, it was voted that, (Name) (Officer) of this Company, be and he hereby is authorized to execute contracts and bonds in the name and behalf of said company, and affix its Corporate Seal thereto, and such execution of any Contract or obligation in this Company’s name on its behalf by such

_________________________________ under seal of the company, shall be

(Officer) valid and binding upon this Company.

A TRUE COPY,

ATTEST: __________________________________________

(Clerk)

PLACE OF BUSINESS _______________________________

DATE OF THIS CONTRACT _________________________

I hereby certify that I am the clerk of the ____________________________________

_____________________________ that ____________________________________ is the duly elected __________________________________________of said company, and the above vote has been amended or rescinded and remains in full force and effect as of the date of this Contract.

(Clerk) (Corporate Seal)

SECTION 00 45 48 – Page 1 of 1

TAX COMPLIANCE CERTIFICATION

TAX COMPLIANCE CERTIFICATION

Pursuant to M.G.L. Chapter 62C, Section 49A, I certify under the penalties of perjury that I have, to my best knowledge and belief, complied with the law of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.

Social Security Number or Signature of Individual or

Federal Identification Number Corporate Name

By: ________________________

Corporate Officer

(if applicable)

RETURN THIS FORM WITH YOUR BID RESPONSE

SECTION 00 50 00 – Page 1 of 14

DRAFT CONTRACT

May 24, 2021 – Issued for Bid

SECTION 00 50 00 – Page 2 of 14

SECTION 00 50 00 – Page 3 of 14

SECTION 00 50 00 – Page 4 of 14

SECTION 00 50 00 – Page 5 of 14

SECTION 00 50 00 – Page 6 of 14

SECTION 00 50 00 – Page 7 of 14

SECTION 00 50 00 – Page 8 of 14

SECTION 00 50 00 – Page 9 of 14

SECTION 00 50 00 – Page 10 of 14

SECTION 00 50 00 – Page 11 of 14

SECTION 00 50 00 – Page 12 of 14

SECTION 00 50 00 – Page 13 of 14

SECTION 00 50 00 – Page 14 of 14

SECTION 00 61 13 – Page 1 of 2

PAYMENT BOND

KNOW ALL MEN BY THESE PRESENTS: That we ___________________________________

________________________________ a___________________________________________

(Name of Contractor) (Corporation, Partnership, Joint Venture or Individual) hereinafter called "Principal" and ______________________________ of _________________, (Surety)

State of ________________________ hereinafter called the “Surety” and licensed by the State

(City and State)

Division of Insurance to do business under the laws of the Commonwealth of Massachusetts, are held and firmly bound to the Town of Nantucket, Massachusetts, hereinafter called "Owner", in the penal sum of ______________________________________ Dollars($___________________) in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION is such that Whereas, the Principal entered into a certain contract with the Owner, dated the ______________ day of __________________, 2021, a copy of which is hereto attached and made a part hereof for the construction described as follows:

NOW, THEREFORE, if the Principal shall promptly make payment to all persons, firms, subcontractors, and corporations furnishing materials for or performing labor in the prosecution of the work provided for in such contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, oil, gasoline, coal and coke, repairs on machinery, equipment and tools, consumed or used in connection with the construction of such work, and all insurance premiums on said work, and for all labor, performed in such work whether by subcontractor or otherwise, then this obligation shall be void; otherwise to remain in full force and effect.

PROVIDED, FURTHER, that the said Surety, for value received hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the contract or to the work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this bond, and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of this contract or to the work or to the specifications.

PROVIDED, FURTHER, that no final settlement between the Owner and the Contractor shall abridge the right of any beneficiary hereunder, whose claim may be unsatisfied.

SECTION 00 61 13 – Page 2 of 2

IN WITNESS WHEREOF, this instrument is executed in _________ ( ) counterparts, each one of which shall be deemed an original, this the _________ day of _____________________, 2021.

ATTEST:

Surety

______________________________ By ______________________________

(Attorney-in-Fact)

(Address-Zip Code)

______________________________ (SEAL)

Witness as to Surety

(Address-Zip Code)

NOTE: Date of Bond must not be prior to date of Contract. If Contractor is a Partnership, all partners should execute Bond.

SECTION 00 73 43.01 – Page 1 of 1

WAGE RATE SCHEDULES

WAGE RATE SCHEDULES

1.01 STATE WAGE RATES

A. The classifications and wage rates as established by the Commonwealth of Massachusetts

Department of Labor and Industries are hereby made a part of this Contract.

B. Wage rates included in the Contract Documents are minimum wage rates. Where State Wage

Rates and Federal Wage rates are at variance with each other, Contractor and subcontractors shall comply with the higher rate.

1.02 OSHA APPROVED SAFETY AND HEALTH TRAINING

A. Current Massachusetts law requires all employees who work on public construction sites must have no less than 10 hours of OSHA approved safety and health training.

1. The contractor and all subcontractors on this project will be required to provide certification of their compliance with this requirement with the first certified payroll report for each employee.

THE COMMONWEALTH OF MASSACHUSETTS

DEPARTMENT OF LABOR STANDARDS

As determined by the Director under the provisions of the

Massachusetts General Laws, Chapter 149, Sections 26 to 27H

EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT

Prevailing Wage Rates

CHARLES D. BAKER ROSALIN ACOSTA

SecretaryGovernor

MICHAEL FLANAGAN

Replace existing building management System (BMS) and Automatic Temperature Controls (ATC) consisting of a complete Direct Digital Controls System for Nantucket Public Safety Building.

Director

Awarding Authority: Town of Nantucket

City/Town:Contract Number: NANTUCKET

Description of Work:

Job Location: 4 Fairgrounds Rd

Information about Prevailing Wage Schedules for Awarding Authorities and Contractors

• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the

“Wage Request Number” on all pages of this schedule.

• An Awarding Authority must request an updated wage schedule from the Department of Labor Standards (“DLS”) if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects

(bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.

• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or any sub-contractor.

• All apprentices working on the project are required to be registered with the Massachusetts Department of Labor

Standards, Division of Apprentice Standards (DLS/DAS). Apprentice must keep his/her apprentice identification card on his/her person during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DLS/DAS regardless of whether or not they are registered with any other federal, state, local, or private agency must be paid the journeyworker's rate for the trade.

• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule.

Awarding authorities are required to request these updates no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. Contractors are required to obtain the wage schedules from awarding authorities, and to pay no less than these rates to covered workers. The annual update requirement is not applicable to 27F “rental of equipment” contracts.

• Every contractor or subcontractor which performs construction work on the project is required to submit weekly payroll reports and a Statement of Compliance directly to the awarding authority by mail or email and keep them on file for three years.

Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. A sample of a payroll reporting form may be obtained at http://www.mass.gov/dols/pw.

• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953.

• Employees not receiving the prevailing wage rate set forth on the wage schedule may report the violation to the Fair Labor

Division of the office of the Attorney General at (617) 727-3465.

• Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.

KARYN E. POLITO

Lt. Governor

Classification Total RateBase Wage Health Pension Supplemental

Unemployment Effective Date

Construction

(2 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

$62.88 12/01/2020 $12.91 $0.00 $35.15 $14.82

$63.68 06/01/2021 $12.91 $0.00 $35.95 $14.82

$64.18 08/01/2021 $13.41 $0.00 $35.95 $14.82

$65.37 12/01/2021 $13.41 $0.00 $35.95 $16.01

(3 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

$62.95 12/01/2020 $12.91 $0.00 $35.22 $14.82

$63.75 06/01/2021 $12.91 $0.00 $36.02 $14.82

$64.25 08/01/2021 $13.41 $0.00 $36.02 $14.82

$65.44 12/01/2021 $13.41 $0.00 $36.02 $16.01

(4 & 5 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

$63.07 12/01/2020 $12.91 $0.00 $35.34 $14.82

$63.87 06/01/2021 $12.91 $0.00 $36.14 $14.82

$64.37 08/01/2021 $13.41 $0.00 $36.14 $14.82

$65.56 12/01/2021 $13.41 $0.00 $36.14 $16.01

ADS/SUBMERSIBLE PILOT

PILE DRIVER LOCAL 56 (ZONE 1)

$135.57 08/01/2020 $9.40 $0.00 $103.05 $23.12

For apprentice rates see "Apprentice- PILE DRIVER"

AIR TRACK OPERATOR

LABORERS - ZONE 2

$60.07 12/01/2020 $8.60 $0.00 $35.41 $16.06

$60.99 06/01/2021 $8.60 $0.00 $36.33 $16.06

$61.90 12/01/2021 $8.60 $0.00 $37.24 $16.06

$62.80 06/01/2022 $8.60 $0.00 $38.14 $16.06

$63.65 12/01/2022 $8.60 $0.00 $38.99 $16.06

$64.55 06/01/2023 $8.60 $0.00 $39.89 $16.06

$65.45 12/01/2023 $8.60 $0.00 $40.79 $16.06 For apprentice rates see "Apprentice- LABORER"

AIR TRACK OPERATOR (HEAVY & HIGHWAY)

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

$60.07 12/01/2020 $8.60 $0.00 $35.41 $16.06

$60.99 06/01/2021 $8.60 $0.00 $36.33 $16.06

$61.90 12/01/2021 $8.60 $0.00 $37.24 $16.06 For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

ASBESTOS WORKER (PIPES & TANKS)

HEAT & FROST INSULATORS LOCAL 6 (SOUTHERN MASS)

$60.35 12/01/2020 $12.80 $0.00 $38.10 $9.45

ASPHALT RAKER

LABORERS - ZONE 2

$59.57 12/01/2020 $8.60 $0.00 $34.91 $16.06

$60.49 06/01/2021 $8.60 $0.00 $35.83 $16.06

$61.40 12/01/2021 $8.60 $0.00 $36.74 $16.06

$62.30 06/01/2022 $8.60 $0.00 $37.64 $16.06

$63.15 12/01/2022 $8.60 $0.00 $38.49 $16.06

$64.05 06/01/2023 $8.60 $0.00 $39.39 $16.06

$64.95 12/01/2023 $8.60 $0.00 $40.29 $16.06 For apprentice rates see "Apprentice- LABORER"

ASPHALT RAKER (HEAVY & HIGHWAY)

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

$59.57 12/01/2020 $8.60 $0.00 $34.91 $16.06

$60.49 06/01/2021 $8.60 $0.00 $35.83 $16.06

$61.40 12/01/2021 $8.60 $0.00 $36.74 $16.06 For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE

OPERATING ENGINEERS LOCAL 4

$79.18 12/01/2020 $13.50 $0.00 $49.98 $15.70

$80.28 06/01/2021 $13.50 $0.00 $51.08 $15.70

$81.43 12/01/2021 $13.50 $0.00 $52.23 $15.70 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

Issue Date: Wage Request Number:03/26/2021 Page 2 of 3320210326-013

Unemployment Effective Date

BACKHOE/FRONT-END LOADER

OPERATING ENGINEERS LOCAL 4

$79.18 12/01/2020 $13.50 $0.00 $49.98 $15.70

$80.28 06/01/2021 $13.50 $0.00 $51.08 $15.70

$81.43 12/01/2021 $13.50 $0.00 $52.23 $15.70 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

BARCO-TYPE JUMPING TAMPER

LABORERS - ZONE 2

$59.57 12/01/2020 $8.60 $0.00 $34.91 $16.06

$60.49 06/01/2021 $8.60 $0.00 $35.83 $16.06

$61.40 12/01/2021 $8.60 $0.00 $36.74 $16.06

$62.30 06/01/2022 $8.60 $0.00 $37.64 $16.06

$63.15 12/01/2022 $8.60 $0.00 $38.49 $16.06

$64.05 06/01/2023 $8.60 $0.00 $39.39 $16.06

$64.95 12/01/2023 $8.60 $0.00 $40.29 $16.06 For apprentice rates see "Apprentice- LABORER"

BLOCK PAVER, RAMMER / CURB SETTER

LABORERS - ZONE 2

$60.07 12/01/2020 $8.60 $0.00 $35.41 $16.06

$60.99 06/01/2021 $8.60 $0.00 $36.33 $16.06

$61.90 12/01/2021 $8.60 $0.00 $37.24 $16.06

$62.80 06/01/2022 $8.60 $0.00 $38.14 $16.06

$63.65 12/01/2022 $8.60 $0.00 $38.99 $16.06

$64.55 06/01/2023 $8.60 $0.00 $39.89 $16.06

$65.45 12/01/2023 $8.60 $0.00 $40.79 $16.06 For apprentice rates see "Apprentice- LABORER"

BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &

HIGHWAY)

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

$60.07 12/01/2020 $8.60 $0.00 $35.41 $16.06

$60.99 06/01/2021 $8.60 $0.00 $36.33 $16.06

$61.90 12/01/2021 $8.60 $0.00 $37.24 $16.06 For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

BOILER MAKER

BOILERMAKERS LOCAL 29

$71.15 01/01/2020 $7.07 $0.00 $46.10 $17.98

BOILERMAKER - Local 29Apprentice -

01/01/2020

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $29.97 $7.07 $11.69 $0.00 $48.73 65

2 $29.97 $7.07 $11.69 $0.00 $48.73 65

3 $32.27 $7.07 $12.59 $0.00 $51.93 70

4 $34.58 $7.07 $13.49 $0.00 $55.14 75

5 $36.88 $7.07 $14.38 $0.00 $58.33 80

6 $39.19 $7.07 $15.29 $0.00 $61.55 85

7 $41.49 $7.07 $16.18 $0.00 $64.74 90

8 $43.80 $7.07 $17.09 $0.00 $67.96 95

Notes:

Apprentice to Journeyworker Ratio:1:4

BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY

WATERPROOFING)

BRICKLAYERS LOCAL 3 (NEW BEDFORD)

$89.23 02/01/2021 $11.39 $0.00 $55.75 $22.09

$90.79 08/01/2021 $11.39 $0.00 $57.15 $22.25

$91.38 02/01/2022 $11.39 $0.00 $57.74 $22.25

Issue Date: Wage Request Number:03/26/2021 Page 3 of 3320210326-013

Unemployment Effective Date

BRICK/PLASTER/CEMENT MASON - Local 3 New BedfordApprentice -

02/01/2021

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $27.88 $11.39 $22.09 $0.00 $61.36 50

2 $33.45 $11.39 $22.09 $0.00 $66.93 60

3 $39.03 $11.39 $22.09 $0.00 $72.51 70

4 $44.60 $11.39 $22.09 $0.00 $78.08 80

5 $50.18 $11.39 $22.09 $0.00 $83.66 90

08/01/2021

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $28.58 $11.39 $22.25 $0.00 $62.22 50

2 $34.29 $11.39 $22.25 $0.00 $67.93 60

3 $40.01 $11.39 $22.25 $0.00 $73.65 70

4 $45.72 $11.39 $22.25 $0.00 $79.36 80

5 $51.44 $11.39 $22.25 $0.00 $85.08 90

Apprentice to Journeyworker Ratio:1:5

BULLDOZER/GRADER/SCRAPER

OPERATING ENGINEERS LOCAL 4

$78.65 12/01/2020 $13.50 $0.00 $49.45 $15.70

$79.74 06/01/2021 $13.50 $0.00 $50.54 $15.70

$80.88 12/01/2021 $13.50 $0.00 $51.68 $15.70 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

CAISSON & UNDERPINNING BOTTOM MAN

LABORERS - FOUNDATION AND MARINE

$67.12 12/01/2020 $8.60 $0.00 $41.05 $17.47

$68.14 06/01/2021 $8.60 $0.00 $42.07 $17.47

$69.15 12/01/2021 $8.60 $0.00 $43.08 $17.47 For apprentice rates see "Apprentice- LABORER"

CAISSON & UNDERPINNING LABORER

LABORERS - FOUNDATION AND MARINE

$65.97 12/01/2020 $8.60 $0.00 $39.90 $17.47

$66.99 06/01/2021 $8.60 $0.00 $40.92 $17.47

$68.00 12/01/2021 $8.60 $0.00 $41.93 $17.47 For apprentice rates see "Apprentice- LABORER"

CAISSON & UNDERPINNING TOP MAN

LABORERS - FOUNDATION AND MARINE

$65.97 12/01/2020 $8.60 $0.00 $39.90 $17.47

$66.99 06/01/2021 $8.60 $0.00 $40.92 $17.47

$68.00 12/01/2021 $8.60 $0.00 $41.93 $17.47 For apprentice rates see "Apprentice- LABORER"

CARBIDE CORE DRILL OPERATOR

LABORERS - ZONE 2

$59.57 12/01/2020 $8.60 $0.00 $34.91 $16.06

$60.49 06/01/2021 $8.60 $0.00 $35.83 $16.06

$61.40 12/01/2021 $8.60 $0.00 $36.74 $16.06

$62.30 06/01/2022 $8.60 $0.00 $37.64 $16.06

$63.15 12/01/2022 $8.60 $0.00 $38.49 $16.06

$64.05 06/01/2023 $8.60 $0.00 $39.39 $16.06

$64.95 12/01/2023 $8.60 $0.00 $40.29 $16.06 For apprentice rates see "Apprentice- LABORER"

Issue Date: Wage Request Number:03/26/2021 Page 4 of 3320210326-013

Unemployment Effective Date

CARPENTER

CARPENTERS -ZONE 1 (Metro Boston)

$80.73 03/01/2021 $9.40 $0.00 $52.38 $18.95

$81.63 09/01/2021 $9.40 $0.00 $53.28 $18.95

$82.48 03/01/2022 $9.40 $0.00 $54.13 $18.95

$83.38 09/01/2022 $9.40 $0.00 $55.03 $18.95

$84.23 03/01/2023 $9.40 $0.00 $55.88 $18.95

CARPENTER - Zone 1 Metro BostonApprentice -

03/01/2021

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $26.19 $9.40 $1.73 $0.00 $37.32 50

2 $31.43 $9.40 $1.73 $0.00 $42.56 60

3 $36.67 $9.40 $13.76 $0.00 $59.83 70

4 $39.29 $9.40 $13.76 $0.00 $62.45 75

5 $41.90 $9.40 $15.49 $0.00 $66.79 80

6 $41.90 $9.40 $15.49 $0.00 $66.79 80

7 $47.14 $9.40 $17.22 $0.00 $73.76 90

8 $47.14 $9.40 $17.22 $0.00 $73.76 90

09/01/2021

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $26.64 $9.40 $1.73 $0.00 $37.77 50

2 $31.97 $9.40 $1.73 $0.00 $43.10 60

3 $37.30 $9.40 $13.76 $0.00 $60.46 70

4 $39.96 $9.40 $13.76 $0.00 $63.12 75

5 $42.62 $9.40 $15.49 $0.00 $67.51 80

6 $42.62 $9.40 $15.49 $0.00 $67.51 80

7 $47.95 $9.40 $17.22 $0.00 $74.57 90

8 $47.95 $9.40 $17.22 $0.00 $74.57 90

Notes:

% Indentured After 10/1/17; 45/45/55/55/70/70/80/80

Step 1&2 $34.70/ 3&4 $41.61/ 5&6 $61.56/ 7&8 $68.52

Apprentice to Journeyworker Ratio:1:5

CARPENTER WOOD FRAME

CARPENTERS-ZONE 3 (Wood Frame)

$34.67 04/01/2020 $7.21 $0.00 $22.66 $4.80

$35.17 04/01/2021 $7.21 $0.00 $23.16 $4.80

$35.67 04/01/2022 $7.21 $0.00 $23.66 $4.80

$36.17 04/01/2023 $7.21 $0.00 $24.16 $4.80 All Aspects of New Wood Frame Work

Issue Date: Wage Request Number:03/26/2021 Page 5 of 3320210326-013

Unemployment Effective Date

CARPENTER (Wood Frame) - Zone 3Apprentice -

04/01/2020

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $13.60 $7.21 $0.00 $0.00 $20.81 60

2 $13.60 $7.21 $0.00 $0.00 $20.81 60

3 $14.73 $7.21 $0.00 $0.00 $21.94 65

4 $15.86 $7.21 $0.00 $0.00 $23.07 70

5 $17.00 $7.21 $3.80 $0.00 $28.01 75

6 $18.13 $7.21 $3.80 $0.00 $29.14 80

7 $19.26 $7.21 $3.80 $0.00 $30.27 85

8 $20.39 $7.21 $3.80 $0.00 $31.40 90

04/01/2021

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $13.90 $7.21 $0.00 $0.00 $21.11 60

2 $13.90 $7.21 $0.00 $0.00 $21.11 60

3 $15.05 $7.21 $0.00 $0.00 $22.26 65

4 $16.21 $7.21 $0.00 $0.00 $23.42 70

5 $17.37 $7.21 $3.80 $0.00 $28.38 75

6 $18.53 $7.21 $3.80 $0.00 $29.54 80

7 $19.69 $7.21 $3.80 $0.00 $30.70 85

8 $20.84 $7.21 $3.80 $0.00 $31.85 90

Notes:

% Indentured After 10/1/17; 45/45/55/55/70/70/80/80

Step 1&2 $17.41/ 3&4 $19.67/ 5&6 $26.87/ 7&8 $29.14

Apprentice to Journeyworker Ratio:1:5

CEMENT MASONRY/PLASTERING

BRICKLAYERS LOCAL 3 (NEW BEDFORD)

$84.85 01/01/2020 $12.75 $0.62 $49.07 $22.41

CEMENT MASONRY/PLASTERING - Eastern Mass (New Bedford)Apprentice -

01/01/2020

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $24.54 $12.75 $15.41 $0.00 $52.70 50

2 $29.44 $12.75 $17.41 $0.62 $60.22 60

3 $31.90 $12.75 $18.41 $0.62 $63.68 65

4 $34.35 $12.75 $19.41 $0.62 $67.13 70

5 $36.80 $12.75 $20.41 $0.62 $70.58 75

6 $39.26 $12.75 $21.41 $0.62 $74.04 80

7 $44.16 $12.75 $22.41 $0.62 $79.94 90

Steps 3,4 are 500 hrs. All other steps are 1,000 hrs.

Apprentice to Journeyworker Ratio:1:3

Issue Date: Wage Request Number:03/26/2021 Page 6 of 3320210326-013

Unemployment Effective Date

CHAIN SAW OPERATOR

LABORERS - ZONE 2

$59.57 12/01/2020 $8.60 $0.00 $34.91 $16.06

$60.49 06/01/2021 $8.60 $0.00 $35.83 $16.06

$61.40 12/01/2021 $8.60 $0.00 $36.74 $16.06

$62.30 06/01/2022 $8.60 $0.00 $37.64 $16.06

$63.15 12/01/2022 $8.60 $0.00 $38.49 $16.06

$64.05 06/01/2023 $8.60 $0.00 $39.39 $16.06

$64.95 12/01/2023 $8.60 $0.00 $40.29 $16.06 For apprentice rates see "Apprentice- LABORER"

CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES

OPERATING ENGINEERS LOCAL 4

$80.18 12/01/2020 $13.50 $0.00 $50.98 $15.70

$81.28 06/01/2021 $13.50 $0.00 $52.08 $15.70

$82.43 12/01/2021 $13.50 $0.00 $53.23 $15.70 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

COMPRESSOR OPERATOR

OPERATING ENGINEERS LOCAL 4

$62.20 12/01/2020 $13.50 $0.00 $33.00 $15.70

$62.95 06/01/2021 $13.50 $0.00 $33.75 $15.70

$63.74 12/01/2021 $13.50 $0.00 $34.54 $15.70 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

DELEADER (BRIDGE)

PAINTERS LOCAL 35 - ZONE 2

$83.06 01/01/2021 $8.25 $0.00 $52.06 $22.75

PAINTER Local 35 - BRIDGES/TANKSApprentice -

01/01/2021

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $26.03 $8.25 $0.00 $0.00 $34.28 50

2 $28.63 $8.25 $6.16 $0.00 $43.04 55

3 $31.24 $8.25 $6.72 $0.00 $46.21 60

4 $33.84 $8.25 $7.28 $0.00 $49.37 65

5 $36.44 $8.25 $19.39 $0.00 $64.08 70

6 $39.05 $8.25 $19.95 $0.00 $67.25 75

7 $41.65 $8.25 $20.51 $0.00 $70.41 80

8 $46.85 $8.25 $21.63 $0.00 $76.73 90

Steps are 750 hrs.

Apprentice to Journeyworker Ratio:1:1

DEMO: ADZEMAN

LABORERS - ZONE 2

$65.97 12/01/2020 $8.60 $0.00 $40.05 $17.32

$66.99 06/01/2021 $8.60 $0.00 $41.07 $17.32

$68.00 12/01/2021 $8.60 $0.00 $42.08 $17.32

$69.00 06/01/2022 $8.60 $0.00 $43.08 $17.32

$70.00 12/01/2022 $8.60 $0.00 $44.08 $17.32

$71.00 06/01/2023 $8.60 $0.00 $45.08 $17.32

$72.25 12/01/2023 $8.60 $0.00 $46.33 $17.32

Issue Date: Wage Request Number:03/26/2021 Page 7 of 3320210326-013

Unemployment Effective Date

DEMO: BACKHOE/LOADER/HAMMER OPERATOR

LABORERS - ZONE 2

$66.97 12/01/2020 $8.60 $0.00 $41.05 $17.32

$67.99 06/01/2021 $8.60 $0.00 $42.07 $17.32

$69.00 12/01/2021 $8.60 $0.00 $43.08 $17.32

$70.00 06/01/2022 $8.60 $0.00 $44.08 $17.32

$71.00 12/01/2022 $8.60 $0.00 $45.08 $17.32

$72.00 06/01/2023 $8.60 $0.00 $46.08 $17.32

$73.25 12/01/2023 $8.60 $0.00 $47.33 $17.32 For apprentice rates see "Apprentice- LABORER"

DEMO: BURNERS

LABORERS - ZONE 2

$66.72 12/01/2020 $8.60 $0.00 $40.80 $17.32

$67.74 06/01/2021 $8.60 $0.00 $41.82 $17.32

$68.75 12/01/2021 $8.60 $0.00 $42.83 $17.32

$69.75 06/01/2022 $8.60 $0.00 $43.83 $17.32

$70.75 12/01/2022 $8.60 $0.00 $44.83 $17.32

$71.75 06/01/2023 $8.60 $0.00 $45.83 $17.32

$73.00 12/01/2023 $8.60 $0.00 $47.08 $17.32 For apprentice rates see "Apprentice- LABORER"

DEMO: CONCRETE CUTTER/SAWYER

LABORERS - ZONE 2

$66.97 12/01/2020 $8.60 $0.00 $41.05 $17.32

$67.99 06/01/2021 $8.60 $0.00 $42.07 $17.32

$69.00 12/01/2021 $8.60 $0.00 $43.08 $17.32

$70.00 06/01/2022 $8.60 $0.00 $44.08 $17.32

$71.00 12/01/2022 $8.60 $0.00 $45.08 $17.32

$72.00 06/01/2023 $8.60 $0.00 $46.08 $17.32

$73.25 12/01/2023 $8.60 $0.00 $47.33 $17.32 For apprentice rates see "Apprentice- LABORER"

DEMO: JACKHAMMER OPERATOR

LABORERS - ZONE 2

$66.72 12/01/2020 $8.60 $0.00 $40.80 $17.32

$67.74 06/01/2021 $8.60 $0.00 $41.82 $17.32

$68.75 12/01/2021 $8.60 $0.00 $42.83 $17.32

$69.75 06/01/2022 $8.60 $0.00 $43.83 $17.32

$70.75 12/01/2022 $8.60 $0.00 $44.83 $17.32

$71.75 06/01/2023 $8.60 $0.00 $45.83 $17.32

$73.00 12/01/2023 $8.60 $0.00 $47.08 $17.32 For apprentice rates see "Apprentice- LABORER"

DEMO: WRECKING LABORER

LABORERS - ZONE 2

$65.97 12/01/2020 $8.60 $0.00 $40.05 $17.32

$66.99 06/01/2021 $8.60 $0.00 $41.07 $17.32

$68.00 12/01/2021 $8.60 $0.00 $42.08 $17.32

$69.00 06/01/2022 $8.60 $0.00 $43.08 $17.32

$70.00 12/01/2022 $8.60 $0.00 $44.08 $17.32

$71.00 06/01/2023 $8.60 $0.00 $45.08 $17.32

$72.25 12/01/2023 $8.60 $0.00 $46.33…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .