Justification and Approval For Other than Full and Open Competition Unusual and Compelling Urgency
1: Contracting Agency:
Tooele Army Depot
Contracting CCRC-IDT
Bldg. 501
Tooele, UT 84074-5003
2: Description of Action:
This action is to obtain and execute cleanup and remediation services for production building 1400 which had an accidental discharge of dry chemical fire suppressant. As this building is involved in production activity it is imperative that the clean up occur in a timely manner to get the building available for production.
3: Description of Supplies/Services
The entire production facility is affected with a coating of the dry chemical. This contract action involves the collection of the dry chemical residue; containment of the dust generated, and where appropriate washes down of surfaces and equipment. The services of companies capable of containment staffed with experienced personnel and equipped with appropriate materials for collection and containment is sought.
4: Authority Cited:
FAR 6.302-2: Unusual and Compelling; Citation: 10 W.S.C. 2304(c)(2 5: Identification of Justification Rationale:
The government did pursue this action consistent with 6.302-2(c)(2); agencies shall request offers from as many potential sources as is practicable under the circumstances. Contact was made with several sources from the immediate geographic area. These contacts were made by telephone and electronic mail. The immediate geographic area is appropriate due to rapid response required, equipment and staff availability, and potential licensing issues. Three vendors did make site visits and provided proposal input within 48 hours.
6: Determination of Best Value:
Three competing proposals were received. The proposals were evaluated on least cost technically acceptable consideration. The final cost is within the funding parameters approved.
7: Market Research Conducted:
Market research involved local source avenues; company listings, internet search and recommendations from area fire suppressant equipment and servicing agencies. Initial telephone conversations concerning the materials involved, the building content, and materials involved in the production operation did narrow the field of competitors some. There was intent to utilize the services of a small business. This was investigated through CCR searches by NAICS and verbally with the companies contacted.
8: Other Factors / Contributors:
NA
9: Actions to Remove Barriers to Competition Prior to Subsequent Acquisition:
Competition was sought and accessed under the circumstance and urgency of the production condition. Had the situation not required comparatively immediate action the acquisition would have been synopsized according to FAR 5.101(a)(1).
10: Fair & Reasonable Cost Determination:
Items 6 and 7 address this consideration.
11: Reference to Supporting Technical Representations:
The government’s technical representatives from life and fire safety, environmental department staffing, the facilities maintenance group and operational personnel were consulted in the pursuit of clean up, remediation and recharging parameters for the facility.
I hereby certify that this justification and approval is accurate and complete to the best of my knowledge and belief.
Dated: 8 March 2012 Gene DeLeeuw
Purchasing Agent Approval
Based on the forgoing Justification, the acquisition of cleanup and remediation services with the consideration of urgent and compelling conditions is approved.
Dated:
Brenda Alverson
Contracting Officer