This file contains detailed mechanical, electrical and plumbing (MEP) as-built drawings for Building 12, a 60-bed nursing home care unit at the VAMC facility in Spokane, WA. The drawings include electrical site plans, lighting plans, power & systems plans, HVAC plans, plumbing plans, and various system diagrams and details. Specific components shown include duct line details, transformer pad details, telephone and fire alarm riser diagrams, hydronic heating flow diagrams, chilled water systems, solar hot water systems, and waste/vent riser diagrams. The drawings were prepared by Campbell Engineers Inc. (structural), Thomas J. Gerard and Associates (mechanical), Watkins/Cook Associates (electrical), and other engineering firms under contract with Aral/Jackson Architects and Designers.

The drawings appear to be complete construction documents that would be used for building operations and maintenance or future modifications. They contain extensive technical details about building systems including electrical distribution, lighting controls, HVAC equipment, plumbing fixtures, and mechanical rooms. The level of detail suggests these are the final as-built drawings documenting how the building was actually constructed, rather than design or bid documents.

View the file

Other files

File Type Posted
Design Review Comment Form.xlsx XLSX spreadsheet
AE SOW 668-25-102 - Copy.docx DOCX document
Presolicitation Notice Request for SF 330s.pdf PDF
2020 GAO High Quality Project Estimate Characteristics.xlsx XLSX spreadsheet
PPQ 668-25-102.docx DOCX document
Bldg 12 As-Built ARCH-STR.pdf PDF
Site Repair Replace Areas Rev 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHASPOPARSOB

Pencil

VHASPOPARSOB

Pencil

VHASPOPARSOB

Pencil

VHASPOPARSOB

Pencil

VHASPOPARSOB

Pencil

VHASPOPARSOB

Pencil

E-1
E-2
E-3
E-4
E-5
E-6
E-7
E-8
E-9
E-10
E-11
E-12
H-1
H-2
H-3
H-4
H-5
H-6
H-7
H-8
H-9
H-10
H-11
H-12
H-13
H-14 mechanical room plan
H-15 solar hot water
P-1
P-2
P-3
P-4
P-5

File details come from the government source that posted it. Updated .