Blank Price Schedule_CGC ESCANABA FY26 DS.xls
XLS spreadsheet 44 KB Posted
- Attached to
- USCGC ESCANABA Dockside Repairs FY2026
- Solicitation number
- 70Z08026QMECP0005
About this file
This is a Price Schedule for the USCGC ESCANABA (WMEC-270B) Dockside Availability in FY2026, issued by the US Coast Guard. The document outlines a comprehensive list of 27 definite and 5 optional maintenance and repair tasks, including tank cleaning and inspection, equipment servicing, preservation, and renewal of various ship components. The pricing schedule shows each task as a job with a quantity of 1, currently listed at $0.00, suggesting the final pricing will be negotiated or filled in by the contractor.
The document includes provisions for potential Over and Above/Growth Work, with a labor rate and material markup/handling fee section. The solicitation (70Z08026QMECP0005) is for dockside repairs on the USCGC ESCANABA, with the point of contact being Chelsea Clark from the US Coast Guard. The price schedule provides a template for contractors to detail their proposed costs for specific ship maintenance activities, with space to fill in unit prices and calculate total project costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC ESCANABA (WMEC-270B) DOCKSIDE AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Chain Lockers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-002 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | 1 | $0.00 | |
| D-003 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Tanks, Potable Water, Clean and Inspect | JOB | 1 | $0.00 | |
| D-005 | Tanks, Ballast, Clean and Inspect | JOB | 1 | $0.00 | |
| D-006 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | 1 | $0.00 | |
| D-007 | Propulsion Shafting, Strain Gauge Alignment, Dockside, Check | JOB | 1 | $0.00 | |
| D-008 | Vent Ducts, Engine Room, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-009 | Vent Ducts, Galley, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-010 | Vent Ducts, Laundry Exhaust, Commercial Cleaning | JOB | 1 | $0.00 | |
| D-011 | Commissary Hoist, Inspect and Service | JOB | 1 | $0.00 | |
| D-012 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-013 | Anchor Windlass, Overhaul | JOB | 1 | $0.00 | |
| D-014 | Towing Bitts, Chocks, and Fairleads; Inspect and Test | JOB | 1 | $0.00 | |
| D-015 | Warping Capstan, Overhaul | JOB | 1 | $0.00 | |
| O-016 | Tanks, Ballast, Preserve, Partial (OPTIONAL) | JOB | 1 | $0.00 | |
| O-017 | Tanks, MP Fuel Service, Preserve, Partial (OPTIONAL) | JOB | 1 | $0.00 | |
| O-018 | Tanks, MP Fuel Storage and Overflow, Preserve, Partial (OPTIONAL) | JOB | 1 | $0.00 | |
| D-019 | Exhaust Piping, Renew | JOB | 1 | $0.00 | |
| D-020 | Ventilation Ducting, Renew | JOB | 1 | $0.00 | |
| D-021 | Engine Room Fan Controllers, Renew | JOB | 1 | $0.00 | |
| D-022 | Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect | JOB | 1 | $0.00 | |
| D-023 | Chain Locker, Preserve, 100 Percent | JOB | 1 | $0.00 | |
| O-024 | Tanks, Dirty Oil and Waste, Preserve, Partial (OPTIONAL) | JOB | 1 | $0.00 | |
| O-025 | Tanks, Potable Water, Preserve, Partial (OPTIONAL) | JOB | 1 | $0.00 | |
| D-026 | CPP Storage Tank Components, Renew | JOB | 1 | $0.00 | |
| D-027 | Circuit Breakers (400 HZ), Inspect and Test | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | JOB | |||
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | |||||
| Over and Above/Growth Work | |||||
| The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| **Fill in the sections highlighted below: | |||||
| OA/G-001 | Over and Above/Growth Labor Rate | Hour | 1,107 | $0.00 | |
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $42,698.00 | Percent | $0.00 | |
| Total Evaluated Price of Over and Above/Growth | $0.00 |
&C(9/30/2025) Draft-2 - Page &P of &N
File details come from the government source that posted it. Updated .