BL115_23 Award Notice.pdf
PDF 197 KB Posted
- Solicitation number
- PE-77023-NONST-2023-000000012
- Issued by
- Gwinnett County, Georgia
About this file
This document is a Bid Tabulation for the BL115-23 Little Suwanee Creek Gravity Sewer and Force Main Project, issued by the Department of Water Resources. The project involves the installation of sanitary sewer pipelines, manholes, and associated infrastructure. The bid tabulation includes 41 line items with approximate quantities and unit pricing from two bidders, JDS, Inc. and Site Engineering, Inc. The project was divided into two parts, with Part 1 containing the unit price items and Part 2 containing the owner-directed items. The recommended vendor is JDS, Inc. with a total bid price of $6,759,614.00.
The bid tabulation provides detailed pricing information for the various components of the project, including asphalt pavement resurfacing, driveway and sidewalk restoration, steel casing installation, seeding and sodding, erosion and sediment controls, and the installation of sanitary sewer piping and manholes. The project also includes several supplemental items, such as rock removal, wetlands and stream restoration, and gravel roadway repair. The bid documents do not provide information about any set-asides, incumbent contractors, funding sources, or contract terms and renewal options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL115_23 Addendum 4.pdf | ||
| BL115_23 Addendum 6.pdf | ||
| BL115_23 Notice.pdf | ||
| BL115_23 Addendum 3.pdf | ||
| BL115_23 Addendum 1.pdf | ||
| BL115_23 Addendum 2 .pdf | ||
| BL115_23 Addendum 5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID TABULATION Page 1 of 2
BL115-23
Little Suwanee Creek Gravity Sewer and Force Main Project Department of Water Resources
ITEM
DESCRIPTION
UNIT
PRICE
TOTAL
PRICE
UNIT
PRICE
TOTAL
PRICE
1 Asphalt Pavement Resurfacing (Measurement & Payment Item #1b) 4,000 SY $25.00 $100,000.00 $120.00 $480,000.00
2 Driveway Cut Restoration - Concrete (Measurement & Payment Item #2) 60 SY $85.00 $5,100.00 $100.00 $6,000.00
3 Driveway Cut Restoration - Asphalt (Measurement & Payment Item #2) 460 SY $75.00 $34,500.00 $70.00 $32,200.00
4 Curb/Combination Curb and Gutter (Measurement & Payment Item #3) 2,500 LF $60.00 $150,000.00 $60.00 $150,000.00
5 Sidewalk Restoration (Measurement & Payment Item #4) 4,500 SY $70.00 $315,000.00 $80.00 $360,000.00
Steel Casing, Bore & Jack Installation, 36” Dia.
(Measurement & Payment Item #5)
235 LF $1,505.00 $353,675.00 $2,500.00 $587,500.00
Steel Casing, Bore & Jack Installation, 48” Dia.
(Measurement & Payment Item #5)
265 LF $1,900.00 $503,500.00 $3,400.00 $901,000.00
8 Steel Casing, Open Cut, 36” Dia. (Measurement & Payment Item #5) 150 LF $550.00 $82,500.00 $1,000.00 $150,000.00
9 Permanent Seeding (Measurement & Payment Item #7) 6,500 SY $2.00 $13,000.00 $4.00 $26,000.00
10 Sodding (Measurement & Payment Item #8) 9,500 SY $18.00 $171,000.00 $18.00 $171,000.00
11 Tree Save Barrier Fence (Measurement & Payment Item #9) 4,000 LF $3.00 $12,000.00 $3.00 $12,000.00
12 Traffic Control - Devices (Measurement & Payment Item #11a) 1 LS $107,000.00 $107,000.00 $750,000.00 $750,000.00
Erosion and Sediment Controls - Hay Bales (Sd1)
(Measurement & Payment Item #12b)
160 EA $20.00 $3,200.00 $10.00 $1,600.00
Erosion and Sediment Controls – Temp Silt Fence C (Sd1)
(Measurement & Payment Item #12d)
9,500 LF $10.00 $95,000.00 $4.00 $38,000.00
Erosion and Sediment Controls – Slope Stabilization (Ss)
(Measurement & Payment Item #12f)
1,000 SY $3.00 $3,000.00 $10.00 $10,000.00
Erosion and Sediment Controls – RipRap (St)
(Measurement & Payment Item #12h)
25 SY $65.00 $1,625.00 $200.00 $5,000.00
Erosion and Sediment Controls – Mulch (Ds1)
(Measurement & Payment Item #12i)
10 TN $700.00 $7,000.00 $400.00 $4,000.00
Erosion and Sediment Controls – Temp Seeding (Ds2)
(Measurement & Payment Item #12j)
16,000 SY $1.00 $16,000.00 $1.00 $16,000.00
19 Site Restoration and Cleanup (Measurement & Payment Item #13) 1 LS $10,000.00 $10,000.00 $400,000.00 $400,000.00
20 Project Record Drawings (Measurement & Payment Item #14) 1 LS $5,000.00 $5,000.00 $50,000.00 $50,000.00
Sanitary Utility Sewerage Piping – 6” Diameter DIP (House Connections)
(Measurement & Payment Item #27b)
65 LF $200.00 $13,000.00 $200.00 $13,000.00
Sanitary Utility Sewerage Piping, – 24” Diameter DIP, PC 200 (Measurement &
Payment Item #28)
1,996 LF $409.00 $816,364.00 $550.00 $1,097,800.00
Sanitary Utility Sewerage Piping, – 24” Diameter DIP, PC 200, Ceramic Epoxy
Line (Measurement & Payment Item #28)
655 LF $508.00 $332,740.00 $715.00 $468,325.00
Sanitary Utility Sewerage Piping (FM) –16” Diameter DIP, PC 350
(Measurement & Payment Item #29a)
4,395 LF $391.00 $1,718,445.00 $415.00 $1,823,925.00
Sanitary Utility Sewerage Piping (FM) – 16” Diameter DIP, PC 350, Ceramic
Epoxy Lined (Measurement & Payment Item #29a)
2,705 LF $456.00 $1,233,480.00 $475.00 $1,284,875.00
Sanitary Utility Sewerage Piping (FM) –Plug Valve
(Measurement & Payment Item #29c)
3 EA $17,000.00 $51,000.00 $20,000.00 $60,000.00
27 Standard Manhole, 48”, Dia. (Measurement & Payment Item #31a) 80 VF $300.00 $24,000.00 $600.00 $48,000.00
Polymer Concrete Manhole, 48” Dia.
(Measurement & Payment Item #31a)
50 VF $1,600.00 $80,000.00 $4,000.00 $200,000.00
Large Manhole Base, 60” Dia. With Transition Slab
(Measurement & Payment Item #31b)
10 EA $6,000.00 $60,000.00 $14,000.00 $140,000.00
Large Manhole Base, 60” Dia. With Transition Slab,- Polymer Concrete
(Measurement & Payment Item #31b)
5 EA $30,000.00 $150,000.00 $18,000.00 $90,000.00
Large Manhole Base, 72” Dia. With
Transition Slab (Measurement & Payment Item #31b)
2 EA $9,000.00 $18,000.00 $15,000.00 $30,000.00
Large Manhole Base, 72” Dia. With Transition Slab – Polymer Concrete
(Measurement & Payment Item #34)
1 EA $1.00 $1.00 $20,000.00 $20,000.00
Manhole Frame and Cover – Traffic Rated Type
(Measurement & Payment Item #31c)
18 EA $5,000.00 $90,000.00 $3,000.00 $54,000.00
34 Manhole Core, 24” (Measurement & Payment Item #31e) 1 EA $1.00 $1.00 $6,000.00 $6,000.00
35 Manhole Invert Rehabilitation (Measurement & Payment Item #32) 1 EA $1.00 $1.00 $8,000.00 $8,000.00
Air/Vacuum Valve Assembly – 2” (New Installation)
(Measurement & Payment Item #35)
2 EA $33,000.00 $66,000.00 $20,000.00 $40,000.00
37 Rock Removal – Trench Rock (SUP#1) 1,200 CY $0.01 $12.00 $600.00 $720,000.00
38 Wetlands, Stream Banks and Stream Buffer Restoration (SUP#2) 1 LS $15,000.00 $15,000.00 $80,000.00 $80,000.00
39 Temporary Stream Crossings (Sr) (SUP#3) 1 LS $5,000.00 $5,000.00 $80,000.00 $80,000.00
40 Exterior Manhole Joint Wrap (SUP#4) 1,010 LF $2.00 $2,020.00 $25.00 $25,250.00
JDS, Inc.
(L)
Site Engineering, Inc.
(OC)
APPROX.
QTY
PART 1 - UNIT PRICE ITEMS
km
BID TABULATION Page 2 of 2
BL115-23
Little Suwanee Creek Gravity Sewer and Force Main Project Department of Water Resources
ITEM
DESCRIPTION
UNIT
PRICE
TOTAL
PRICE
UNIT
PRICE
TOTAL
PRICE
JDS, Inc.
(L)
Site Engineering, Inc.
(OC)
APPROX.
QTY
41 Gravel Roadway Repair (SUP#5) 1,600 SY $20.00 $32,000.00 $25.00 $40,000.00
1 Exploratory Excavations (Measurement and Payment Item #10) 35 EA $270.00 $9,450.00 $300.00 $10,500.00
2 Traffic Control – Police Officer (Measurement & Payment Item #11b) 1,000 HRS $55.00 $55,000.00 $55.00 $55,000.00
Recommended Vendor:
JDS, Inc.
Attn: Steven Archer 272 Hurricane Shoals Road, NE Lawrenceville, GA 30046 Phone: 770-972-8000 Sarcher@jdspipe.com
$65,500.00
PART 2 - OWNER DIRECTED ITEMS
OVERALL TOTAL (PART 1 + PART 2) $10,544,975.00$6,759,614.00
PART 1 TOTAL $6,695,164.00 $10,479,475.00
PART 2 TOTAL $64,450.00
km mailto:Sarcher@jdspipe.com
| 20240117082007476.pdf |
| BL115-23 Tab.pdf |
File details come from the government source that posted it. Updated .