This is an Invitation to Bid (BL072-26) issued by the Gwinnett County Board of Commissioners for HVAC System Maintenance Services at various county facilities. The solicitation encompasses two primary service elements: an Annual Program of Preventive Maintenance with a set monthly fee schedule and Service Call Repairs performed on a Time and Material basis. The scope covers 67 county facilities including libraries, police buildings, support services buildings, and administrative offices across Gwinnett County, Georgia. A pre-bid conference is scheduled for 10:00 AM on April 8, 2026, at the Gwinnett County Purchasing Division in Lawrenceville. Sealed bids must be received by 2:50 PM local time on April 17, 2026, with a virtual-only bid opening at 3:00 PM. The contract will commence on July 1, 2026, or upon Board of Commissioners approval for an initial term of 365 days with firm pricing for the duration. Award notification will be posted on the county website, and successful bidders will be notified via email.
Compensation for preventive maintenance services consists of monthly fixed fees itemized by facility and service type, while service call repairs are billed on an hourly labor rate basis (normal hours and after-hours rates for technicians, helpers, and mechanics) plus parts and materials marked up at varying rates not to exceed 25 percent for items under $500, 20 percent for items $501–$2,000, and 15 percent for items exceeding $2,000. A fixed service call charge applies to cover travel time. The successful contractor must carry comprehensive insurance including General Liability ($2,000,000 aggregate), Commercial Auto Liability ($1,000,000), Workers' Compensation at statutory limits, and Umbrella/Excess Liability coverage, with all carriers rated A-7 or higher by A.M. Best. The contract may be awarded by section or to the overall low responsive and responsible bidder. Gwinnett County reserves the right to reject any or all bids, waive technicalities, and negotiate terms with the lowest responsive, responsible bidder at its discretion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BL072_26 Ad 2.pdf | ||
| Revised DOSS Managed HVAC Equipment List.xlsx | XLSX spreadsheet | |
| BL072_26 Ad 3.pdf | ||
| BL072_26 Ad 1.pdf | ||
| BL072_26 DoSS managed HVAC Equipment List.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 1, 2026
INVITATION TO BID
BL072-26
The Gwinnett County Board of Commissioners is soliciting competitive sealed bids from qualified contractors for HVAC System Maintenance Services at Various County Facilities on a one-year contract for the Department of Support Services.
Bids should be typed or submitted in ink and returned in a sealed container marked on the outside with the BL# and Company Name. Bids will be received until 2:50 P.M. local time on April 17, 2026, at the Gwinnett County Financial Services - Purchasing Division – 2nd Floor, 75 Langley Drive, Lawrenceville, Georgia 30046. Any bid received after this date and time will not be accepted. Bids will be publicly opened and read at 3:00 P.M. The bid opening will be virtual ONLY. To access the bid opening virtually, visit the following Webex virtual meeting link (https://gwinnettgov.webex.com/gwinnettgov/j.php?MTID=m944ecefd3444d42d125788db71d7c31a), or dial 408-418- 9388, and enter Conference ID 23486494337## . Apparent bid results will be available the following business day on our website www.GwinnettCounty.com.
A pre-bid conference is scheduled for 10:00A.M. on April 8, 2026 at the Gwinnett County Purchasing Division, 75 Langley Drive – Second Floor, Lawrenceville, Georgia 30046 inside the Dogwood Conference Room. Questions regarding bids should be directed to Alexis Mckennery, CPPB Purchasing Manager at Alexis.Mckennery@GwinnettCounty.com, no later than 3:00 p.m. April 9, 2026. Bids are legal and binding upon the bidder when submitted.
Successful contractor will be required to meet insurance requirements. The Insurance Company should be authorized to do business in Georgia by the Georgia Insurance Department, and must have an A.M. Best rating of A-7 or higher.
Gwinnett County does not discriminate on the basis of disability in the admission or access to its programs or activities.
Any requests for reasonable accommodations required by individuals to fully participate in any open meeting, program or activity of Gwinnett County Government should be directed to ADA Director, Gwinnett County Justice and Administration Center, 770-822-8165.
The written bid documents supersede any verbal or written prior communications between the parties.
Award will be made to the contractor submitting the lowest responsive and responsible bid. Gwinnett County reserves the right to reject any or all bids to waive technicalities and to make an award deemed in its best interest. Bids may be split or awarded in entirety. Gwinnett County reserves the option to negotiate terms, conditions and pricing with the lowest responsive, responsible bidder(s) at its discretion.
Award notification will be posted after award on the County website, www.gwinnettcounty.com and companies submitting a bid will be notified via email.
We look forward to your bid and appreciate your interest in Gwinnett County.
Alexis Mckennery, CPPB Purchasing Manager
The following pages should be returned in duplicate as your bid: Bid Schedule, Pages 36-53
References, Page 54 Ethics Affidavit, Page 59 E-Verify, Page 60 Subcontractors List, Page 61 https://gwinnettgov.webex.com/gwinnettgov/j.php?MTID=m944ecefd3444d42d125788db71d7c31a http://www.gwinnettcounty.com/ mailto:Alexis.Mckennery@GwinnettCounty.com
BL072-26 Page 2
GWINNETT COUNTY DEPARTMENT OF SUPPORT SERVICES
HVAC MAINTENANCE SERVICES
The Gwinnett County Board of Commissioners is soliciting competitive pricing for HVAC System Maintenance Services for various County facilities. The services will include two different work elements:
1) an Annual Program of Preventive Maintenance to be performed with a set monthly fee schedule and 2) Service Call Repairs to be performed on a Time and Material Basis. The two sets of services are described in Section I - Scope of Services outlined below. The facilities included are listed in Section II - Service Locations. This contract may be awarded by section or to the overall low responsive and responsible contractor.
No organization, firms, or individuals seeking award of a contract under this solicitation may initiate or continue any verbal or written communications regarding the solicitation with any County officer, elected official, employee, or other County representative without permission of the Purchasing Associate named on the solicitation, between the date of the issuance of the solicitation and the date of final contract award by the Board of Commissioners. Violations will be reviewed by the Purchasing Director. If determined that such communication has compromised the competitive process, the offer submitted by the organization, firm, or individual may be disqualified from consideration for award.
The County has compiled an Equipment Inventory List for the facilities currently covered under this contract in order. This document will assist the bidder in preparation of the bid. Due to the size of this document, interested parties are to submit a request for the Equipment Inventory List by email. Requests are to be sent to Alexis.Mckennery@GwinnettCounty.com . Failure to obtain this document does not alleviate the bidder from the responsibility of performing all of the services set forth in this solicitation at the prices stated on the Bid Schedule.
The services provided under this contract will commence on July 1, 2026 or upon Board of Commissioners approval and will be for 365 days with pricing to remain firm for the duration of the initial term.
Section I - Scope of Services
Annual Program of Preventive Maintenance
The Gwinnett County Department of Support Services has designated a list of facilities for which it requires a set schedule of preventive maintenance tasks. The services covered under this section are described under sub-sections I.A - I.B Most facilities will require quarterly maintenance, although some locations will only require monthly, semi-annual services, and some equipment items only annual. The frequency of service for each facility is specified herein, along with the actual month that the work must be performed.
The selected Contractor will be responsible for all listed work items and their associated costs. Included in these costs are administration, supervision and overhead; travel; equipment and tools necessary to perform the services, including hand tools, wet dry vacuums, torches if applicable, drills, ladders, vacuum pumps, sludge sucker kit usage, nitrogen, drain line cleaning agents or tools such as CO2, test instruments, lifts to access equipment; personnel time; and consumable materials such as filters, belts, lubricants, refrigerant, duct tape, foil tape, etc.
If during the preventative/scheduled maintenance services, the Contractor determines the need for repair or replacement of parts, the scope of which extends beyond the assigned preventive/scheduled maintenance tasks, the Contractor shall promptly notify the County, while on site, and shall proceed with the repair and/or replacement of the parts per the County’s direction. It is in the County’s best interest to authorize these repairs quickly to minimize unscheduled service calls. These repairs and replacements shall be performed under the Time and Materials element of the agreement and Service Call Charges will not be allowed for such repairs.
Any damage to a facility as a result of the Contractor or their work will be the responsibility of the Contractor to repair as required and supervised by the County at the Contractor’s expense.
mailto:Alexis.Mckennery@GwinnettCounty.com
BL072-26 Page 3 Any damage as part of a preventive maintenance task to insulation on ductwork or piping, including both internal or external on ductwork, and including any metal type covering and banding, must be repaired at no additional cost to the County. All repairs must be performed to match existing application prior to damage.
NOTE: As part of its services, the selected Contractor shall be responsible for confirming and updating the equipment list for each facility. The format for this list will be Microsoft Excel. An equipment list is included in this bid document. The County Representative shall review and approve the format prior to the Contractor preparing the updated list. The Contractor shall provide the equipment list to the County Representative as soon as practicable but no later than four (4) months after the start of the contract, and immediately following any equipment change. This is non-negotiable. The list shall include for all major equipment, the make, model, and serial number and shall indicate the quantity and sizes of all belts and filters. The Contractor shall maintain this master list of equipment for the duration of the contract. When the County or the Contractor replaces a piece of equipment, the Contractor shall update the list to reflect the new equipment. The contractor shall provide an updated list at the time of each equipment change and a minimum of once annually if no changes. Gwinnett County will provide an update to the contractor if equipment upgrades or changes outside this agreement occur. All preventive maintenance checklists should contain model and serial number for verification for each visit.
In addition, no later than six (6) months after the start of this contract, the Contractor shall provide to Gwinnett County the following information. This shall be added to the equipment inventory lists provided.
1. Manufacturer date of each piece of equipment
2. Replacement cost of each unit and/or system. Example: Split system replacement will include AHU/Furnace, coil, and outdoor unit. Cost shall include equipment and labor.
Preventive Maintenance
The Preventive Maintenance checks listed are a minimum of tasks that Gwinnett County demands to be performed. However, it is the responsibility of the awarded contractor to review the manufacturers preventive maintenance procedures and provide these back to Gwinnett County. If there are additional tasks recommended, Gwinnett will update these procedures. This will assure all types of equipment in our Fleet are maintained as recommended to prolong the life of each unit.
BL072-26 Page 4
I. Air Conditioning Preventive Maintenance Program (Quarterly PM shall occur a minimum of three times in a calendar year)
All items listed below in the PM shall be included and recorded on the PM Checklist.
At a minimum, the Air Conditioning Preventive Maintenance Program (per system) shall include the following tasks:
A. Standard DX , Heat Pump or Split Systems
1. Record Delta T across evaporator coil and note on paperwork for records. Clean evaporator if it is less than (18) degrees.
2. Refrigerant pressures, Superheat and Subcooling should be recorded if system is not operating properly to 18 degrees Delta T or better. Replace up to five (5) pounds of refrigerant as part of basic preventive maintenance services.
3. Record voltage and amperage to all motors, compressors, etc. Example: 3 phase motor, Contractor will document Volts: L1 , L2 , L3 and Amps L1 , L2 , L3
4. Check for refrigerant leaks
5. Lubricate all moving parts, bearings, etc.
6. Replace belts and adjust tension. Replace as needed but no less than twice per year on all equipment.
7. Replace filters. (Note: Filters shall be extended service 40% pleated “Pre-Pleat 40” filters. Any proposed equivalent products must be approved by Gwinnett County personnel prior to use.)
8. Clean Condenser and evaporator coils as needed, but not less than once a year.
9. Check pressure switch and cut-out settings.
10. Check electrical lock-out circuits.
11. Check Contactor contacts
12. Check all wiring connections. Check and adjust thermostats for proper calibration and operation. On
Annual PM, contractor will be responsible for notifying County representative and calibrating all space sensors for Building Automation applications.
13. Replace batteries in thermostats, but not less than once a year.
14. Record outdoor ambient temperature.
15. Check and flush condensate drain. Add drain pan treatment at least but not limited to twice per year.
No drain pan tablets are to be utilized as part of this contract. NOTE: Clogged drain lines or stopped up drain pans will be the sole responsibility of the contractor, and not be applicable for a billable call following the initial PM as part of this contract.
16. Visually check ductwork for broken connections or faulty insulation. (Notify Gwinnett County if any repairs are needed)
17. Remove dust, soot, rust, etc. from blower
18. Operate air conditioning system through normal cycle, make any necessary adjustments. (Notify
Gwinnett County representative if necessary to make remote commands)
19. Inspect and service exhaust fans (both ceiling and roof mounted. (Change belts no less than twice per year.)
20. Clean return and exhaust intake vents as often as needed to assure proper airflow For each system and exhaust fan. Where applicable, Inspect and clean VFD’s , including wiring terminals and cooling Fans, intake grille, etc.
B. Chilled Water or Water Source Heat Pump Systems
1. Record Delta T across evaporator coil and note on paperwork for records. Clean evaporator if it is less than (18) degrees
2. Super heat and Sub cooling should be recorded if system is not operating at 18 degree Delta T or better.
3. Replace up to five (5) pounds of refrigerant as part of the basic preventive maintenance service.
BL072-26 Page 5
4. Record voltage and amperage to all motors, compressors, etc. Example: 3 phase motor. Contractor will document Volts: L1 , L2 , L3 and Amps L1 , L2 , L3 Where applicable, inspect and clean VFD’s, including wiring terminals and cooling Fans
5. Lubricate all moving parts, bearings, etc.
6. Check for refrigerant leaks
7. Replace all belts, adjust tension. Replace as needed, but no less than twice per year on all equipment.
8. Replace filters. (Note: Filters shall be extended service 40% pleated “Pre-Pleat 40” filters. Any proposed equivalent products must be approved by Gwinnett County personnel prior to use.)
9. Clean Condenser and evaporator coils as needed, but not less than once a year.
10. Check pressure switch and cut out circuits
11. Check electrical lock-out circuits
12. Check contactor contacts and wiring connections
13. Check all wiring connections. On Annual PM, contractor will be responsible for notifying County representative and calibrating all space sensors for Building Automation applications.
14. Record outdoor temperature
15. Check and flush condensate drain. No drain pan tablets are to be utilized as part of this contract. NOTE:
Clogged drain lines or stopped up drain pans will be the sole responsibility of the contractor, and not be applicable for a billable call following the initial PM as part of this contract.
16. Visually check ductwork for broken connections or faulty insulation. (Notify Gwinnett County if any repairs are needed)
17. Remove dust, soot, rust, etc. from blower
18. Operate system through cycle, make any necessary adjustments. (Notify Gwinnett County representative if necessary to make remote commands)
19. Inspect, clean and grease all pumps Annually (If applicable)
20. Inspect and service exhaust fans, change belts no less than twice per year. (both ceiling and roof mounted)
21. Clean return and exhaust intake vents as often as necessary to assure proper airflow for each system and exhaust fan.
22. Inspect and service compressors. Service screw compressors Annually (or as needed)
23. Inspect and service air cooled chillers Annually (If applicable)
24. Clean chiller coils (Annually, but not limited to)
25. Inspect and service Cooling Tower Quarterly (If applicable) Clean as necessary to ensure adequate performance, but a minimum of once per year. Follow manufacturer’s recommendations for acceptable chemicals and cleaning practices.
26. Inspect circulation pumps. Refer to Circulation Pump PM in this document.
II. Heating Preventive Maintenance Program (Quarterly PM shall occur a minimum of once per calendar year)
A. Gas Heat Applications: At a minimum, the Furnace Preventive Maintenance Program shall include the following tasks but not be limited to:
1. Check and adjust thermostat.
2. Check and adjust all safety controls.
3. Clean burners and heat exchanger as needed.
4. Clean and adjust pilot assembly.
5. Check and adjust burner for efficiency.
6. Check for gas leaks in furnace.
7. Using a Carbon Monoxide Detector, check CO readings in space and supply ductwork.
Record readings in PPM on checklist. Where multiple units serve a common area, separate readings must be documented per system. Contractor must supply manufacturer, model no.
and last calibrated date of Carbon Monoxide Detector, on Checklist.
8. Lubricate all moving parts.
9. Change belt and adjust tension.
BL072-26 Page 6
10. Replace filters. (Note: Filters shall be extended service 40% pleating “Pre-Pleat 40” filters or equivalent.)
11. Check flue pipe. Verify there is no blockage and no rusted connections.(Notify
Gwinnett County if any repairs are needed)
12. Turn exposed dampers to heating, if marked. No balancing.
13. Adjust pressure regulator if needed.
14. Check air circulation for each system.
15. Visually check ductwork for broken connections or faulty installation (Notify Gwinnett County if any repairs are needed)
16. Remove dust, soot, rust, etc., from furnace blower.
17. Operate furnace through normal cycle, make any necessary adjustments to settings within equipment, to allow for proper operation.
B. Heat Pump Applications:
1. Record Delta T across evaporator coil and note on paperwork for records.
2. Replace up to five (5) pounds of refrigerant as part of basic preventive maintenance services
3. Record voltage and amperage to all motors, compressors, etc. Example: 3 phase motor.
Contractor will document Volts: L1 , L2 , L3 and Amps L1 , L2 , L3
4. Lubricate all moving parts, bearings, etc.
5. Check for refrigerant leaks
6. Lubricate all moving parts, bearings, etc.
7. Replace belts and adjust tension. Replace as needed but no less than twice per year on all equipment.
8. Replace filters. (Note: Filters shall be extended service 40% pleated “Pre-Pleat 40” filters.
Any proposed equivalent products must be approved by Gwinnett County personnel prior to use.)
9. Clean Condenser and evaporator coils as needed, but not less than once a year.
10. Check pressure switch and cut-out settings.
11. Check electrical lock-out circuits
12. Check contactor contacts and wiring connections
13. Check all wiring connections. On Annual PM, contractor will be responsible for notifying
County representative and calibrating all space sensors for Building Automation applications.
14. Replace batteries in thermostats, but not less than once a year.
15. Record outdoor ambient temperature.
16. Visually check ductwork for broken connections or faulty insulation. (Notify Gwinnett
County if any repairs are needed)
17. Remove dust, soot, rust, etc. from blower
18. Operate system through normal cycle, make any necessary adjustments. (Notify
Gwinnett County representative if necessary to make remote Commands
19. Inspect and service exhaust fans (both ceiling and roof mounted. (Change belts no less than twice per year.)
20. Clean return and exhaust intake vents as often as needed to assure proper airflow For each system and exhaust fan.
21. Where applicable, Inspect and clean VFD’s , including wiring terminals and cooling fans, intake grille, etc.
22. Check reversing valve for proper operation
23. Check defrost board and components for proper operation.
24. Check operation of Electric Heat strips and Record amperage and supply temperature with heat strips engaged.
25. Check Crankcase heater for proper operation.
BL072-26 Page 7
III. Boilers Annual PM
1. Tear down, inspect, re-assemble with proper gasket materials, and restart all boilers for
State Department of Labor inspections. (CONTRACTORS SHALL BE FAMILIAR WITH
STATE INSPECTIONS OF BOILERS).
2. Perform all work per manufacturer’s recommendations.
IV. Circulation Pump PM (Hot Water during Heating PM, Chilled Water during Spring PM) Perform Visual inspections on every PM.
1. Check operation of Pump.
2. Verify no excess vibration is present.
3. Verify no abnormal noise is present.
4. Check for proper shaft seal, wear on shaft.
5. Record voltage and amperage to all motors, Example: 3 phase motor. Contractor will document Volts: L1 , L2 , L3 and Amps L1 , L2 , L3
6. Lubricate all necessary parts per manufacturer’s recommendations.
7. Remove electrical cover and inspect wiring connectors for proper tightness
8. Verify no water leaks are present. Notify Gwinnett County representative if there are any repairs necessary.
V. PAC Unit PM:
1. Check touch pad for any alarms present. Address or clear as needed.
2. Verify drain pan is clear and clean.
3. Change belts and set proper alignment (No less than twice per year)
4. Record voltage and amps for all motors
5. Check for refrigerant leaks. Replace up to five (5) pounds as part of the Preventative
Maintenance services.
6. Vacuum out entire unit but not limited to, and include evaporator coil, motor and blower section, control panel section and compressor section.
7. Lubricate all moving parts where applicable
8. Where such systems are dual cooling capable, such as DX or Chilled Water, check system in both sequences to assure all components such as compressors and chilled water valves are operating properly. Force each system into DX operation to test all sources of cooling and dehumidification. While DX units are operating, verify condenser fan is cycling properly.
9. Visually check ductwork for broken connections or faulty insulation.
10. Replace filters. (Note: Filters shall be extended service 40% pleated “Pre-Pleat 40” filters.
Any proposed equivalent products must be approved by Gwinnett County personnel prior to use.)
11. Check pressure switches and cut-out settings for proper operation.
12. Check electrical lock-out circuits
13. Check all relays, contactor contacts, and wiring connections.
14. Check and calibrate thermostats, and/or sensors for proper calibration and operation.
15. Check and flush condensate drain. Add drain pan treatment. No drain pan tablets are to be utilized as part of this contract.
16. If condensate pump is present, add bleach or proper chemical agent to pump to prevent sludge or algae build up.
17. Visually check ductwork for broken connections or faulty insulation.
18. If applicable, replace batteries in thermostat.
19. Once PM is complete, verify with Gwinnett County Control Room representative that full communication is restored prior to leaving facility
BL072-26 Page 8
VI. Exhaust Fan PM:
1. When applicable, Change belts and check for proper alignment. (No less than twice per Year)
2. Record voltage and amps for all motors
3. Lubricate all moving parts where applicable
4. Check for excessive vibration and any broken components.
5. Verify Fan is secured properly to ductwork, curb or wall, which ever applies.
6. If controlled by thermostat, verify for proper calibration and operation.
7. If motorized louvers are included in sequence of operation, verify all are working properly.
8. Check all relays, contactors and electrical components for proper operation and secure connections where needed.
9. All intake vents will be vacuumed and wiped down.
10. Cabinet, in-line and ceiling mounted fans: remove cover, clean inside fan, blades and motor.
VII. Electric Unit Heater/ Wall Heater Annual PM:
1. Inspect Heater for proper operation
2. Exercise with thermostat to assure proper calibration
3. Remove cover, vacuum out heat and fan sections of unit
4. Record voltage and amperage of heater. Example: 3 phase motor. Contractor will document
Volts: L1 , L2 , L3 and Amps L1 , L2 , L3
5. Verify all wiring connections are good and no signs of overheated wiring.
VIII. Humidifier PM:
1. Check system for alarms
2. Clean reservoir tank and clear of all sediments
3. Verify all water connections are without leaks
4. Verify Steam piping to ductwork is in good condition and free of cracks or leaks
5. Verify humidity sensors are calibrated correctly
6. Check all wiring internally and externally for secure connections
7. Check motor starter where applicable
8. Record humidity settings and actual humidity in space on a checklist
9. When PM is complete, verify with Gwinnett County Control Room Representative that all communication is present with no alarms prior to leaving facility.
IX. Dehumidifier PM:
1. Replace Filter
2. Clean drain line
3. Clean Coil
X. Variable Refrigerant Volume (VRV) Service Checker (For Daikin VRV system)
1. Run Daikin VRV Service Software
2. Collect Trending for at least one hour
3. Analyze the results to identify areas of concern
4. Provide detailed report to HVAC Supervisor
BL072-26 Page 9
XI. Liebert Split System PM:
Air Handler
1. Check System for alarms
2. When applicable, Change belts and check for proper alignment (No less than twice per Year)
3. Record voltage and amps for all motors
4. Lubricate all moving parts where applicable
5. Check for excessive vibration and any broken components.
6. Verify blower fan is operating without any vibration or excessive noise
7. Check all wiring internally and externally for secure connections
8. Check motor starter where applicable
9. Record humidity settings and actual humidity in space on a checklist. When PM is complete, verify with Gwinnett County Control Room Representative that all communication is present with no alarms prior to leaving facility.
10. Verify Electric Heat portion of system is working properly. Exercise all stages of heat and verify all contactor and relays are working properly.
11. Verify all wiring connectors and plugs are secure and in proper working order
12. Infrared Humidifier:
a. Verify drain for humidifier reservoir is in good condition
b. Remove water from reservoir, remove pan from unit and clean thoroughly.
c. Only Clean with recommended agents for stainless steel.
d. Check all limit switches and safeties on reservoir
e. Change Infrared bulbs (Annually)
f. Inspect mounting blocks for bulbs
g. Inspect contactors for bulbs
h. Check water solenoid valve for proper operation.
i. Provide signal for humidifier to operate.
j. Verify reservoir fills properly and infrared bulbs Operate properly.
Condensing Unit
1. Clean outdoor Coil
2. Check all electrical components for proper operation
3. When applicable, Change belts and check for proper alignment (No less than twice per
Year)
4. Record voltage and amps for all motors
5. Lubricate all moving parts where applicable
6. Check for excessive vibration and any broken components.
7. Check all wiring internally and externally for secure connections
8. Check motor starter where applicable
9. If condenser has fan cycling capability, verify fan cycles properly.
XII. Coil Cleaning
All Coil Cleanings, both evaporator and condenser, will be cleaned during the Spring Season PM. This is not the same month throughout, but usually occurs during March, April or May.
XIII. Special Filter Change and Disposal Requirements
The Police Training Facility Firing Range building has unique filter changing and disposal requirements. Filters in AHU #5A, #5B and #7 contain lead dust and will require removal from site by a qualified vendor and transportation to a proper disposal site. Successful Contractor will provide, at time of bid submission, the name of the proposed vendor, description of the proposed vendor’s disposal procedures, and documentation showing that the proposed vendor is certified for these practices.
BL072-26 Page 10
During the filter removal from the AHU process, at no time will a filter touch or drop particles onto the mechanical room or any floor on the property. Proper containment and securing will be performed to assure no lead deposits are found on site during or after replacement procedures.
NOTE: Quarterly black light inspections are performed by on site staff to assure this process is performed properly. If deposits are discovered, the contractor will be responsible for refunding Gwinnett County for such specialized services that are performed by a Gwinnett County vendor.
Once the contract is awarded, a copy of the manifest where the filters are scheduled to be transported will be submitted to Gwinnett County for our records. At time of each change, a copy of the vendors removal invoice will be provided with the PM documents. This process will guarantee Gwinnett County that at no time any filters from our site will be found illegally disposed of.
BL072-26 Page 11
XIV. Facilities Covered under Preventive Maintenance Program
Facility
Equipment
Preventive Maintenance
Frequency
Actual Months of PM Occurrence
Collins Hill Branch Library
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator Cleaning
Exhaust Fans
Quarterly PM
Semi Annual PM
Annual PM
Monthly filter change
Semi Annual PM
Feb, May, Aug, Nov
May, November
May
Jan thru Dec
May, November
Lawrenceville Branch Library and Headquarters
Exhaust Fans
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Feb, May, Aug, Nov
May, November
May
May, November
Peachtree Corners Branch Library
Semi Annual PM
Annual PM
Semi Annual PM
Jan, April, July, Oct
April, October
April
Duluth Branch Library
Water Source Heat Pump
Pumps
Boiler
Exhaust Fans
Unit/Wall Heater
Quarterly PM
Annual PM
Annual PM
Semi Annual PM
Annual PM
Jan, April, July, Oct
October
October
BL072-26 Page 12
Norcross Branch Library
Exhaust Fans
Unit/Wall Heater
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Annual
Jan, April, July, Oct
April, October
April
April, October
October
Buford Branch Library
Semi Annual PM
Annual PM
Semi Annual PM
Jan, April, July, Oct
Suwanee Branch Library
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator Cleaning
Exhaust Fans
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Jan, April, July, Oct
Mountain Park Branch Library
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator Cleaning
Exhaust Fans
Unit/Wall Heaters
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Annual PM
Mar, Jun, Sept, Dec
March, September
March
June, December
December
Lilburn Branch Library
Semi Annual PM
Annual PM
Semi Annual PM
Mar, June, Sept, Dec
March, September
March
June, December
BL072-26 Page 13
Elizabeth Williams (Snellville) Branch
Quarterly PM
Semi Annual PM
Annual PM
Mar, June, Sept, Dec
March, September
March
Centerville Branch Library and Community Center
Condenser and Evaporator Cleaning
Exhaust Fans
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Mar, June, Sept, Dec
March, September
March
June, December
Grayson Branch Library
Cleaning
Exhaust Fans
Quarterly PM
Plus two additional filter changes
Semi Annual PM
June, September
Dacula Branch Library
Plus two additional filter changes
Five Forks Branch Library
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator Cleaning
Exhaust Fans
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Mar, June, Sept, Dec
March, September
June, December
BL072-26 Page 14
Hamilton Mill Branch
PIU Filter Changes
Air Handler HEPA Filter Changes
Unit/ Wall Heaters
Quarterly PM
Semi-Annual PM
Annual PM
Annual PM
Feb, May, Aug, Nov
February
November
Hooper Renwick Library
PIU Filter Changes
Quarterly
Annual
Semi-Annual
Jan, April, July, Oct
Jan, July
GA Department of Drivers Services
Cleaning
Exhaust Fans
Quarterly PM
Plus two
Semi Annual PM
Snellville Tag Office
Cleaning
Exhaust Fans
Quarterly PM
Plus two
Semi Annual PM
Mar, June, Sept, Dec
July, October
March, September
BL072-26 Page 15
Records Management Warehouse
All Systems
Coil Cleaning
Exhaust Fans
Quarterly
Annual
Semi-Annual
Feb, May, Aug, Nov
May
May, November
Former Duluth Library
All Systems
Belts
Coil Cleaning
Quarterly
Semi-Annual
Annual
Jan, April, July, Oct
April, Oct
Airport Administration Bldg.
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator
Cleaning Exhaust Fans
Quarterly PM
Semi Annual
PM Annual PM
Semi Annual PM
Feb, May, Aug, Nov May, November May
May, November
Airport Tower
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator Cleaning
Exhaust Fans
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Feb, May, Aug, Nov
May, November
May
May, November
Peachtree Corners Tag Office
April and October
Gwinnett Entrepreneur Center
Exhaust Fans
BL072-26 Page 16
Community Resource Center and Bethany Church Road
All Systems
Exhaust Fans
VRF Checkout
Wall Heaters
Coil Cleaning
Quarterly PM
Semi Annual PM
Semi Annual PM
Annual PM
Annual PM
Jan, April, July, Oct
April, October
April, October
DOT Barn #1
Exhaust Fans Unit Heaters
Semi Annual PM
Semi Annual PM
Annual PM
Semi Annual PM Annual PM
April, October
April, October
April
April, October October
DOT Barn #2
Unit Heaters
Annual PM
Semi Annual PM
Annual PM
April, October
April, October
April
April, October
October
DOT Barn #3
Exhaust Fans
Unit Heaters
Semi Annual PM
Semi Annual PM
Annual PM
Semi Annual PM
Annual PM
April, October
April, October
April
April, October
October
DOT Barn #5
Exhaust Fans Unit Heaters
April, October
BL072-26 Page 17
Buford Human Services
All Systems
All belts in Facility (if applicable)
Centerville Senior Center
All RTU’s
All belts in Facility (if applicable)
Semi Annual PM
Annual PM
Semi Annual PM
Mar, June, Sept, Dec
March, September
March
March, September
Gwinnett Senior Services
Split Systems
All belts in Facility (if applicable)
Energy Recovery Units
Semi Annual PM
Annual PM
Quarterly PM
Jan, July
Jan, July
July
Jan, Mar, July, Oct
Gwinnett Medical Examiner’s Office
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator Cleaning
Exhaust Fans
Unit/Wall Heaters
Quarterly PM
Semi Annual PM
Annual PM
Semi Annual PM
Annual PM
Mar, Jun, Sept, Dec
March, September
March
December
BL072-26 Page 18
Gwinnett County Comprehensive Correctional Complex
All RTUs
RTU Belts
Condenser and Evaporator Cleaning
All MUA units
MUA unit Belts
EF #42 thru EF #45, EF #47 thru
EF #50
EF #42 thru EF #45, EF #47 thru EF #50 Belts
Exhaust Fans Direct Drive
Exhaust Fan HEPA and Pre Filters (2) quantity
Quarterly PM
Semi Annual PM
Annual PM
Quarterly PM
Semi Annual
Annual PM
Feb, May, Aug, Nov
May, November
May
Jan, April, July, January
January
DOT Maintenance and Supply Facility
Condenser Coil Cleaning Annual PM April
Fleet Management Facility
All Systems
All belts in Facility (if applicable)
February, August
February, August
Connections Corner
All Systems
Condenser and Evaporator Cleaning
Annual PM
Annual PM
April
April
Gwinnett Central Services
AHU Coil Cleanings Annual PM September
BL072-26 Page 19
Lawrenceville Senior
All Systems
All belts in Facility (if applicable)
Norcross Human Services Center
All Systems
All belts in Facility (if applicable)
Condenser and Evaporator Cleaning
Exhaust Fans
PIU Filter Changes
Semi Annual PM
Semi Annual
Annual PM
Semi Annual PM
Annual PM
March, October
March, October
March
March, October
October
Innovation Square
RTU Coil Cleanings Evaporator and Condenser
Split System Coil Cleanings Evaporator and Condenser
Annual PM
Annual PM
April
April
Police Headquarters
Exhaust Fans
Dehumidifier
Semi Annual PM
Quarterly PM
Jan, April, July, Oct.
Police Annex and 911
AHU’s and Outside Air Unit
All belts in Facility (if applicable)X
Jan, April, July and Oct.
BL072-26 Page 20
Police Annex and 911 Center Continued
AHU 1 Box Filters
PAC Units
Pumps
Exhaust Fan
Humidifier
Unit Heater
PIU Unit Filter Changes
PAC Condensing Unit Coil
Semi-Annual PM
Annual PM
Annual PM
April and October
October
October
October
April, October
Police Bay Creek Precinct
Semi-Annual PM
Feb, May, Aug and Nov
Bay Creek 911 Center
Split System
Computer Room Unit
Feb, May, Aug and Nov
May, November
May
Feb, May, Aug and Nov
Police West Precinct
Oct
Police South Precinct
Oct
BL072-26 Page 21
Police South Precinct Continued
Unit/Wall Heaters
April and October
October
Police North Precinct and North Gwinnett Tag Office (same building)
Oct
Police East Precinct
Cooling Tower
Cooling Tower Cleaning
WSHP Evaporator Cleaning
WSHP
Boiler
Pumps
WSHP Filter Change
Split System
Exhaust Fan
Annual PM
Semi Annual PM
Annual PM
Jan, April, July and Oct
October
April, October
April
April, October
October
October
Oct
Police Central Precinct
Semi-Annual PM
Jan, April, July and Oct
BL072-26 Page 22
Bill Atkinson Animal Welfare
All Systems and Energy Recovery Units
All belts in Facility (if applicable)
RTU Filter Changes
Return Air Grille Filters (ceiling), and clean grilles.
Electric Duct Heaters (9)
Monthly PM
Bi-Monthly PM
Oct
Jan thru December
Jan, Mar, May, July, Sept and Nov.
Police Fleet Maintenance
Infrared Heaters
Coil Cleaning
Quarterly
April
April, October
Police Special Operations
All Systems
Coil Cleaning
Exhaust Fans
Quarterly
Annual
Semi-Annual
Jan, April, July, Oct
April
April, October
Police Training Complex
All Systems Except AHU #5A, #5B and #7
Jan, April, July and Oct
All belts in Facility (if applicable) April, October
Evaporator Coil Cleaning Annual PM April
Split System Coil Cleaning Evaporator and Condenser
Annual PM April
AHU’s 5A, #5B and #7 Pre-Filters Monthly PM January thru December
AHU’s 5A, #5B and #7 Bag Filters
Semi-Annual April and October
AHU’s #5A, #5B and #7 HEPA Filters
Annual PM April
AHU’s #5A, #5B and #7 OA- Filters
Quarterly PM Jan, Apr, July, Oct
PIU Filter Changes Annual PM November
Exhaust Fans Quarterly PM Jan, April, July, Oct
Boilers Annual PM November
Pumps Annual PM October
BL072-26 Page 23
XV. Reporting
The Contractor shall prepare and submit to the County a Preventive Maintenance Checklist for each preventive maintenance visit completed. The Preventive Maintenance Checklist must be a comprehensive account of all services performed, to include at a minimum the tasks listed in Section I and II, and must be signed and dated by the responsible technician and a County representative from the facility where the services were performed, if applicable. A legible copy of the completed Checklist must be submitted to the County’s Department of Support Services Representative within 24 hours of completion of the services. The failure by the Contractor to submit these Checklists in a timely manner for scheduled preventive maintenance visits may be cause for the County to withhold payment for that service element in a particular month. The format for the Preventive Maintenance Checklist must be approved by the County prior to the start of services under this Agreement. Every checklist and work summary shall include the model and serial number of each piece of equipment serviced on this PM. There shall be one checklist per piece of equipment or system. This checklist is in addition to a completed work order that includes labor hours and materials used. Contractor is responsible for working with Gwinnett County to develop a format and maintain all checklists for the duration of this contract. Contractor must include in Preventative Maintenance Work Summary the actual number of man hours utilized to complete the PM. Contractor must include on each Preventative Maintenance summary a list of all materials used and installed during that PM. This is to ensure that all filters, belts, etc, are serviced and replaced on this PM. All work performed on site as part of this PM shall be documented in a computerized device and generate a digital notification to the designated Gwinnett County representative, prior to leaving the work site, that the work is complete. In addition, any items found that need noting, a digital photo of item, within the report, shall be included in the work summary, so that items that need addressed can be done so in a timely manner. If for whatever reason, this is not possible, the technician must call and inform the Gwinnett County Representative that the work is complete. This does not relieve contractor of providing the digital notification of work complete. A MONTHLY REPORT shall be supplied to the Gwinnett County representative as a summary of all preventative maintenance tasks completed and will include any notes that the technician has included.
Prime Radio Tower Condenser and Evaporator Coil Cleanings Only Annual PM March
Brown Radio Tower Condenser and Evaporator Coil Cleanings Only Annual PM March
Tribble Radio Tower Condenser and Evaporator Coil Cleanings Only Annual PM March
Goshen Radio Tower Condenser and Evaporator Coil Cleanings Only Annual PM March
Lanier Mountain Radio Tower
Condenser and Evaporator Coil Cleanings Only Annual PM March
Tuggle Radio Tower Condenser and Evaporator Coil Cleanings Only Annual PM March
Water Park Radio Tower Condenser and Evaporator Coil Cleanings Only Annual PM March
Norris Lake Radio Tower Condenser and Evaporator Coil Cleanings Only Annual PM March
Crooked Creek Radio Tower
Condenser and Evaporator Coil Cleanings Only Annual PM March
Fire Station No. 10 Radio Tower
Condenser and Evaporator Coil Cleanings Only Annual PM March
Headquarters Radio Tower
Condenser and Evaporator Coil Cleanings Only Annual PM March
BL072-26 Page 24
This report shall be capable of attaching to an email. This will allow Gwinnett County to have records of possible equipment issues that need to be addressed with the ANNUAL BUDGET. This format must also be approved by the County prior to start of services under this Agreement.
Also, as part of this contract, Awarded contractor must provide a Preventive Maintenance plan that aligns with their organization, that will show the following:
• List of all facilities included in this contract
• Detailed man hours planned for each task, and each occurrence
• Show totals for each type, along with grand total of hours Anticipated for preventive maintenance program.
Police Training and Firing Range Facility, This facility undergoes Annual and Quarterly inspections due to the type of facility. Contractor shall submit a maintenance plan and checklist in an approved format to the Gwinnett County Representative. Contractor shall create a file for on site where the documentation of all PM’s and checklists will be stored and available for inspection representative to review. In addition, this facility requires completion of specific static pressure readings and differential pressure across filters. A chart is in place for these readings to be documented.
XVI. Invoicing
Invoices for services under the Preventive Maintenance Program shall be submitted by the Contractor directly to the Gwinnett County Department of Financial Services, Treasury Division, 75 Langley Drive, Lawrenceville, GA 30046. Invoices must include the Purchase Order Number assigned to this Contract; and must list each facility and the monthly cost for services. These are submitted on a monthly basis. A copy of the Invoice shall also be emailed to a Gwinnett County Support Services Fiscal Management representative. This information will be released upon award of contract. Each month, contractor will submit an invoice, for review, to the Gwinnett County representative. Once approved, the contractor will be authorized to send in invoice to multiple emails for processing. If invoice is not correct, contractor will be notified to correct and resend for approval. Monthly invoices for preventive maintenance services will only be for the work performed in that month. Therefore, every task listed in the Preventive Maintenance Program, shall be itemized with its approved amount. If any service is determined to be incomplete, that amount will be removed from the invoice prior to approval. Once those services are completed, the contractor can invoice for those services on the following monthly invoice.
XVII. Service Call Repair on Time and Material Basis
A. Basic Scope The Contractor shall provide HVAC system repair services on as needed basis in response to service calls. The Contractor shall be available on a 24 hour/7day per week basis, and shall respond to service requirements at all facilities listed in Section XIX, Service Locations. The Contractor shall provide all of the transportation, equipment, labor, parts and materials needed to complete necessary repairs due to service calls.
B. Service Requests
The Contractor shall provide these Time and Material services in response to specific service requests made by the Department of Support Services Representative or designees of this representative. Prior to the start of services under this Agreement the Support Services Representative shall provide the Contractor a list of what other personnel may submit a service request to the Contractor. Service requests will be submitted by telephone or email.
BL072-26 Page 25 C. Response Time
The Contractor shall respond to all emergency service requests within two (2) hours. An emergency service request shall be any service request in which an HVAC system or a significant part of said system is out of service or malfunctioning to the point that adequate heating or cooling cannot be provided to the facility. This response time is a critical requirement of the Agreement, and the Contractor’s failure to consistently adhere to this requirement may be considered non-performance.
D. Basis of Compensation
Compensation to the Contractor for service call responses will be based on the hourly labor rates provided in the bid for the Contract, the actual cost of parts plus a percentage markup indicated in the same bid (but not to exceed 15%), and a fixed trip charge when applicable.
Hours shall be calculated daily from the time the Contractor’s personnel arrives at a service location until the personnel leaves the site. Travel time to and from the location will not be compensated, and travel time away from the service location will not be compensated on an hourly basis. However, one Service Call Charge of a fixed amount may be added to a service call to cover all travel time, including time away from the service site to pick up parts or materials. Overtime labor rates may be charged for time outside of the “normal hours” specified in the bid. Parts must be itemized and billed at actual cost plus the pre-determined markup. The Contractor also agrees that it will provide documentation of costs for parts and materials upon request of the County. This is accomplished by attaching the itemized invoice. Sub-contractor services when authorized by the County shall be billed at cost plus the same mark-up utilized for parts and materials. Sub-contractor costs must be documented.
As part of this contract, there are items that will not be accepted as billable. Included in these costs are administration, supervision, equipment and tools necessary to perform the services, including environmental charges (unless an invoice is provided from vendor to recycle or turn in used refrigerant), rags, hand cleaners, typical lubricants, hand tools, step ladders up to 10’ tall, extension ladders up to 30’, wet dry vacuums, torches if applicable, drills, ladders, vacuum pumps, sludge sucker kit usage, nitrogen, drain line cleaning agents or tools such as CO2, test instruments, etc. However, items that are acceptable include welding machines, man lifts, specialty ladders that are not typical to service vehicle. If refrigerant is used, Gwinnett County reserves the right to be billed for a full container or by the pound, whichever is the most efficient. For example: technician repairs leak and adds 15lb of refrigerant. If the per lb cost is $45 and the cost of a new drum from supplier is $320, then the County is subject to be billed for $320 plus mark up, and the remaining 10 to 20lb of refrigerant in drum must be turned into Gwinnett County. In addition, if drill bits, gloves, hole saws, Sawzall blades, dust masks, etc. are purchased for a repair, these are considered consumables or tools and are not subject to billing. If a specialty item is needed outside the normal list of repair and installation standards, then purchase of such item must be pre-approved and turned over to Gwinnett County at time of completion of task. Truck stock items are acceptable, however, charge for such items must be in line with customary pricing at vendor, including mark up. Internal company tool rental pricing is acceptable, however these charges must also be in line with or less than equipment/tool rental companies.
BL072-26 Page 26 E. Limitation on Utilization of Personnel
The Contractor will typically be expected to utilize one technician for a routine service call. If the Contractor anticipates using a helper for the repair, it must obtain prior approval from the Support Services Representative prior to committing to the use of the additional staff. The County will withhold payment for any invoice reflecting a helper, where this support did not have prior approval. Staff utilization on larger scale repairs and projects with written authorization from the County shall reflect the staffing levels in the Contractor’s approved proposal.
F. Service Call Charges
As noted above, the County will not pay the hourly labor rate for time to travel to and from the service site or away from the service location to pick up parts and/or materials. Instead, compensation may include one Service Call Charge per service call to cover any travel time.
This amount will be a flat fee charged in lieu of hourly time. Example: Repair personnel shows up on job 9:00 AM checks out problem and discovers that he needs to replace a part that he does not have on his service vehicle. He leaves the job site at 10:00 AM, picks up the part and returns to the job site at 11:30 AM. He completes the repair at 12:30 PM. Billable costs at the hourly rate are from 9:00 – 10:00 and 11:30 – 12:30, and there is one Service Call Charge. If an additional technician or technicians are required to perform the work, there is still only one Service Call Charge.
G. Repairs in Excess of $2,500/Equipment Replacements
If the Contractor expects a repair to exceed $2,500.00, the technician or another Contractor representative shall contact the Support Services Representative prior to initiating the repair and shall provide a written estimate of the repair costs. This estimate shall include a detailed listing of expected labor costs by personnel classification, rate and hours; an itemized description of required parts and their costs; and a schedule for when the work can be performed. This estimate must be approved in writing by the Support Services Representative, and must be retained and submitted by the Contractor to the County with the final Contractor Service Report.
If the Contractor’s repair estimate exceeds 85% of the cost of a major equipment element or a complete unit of the HVAC system, the Contractor shall notify the Support Services Representative of this situation prior to any repair activities.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .