BL049-23 ADD1

976 KB Posted

Attached to
Construction and Maintenance of Water Mains on an
Solicitation number
BL049-23
Issued by
Gwinnett County, Georgia

About this file

BL049-23 ADD1 Addendum

This addendum pertains to a Georgia Department of Water Resources (DWR) contract opportunity for construction and maintenance of water mains. The contract encompasses construction, repair, and scheduled maintenance of water mains including site work, appurtenances, labor, and materials necessary to complete the work. The contract is also utilized to relocate DWR utilities that are in conflict with County and State Department of Transportation projects. Specific details regarding response dates, bidders' meetings, site visits, award dates, and contract term information are not provided in this addendum excerpt.

Without access to the complete addendum content, additional information regarding pricing terms, set-asides, incumbent contractors, funding sources, and other salient contract details cannot be summarized. Contractors should review the full addendum document for any modifications, clarifications, or additions to the original solicitation terms and conditions.

Text of this file

COMPANY NAME

May 04, 2023

ADDENDUM #1

BL049-23, Construction and Maintenance of Water Mains on an Annual Contract

***BID SUBMITTAL DEADLINE HAS BEEN POSTPONED UNTIL MAY 12, 2023***

This Addendum is being issued to provide the following revisions and/or clarifications to the bid documents and answers to the questions received.

I. Revisions:

R1. Make the following changes throughout the Invitation to Bid below:

Submittal date for Construction and Maintenance of Water Mains on an Annual Contract, BL049-23 to be changed from May 09, 2023 to May 12, 2023, no later than 2:50 PM.

R2. Please revise the first sentence of Page 17 (BIDDER’S ACKNOWLEDGEMENT:) NOTE: See Paragraph 14 13 of "Instruction to Bidders" for requirements in completing signature block below and remainder of this page.

R3. Please use the revised Bid schedule attached.

R4. Please remove the Standard General Conditions of the Construction Contract in its entirety, found on pages 55-141. (Total of 86 pages) and replace with the attached General Conditions for Gwinnett County Construction Contracts

R5. Please remove the Section 00800 Supplementary Conditions in its entirety, found on pages 142-157.

(Total of 15 pages).

R6. Please revise the first paragraph of the Bonding and Insurance section language on Page 2 of the Invitation to read.

All Bidders are required to submit a Bid Bond, or a certified check made payable to the Gwinnett County Board of Commissioners in the amount of five percent (5%) of the total amount bid. The Bid Bond or certified check must be enclosed in the envelope with the sealed bid. The successful bidder will be required to furnish a contract Performance Bond and Payment Bond, each up to a sum of $5 million and provide insurance coverage as required by the contract documents. The payment and performance bond amounts are subject to change for each renewal option. It is the intent of Gwinnett County to award this contract to multiple contractors. Each awarded contractor will be provided the required bond amount during the renewal process and will be required to provide bonds for that amount.

II. Questions:

Q1. Bid Item #54 Contingency Cost – Additional Work indicates that we are to bid the percentage mark-up above cost of parts, materials, and equipment (not to exceed 10%). This description does not include labor which is a necessary cost component of any work performed. Please advise how we are to bid labor with only a percentage of mark-up parts, materials, and equipment not to exceed 10%.

A1. Rates for labor and equipment not performed by a sub-contractor will be paid at the current Blue Book rates.

Q2. Bid Item #54 Contingency Cost – Additional Work indicates that we are to bid the percentage mark-up above cost of parts, materials, and equipment (not to exceed 10%). This description does not include subcontract which is sometimes a necessary cost component of the work performed.

Please advise how we are to bid subcontract with only a percentage of mark-up of parts, materials, and equipment not to exceed 10%.

A2. Per Measure and Payment item 54- Contingency Cost- Additional Work, Sub-contract work can be used under this line item. This may include items purchased by contractor in emergency instances or in situations where there is a unique condition during the performance of work.(i.e.… stamped concrete, specialty service, etc.)

Q3. Are the jack & bores described in the bid documents for dirt bores or rock bores?

A3. Dirt Bores. Sections of rock during dirt bores will be covered under the contingency cost line item.

Q4. What limits of depths are we to assume for Bid Item 27, Steel Tunnel Liner 48” Diameter?

A4. Please see the attached revised bid schedule. This line item has been removed from the bid schedule.

Q5. Is blasting allowed to remove rock while hand-tunnelling for Steel Tunnel Liner 48” Diameter?

A5. Please see the attached revised bid schedule. This line item has been removed from the bid schedule.

Q6. Bid Item #6 Rock Excavation cannot be weighed in the field to determine tonnage. Can this bid item be changed to cubic yards since that way it can be measured in the field to determine volume just like the Annual Sewer Bid?

A6. Yes, please see the attached revised bid schedule.

Q7. Can a specification and measurement and payment for Bid Item 14 Hydromulching be provided?

A7. Please see specification 32 92 00 “Turf and Grasses” for hydromulching.

Q8. Will a percentage increase on the Renewal Option be allowed for Bid Item #53 - Traffic Control

Police Officer for bidder to offset bidder’s costs to coordinate this work?

A8. No.

Q9. If actual costs for Bid Item #53 go up outside of our control, how will adjustment to this fixed price be handled during the 4-year renewal period?

A9. If the rate for this line item changes during the life of this contract, pricing will be updated to the new rate.

Q10. What is the proposed amount annually anticipated to spend a year so we can determine workload for crew allocation?

A10. Gwinnett County anticipates spending $4 - 5 million per year.

Q11. Can you add last year bid tab to the addendum?

A11. Please see the attached previous bid tabulation.

Q12. Quoting ARV Assemblies per Gwinnett Detail W16. Detail only provides the mainline size up to a

3” ARV. What assumption should be made for the mainline size for 4”,6”, and 8” ARV?

A12. ARV sizing will be based on engineered calculations at the time of the project.

Q13. How shall Soil removal be handled for payment as larger diameter will have left over material?

A13. Per measure and payment #46, all excavation and backfilling should be included in the unit price for pipe installation.

Q14. How shall poor subgrades be handed for payment. There is no subsurface investigate per specifications. Usually Spoil removal items or such items as Geotextile and 57 are in place

A14. #57 stone has been added as a line item for bedding pipes with poor subgrades. Bedding has been added to the Measure and Payment for installation of ductile iron pipe.

Q15. Bid Item #33, Extension of main using 2” Municipex or equivalent is listed in Bid Form with EA unit. This description is for linear footage of pipe installed. Can the Unit for this bid item be changed to LF like the previous Contract since we can’t quantify the length of the extension?

A15. Yes, this will be changed to LF.

Q16. Bid Item #33, Extension of main using 2” Galvanized is listed in Bid Form with EA unit. This description is for linear footage of pipe installed. Can the Unit for this bid item be changed to LF like the previous Contract since we can’t quantify the length of the extension?

A16. Yes. This will be changed to LF.

III. Attachments:

• Revised Bid Schedule

• General Conditions for Gwinnett County Construction Contracts

• Previous Bid Tabulation

All bidders shall acknowledge receipt of this addendum by inserting its number and date in the Bid Form.

Failure to do so may subject bidder to disqualification. This addendum forms a part of the Contract Documents.

REVISED BID SCHEDULE

BL049-23

COMPANY NAME _________________________________________________________________________________________

BID

ITEM #

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

1 02 32 19 Exploratory Excavation 50 HR $ $

2 02 42 11 Debris Removal Per Truck 20 EA $ $

3 03 30 00 Cast-in-Place Concrete

Class A 10 CY $ $

Class B 50 CY $ $

4 31 11 00 Clearing and Grubbing 1 ACRE $ $

5 31 13 11 Orange Barrier Fence 1,000 LF $ $

6 31 23 00 Rock Excavation 500 CY $ $

7 31 23 00 Classified Stone

Crusher Run 200 TON $ $

#57 Stone 20 TON $ $

8 31 25 00 Erosion and Sedimentation Control

Anionic Polyacrylamide 2 GAL $ $

Hay Bales 100 EA $ $

Inlet Sediment Trap 20 EA $ $

Jute Matting or Excelsior Netting 1,000 SY $ $

Rock Check Dam 5 EA $ $

Silt Fence Type ‘A’ 2,500 LF $ $

Silt Fence Type ‘C’ 2,500 LF $ $

Dry Straw or Hay Mulch 2,500 TN $ $

Temporary Seeding and Mulch 2,500 SY $ $

9 31 37 00 Rip Rap 100 SY $ $

10 32 12 16 Asphalt Paving 500 SY $ $

11 32 16 13 Sidewalk Restoration 200 LF $ $

COMPANY NAME _________________________________________________________________________________________

ITEM #

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

12 32 16 13 Curb/Combination Curb & Gutter Restoration 200 LF $ $

13 32 92 00 Permanent Seeding 2,500 SY $ $

14 32 92 00 Hydromulching 5,000 SY $ $

15 32 92 00 Sod Removal and Replacement 5,000 SY $ $

16 32 92 00 Topsoil 100 CY $ $

17 32 93 43 Tree Replacement

Hardwoods, 2” 5 EA $ $

Pines, 2” 5 EA $ $

Riverside, 2” 5 EA $ $

18 33 05 16.13 Adjust Manhole Barrel 1 VF $ $

19 33 05 16.13 Adjust Manhole Cone 1 EA $ $

20 33 05 16.13 Adjust Manhole Frame/Cover to Grade

1 Vertical ft. or less, Non-pavement 1 EA $ $

1 Vertical ft. or less, pavement 1 EA $ $

21 33 05 16.13 Air Release Manhole Vent Adjustment 1 EA $ $

22 33 05 16.13 Furnish and Install Precast Concrete Vaults with Bilco Aluminum Hatches (or equivalent):

5’ x 9’ x 6’ Vault 1 EA $ $

12’ x 6’ x 6’ Vault 1 EA $ $

23 33 05 16.13 Adjust /Modify Vault Top 1 EA $ $

24 33 05 23.16 Steel Casing, Bore & Jack Installation

8” Diameter 100 LF $ $

12” Diameter 100 LF $ $

16” Diameter 500 LF $ $

20” Diameter 500 LF $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

24” Diameter 500 LF $ $

30” Diameter 200 LF $ $

36” Diameter 200 LF $ $

48” Diameter 200 LF $ $

60” Diameter 200 LF $ $

25 33 05 23.16 Steel Casing, Open Cut Installation

8” Diameter 100 LF $ $

12” Diameter 100 LF $ $

16” Diameter 500 LF $ $

20” Diameter 500 LF $ $

24” Diameter 500 LF $ $

30” Diameter 200 LF $ $

36” Diameter 200 LF $ $

48” Diameter 200 LF $ $

60” Diameter 200 LF $ $

26 33 05 23.16 Uncased Boring, For Main Pipe Size

4” Diameter 100 LF $ $

6” Diameter 300 LF $ $

8” Diameter 500 LF $ $

10” Diameter 500 LF $ $

12” Diameter 100 LF $ $

16” Diameter 100 LF $ $

27 33 11 13.05 Ductile Iron Pipe

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

4” Diameter 500 LF $ $

6” Diameter 2,500 LF $ $

8” Diameter 10,000 LF $ $

10” Diameter 1,000 LF $ $

12” Diameter 2,500 LF $ $

14” Diameter 1,000 LF $ $

16” Diameter 2,500 LF $ $

20” Diameter 1,000 LF $ $

24” Diameter 500 LF $ $

30” Diameter 500 LF $ $

36” Diameter 500 LF $ $

48” Diameter 500 LF $ $

54” Diameter 500 LF $ $

28.A 33 11 13.05 Upgrade DIP to pressure Class 350 100 LF $ $

28.B 33 11 13.05 Upgrade DIP to DI restrained joint pipe 100 LF $ $

29 33 11 13.05 Lower Existing Ductile Iron Pipe in Place Labor and Equipment Only

6” Diameter 100 LF $ $

8” Diameter 100 LF $ $

10” Diameter 100 LF $ $

12” Diameter 100 LF $ $

14” Diameter 100 LF $ $

16” Diameter 100 LF $ $

30 33 11 13.05 Ductile Iron Fittings 5 TON $ $

31 33 11 13.05 Polyethylene Encasement 1,000 LF $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

32 33 11 13.07 Steel Pipe

12” Diameter 500 LF $ $

24” Diameter 500 LF $ $

36” Diameter 500 LF $ $

48” Diameter 500 LF $ $

33 33 12 13 Water Service Connections

¾” – 1” Long Side Service Connections 40 EA $ $

1 ½” – 2” Long Side Service Connection 40 EA $ $

¾” – 1” Short Side Service Connection 40 EA $ $

1 ½” – 2” Short Side Service Connections 40 EA $ $

¾” – 1” Extra-long Service Line Installation > 5 lanes 10 EA $ $

1 ½” – 2” Extra-long Service Line Installation > 5 lanes 10 EA $ $

Extension of main using 2” Municipex or equivalent 1,000 LF $ $

Extension of main using 2” Galvanized 100 LF $ $

Relocate Existing Meter 5 EA $ $

Lower Existing Service Line 5 EA $ $

Salvage Meter 5 EA $ $

Abandon Existing Service at Main 5 EA $ $

34 33 12 13 Relocate Large Meters/Check Valves, Vaults, Complete (Labor, Equipment and Materials other than pipe and fittings)

3” & 4” Meters 5 EA $ $

6” & 8” Meters 1 EA $ $

35 33 12 13 Change Out Existing Meter, 5/8” to ¾”, Labor and Equipment 1 EA $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

36 33 12 13

Install Meter to Include: Assembly as necessary, Tap on Main, Service line from main to meter location and appropriate valves installed at meter and meter boxes. Gwinnett County to Furnish meters and boxes.

¾” Meter 10 EA $ $

1” Meter 10 EA $ $

1 ½” Meter 10 EA $ $

2” Meter 10 EA $ $

37.A 33 12 13 1” Tap on Main

2” or 4” Diameter 5 EA $ $

6” or 8” Diameter 5 EA $ $

10”, 12”, 14”, or 16” Diameter 5 EA $ $

37.B 33 12 13 2” Tap on Main

2” or 4” Diameter 5 EA $ $

6” or 8” Diameter 5 EA $ $

10”, 12”, 14”, or 16” Diameter 5 EA $ $

38.A 33 12 16 Gate Valves

2” Diameter 2 EA $ $

4” Diameter 2 EA $ $

6” Diameter 40 EA $ $

8” Diameter 40 EA $ $

10” Diameter 10 EA $ $

12” Diameter 10 EA $ $

38.B 33 12 16 Butterfly Valves

12” Diameter 10 EA $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

16” Diameter 10 EA $ $

24” Diameter 6 EA $ $

30” Diameter 2 EA $ $

36” Diameter 2 EA $ $

48” Diameter 2 EA $ $

54” Diameter 1 EA $ $

38.C 33 12 16 Line Stop Type Valve

6” Diameter 2 EA $ $

8” Diameter 2 EA $ $

10” Diameter 2 EA $ $

12” Diameter 2 EA $ $

16” Diameter 2 EA $ $

38.D 33 12 16 Insertion Type Valve

6” Diameter 5 EA $ $

8” Diameter 5 EA $ $

10” Diameter 2 EA $ $

12” Diameter 2 EA $ $

38.E 33 12 16 Tapping Sleeves and Valves

6” x 6” 2 EA $ $

8” x 6” 2 EA $ $

8” x 8” 4 EA $ $

10” x 6” 1 EA $ $

10” x 8” 1 EA $ $

10” x 10” 1 EA $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

12” x 6” 1 EA $ $

12” x 8” 1 EA $ $

12” x 10” 1 EA $ $

12” x 12” 1 EA $ $

16” x 6” 1 EA $ $

16” x 8” 1 EA $ $

16” x 10” 1 EA $ $

16” x 12” 1 EA $ $

16” x 16” 1 EA $ $

20” x 6” 1 EA $ $

20” x 8” 1 EA $ $

20” x 10” 1 EA $ $

20” x 12” 1 EA $ $

20” x 16” 1 EA $ $

20” x 20” 1 EA $ $

24” x 6” 1 EA $ $

24” x 8” 1 EA $ $

24” x 10” 1 EA $ $

24” x 12” 1 EA $ $

24” x 16” 1 EA $ $

24” x 20” 1 EA $ $

24” x 24” 1 EA $ $

30” x 6” 1 EA $ $

30” x 8” 1 EA $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

30” x 10” 1 EA $ $

30” x 12” 1 EA $ $

30” x 16” 1 EA $ $

30” x 20” 1 EA $ $

30” x 24” 1 EA $ $

30” x 30” 1 EA $ $

36” x 6” 1 EA $ $

36” x 8” 1 EA $ $

36” x 10” 1 EA $ $

36” x 12” 1 EA $ $

36” x 16” 1 EA $ $

36” x 20” 1 EA $ $

36” x 24” 1 EA $ $

36” x 30” 1 EA $ $

36” x 36” 1 EA $ $

48” x 6” 1 EA $ $

48” x 8” 1 EA $ $

48” x 10” 1 EA $ $

48” x 12” 1 EA $ $

48” x 16” 1 EA $ $

39 33 12 16 Wet Cut Ins, All Depths

2” 5 EA $ $

4” 5 EA $ $

6” 5 EA $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

8” 5 EA $ $

10” 5 EA $ $

12” 5 EA $ $

16” 2 EA $ $

18” 2 EA $ $

20” 2 EA $ $

24” 2 EA $ $

30” 2 EA $ $

36” 2 EA $ $

48” 2 EA $ $

54” 2 EA $ $

72” 2 EA $ $

40 33 12 16.12 Air Release and Vacuum Valve Assemblies/Valve Installation

2” 2 EA $ $

3” 2 EA $ $

4” 2 EA $ $

6” 2 EA $ $

8” 2 EA $ $

41 33 12 19 Fire Hydrant Assembly 40 EA $ $

42 33 12 19.81 Relocation and/or Reconnection of Existing Fire Hydrants 5 EA $ $

43 33 12 19.81 Adjust Existing Fire hydrants 5 VF $ $

44 33 12 19.81 Salvage Existing Fire Hydrants 40 EA $ $

45 33 12 19.81 Adjust Valve Box 40 EA $ $

46 34 71 00 Driveway Cut Restoration

Concrete 300 SY $ $

COMPANY NAME _________________________________________________________________________________________

SPECIFICATION

SECTION

DESCRIPTION

APPROX.

ANNUAL QTY

UNIT PRICE TOTAL PRICE

Gravel 300 SY $ $

Asphalt 300 SY $ $

47 34 71 00 Pavement Cut Restoration

Type A 2,500 SY $ $

Type B 1,000 SY $ $

Type C 1,000 SY $ $

48 34 71 00 Asphalt Milling 1,000 SY $ $

49 34 71 00 Traffic Striping 1,000 LF $ $

50 34 71 00 Traffic Signal Loop 100 EA $ $

51 34 71 00 Guard Rail Removal/Replace 100 LF $ $

52 34 41 16.10 Traffic Control Police Officer 25 HR $55.00 $1,375.00

53 Contingency Cost – Additional Work

State Percentage Mark-up Charge above Cost of Parts, Materials, and Equipment(not to exceed 10%)

$25,000.00 ____________ % $ *

BID TOTAL $

*Calculate Total Price by adding $25,000.00 + mark-up.

Gwinnett County requires pricing to remain firm for the duration of the initial term of the contract. Failure to hold firm pricing for the initial term of the contract will be sufficient cause for Gwinnett County to declare bid non-responsive and the bid will not be considered for award. Contract to begin July 16, 2023 or upon award.

COMPANY NAME _________________________________________________________________________________________

Unless otherwise noted, quoted prices will remain firm for four (4) additional 12-month periods. If a percentage increase/decrease will be a part of a renewal option, please note this in the space provided together with an explanation

Renewal Option 1: % Increase / Decrease circle one

Renewal Option 2: % Increase / Decrease circle one

Renewal Option 3: % Increase / Decrease circle one

Renewal Option 4: % Increase / Decrease circle one

COMPANY NAME

STATE OF GEORGIA

COUNTY OF GWINNETT

GENERAL CONDITIONS

FOR GWINNETT COUNTY CONSTRUCTION CONTRACTS

GC-1 FAMILIARITY WITH SITE

Execution of this agreement by the Contractor is a representation that the Contractor has visited the site, has become familiar with the local conditions under which the work is to be performed, and has correlated personal observations with the requirements of this agreement.

GC-2 CONTRACT DOCUMENTS

This agreement consists of Gwinnett County's request for proposals, instructions to bidders, Contractor's proposal, construction contract, Performance Bond, Payment Bond, general conditions, special provisions, specifications, plans, drawings, addenda, and written change orders.

GC-3 DEFINITIONS

The following terms as used in this agreement are defined as follows:

Change Order - a written order to the Contractor, prepared by the Engineer and issued by the County for changes in the work within the general scope of the contract documents, adjustment of the contract price, extension of the contract time, or reservation of determination of a time extension.

County - Gwinnett County, Georgia, a political subdivision of the State of Georgia, acting by and through the Chairman of its Board of Commissioners.

Day - a calendar day of twenty-four hours lasting from midnight of one day to midnight the next day.

Notice to Proceed - written communication issued by the County to the Contractor authorizing it to proceed with the work and establishing the date of commencement and completion of the work.

Substantial Completion - the date certified by the engineer when all or a part of the work, identified in the engineer's certification, is sufficiently completed in accordance with the requirements of the contract documents so that the identified portion of the work can be utilized for the purposes for which it is intended.

Work - all of the services specified, indicated, shown or contemplated by the contract documents, and furnishing by the Contractor of all materials, equipment, labor, methods, processes, construction and manufacturing materials and equipment, tools, plans, supplies, power, water, transportation and other things necessary to complete such services in accordance with the contract documents to ensure a functional and complete facility.

GC-4 CODES

All codes, specifications, and standards referenced in the contract documents shall be the latest additions, amendments and revisions of such referenced standards in effect as of the date of the request for proposals for this contract.

GC-5 REVIEW OF CONTRACT DOCUMENTS

Before making its proposal to the County, and continuously after the execution of the agreement, the Contractor shall carefully study and compare the contract documents and shall at once report to the engineer any error, ambiguity, inconsistency or omission that may be discovered, including any requirement which may be contrary to any law, ordinance, rule, or regulation of any public authority bearing on the performance of the work. By submitting its proposal, the Contractor agrees that the contract documents, along with any supplementary written instructions issued by or through the engineer that have become a part of the contract documents appear accurate, consistent and complete insofar as can be reasonably determined. If the Contractor has reported in writing any error, inconsistency, or omission to the County, has properly stopped the effected work until instructed to proceed, and has otherwise followed the instructions of the engineer, the Contractor shall not be liable to the County for any damage resulting from any such error, inconsistency, or omission in the contract documents. The Contractor shall not perform any portion of the work without the contract documents, approved plans, specifications, products and data, or samples for such portion of the work.

GC-6 STRICT COMPLIANCE

No observation, inspection, test or approval of the County or engineer shall relieve the Contractor from its obligation to perform the work in strict conformity with the contract documents.

GC-7 APPLICABLE LAW

All applicable State laws, County ordinances, and rules and regulations of all authorities having jurisdiction over the construction of the project shall apply to this agreement. All work performed within the right of way of the Georgia Department of Transportation shall be in accordance with DOT regulations, policies and procedures. The Contractor shall comply with all laws, ordinances, rules and regulations bearing on the conduct of the work as specified and the Contractor agrees to indemnify and hold harmless the County, its officers, agents and employees, as well as the engineer, against any claim or liability arising from or based on the violation of any law, ordinance, regulation, order or decree affecting the conduct of the work, whether occasioned by the Contractor, his agents or employees.

GC-8 PERMITS & LICENSES

All permits and licenses necessary for the work shall be secured and paid for by the Contractor. If any permit, license or certificate expires or is revoked, terminated, or suspended as a result of any action on the part of the Contractor, the Contractor shall not be entitled to additional compensation or time.

GC-9 TAXES

The Contractor shall pay all sales, retail, occupational, service, excise, old age benefit and unemployment compensation taxes, consumer, use and other similar taxes, as well as any other taxes or duties on the materials, equipment, and labor for the work provided by the Contractor which are legally enacted by any municipal, county, state or federal authority, department or agency at the time bids are received, whether or not yet effective. The Contractor shall maintain records pertaining to such taxes and levies as well as payment thereof and shall make the same available to the County at all reasonable times for inspection and copying.

GC-10 DELINQUENT CONTRACTORS

The County shall not pay any claim, debt, demand or account whatsoever to any person firm or corporation who is in arrears to the County for taxes. The County shall be entitled to a counterclaim and offset for any such debt in the amount of taxes in arrears, and no assignment or transfer of such debt after the taxes become due shall affect the right of the County to offset any taxes owed against said debt.

GC-11 LIEN WAIVERS

The Contractor shall furnish the County with evidence that all persons who have performed work or furnished materials pursuant to this agreement have been paid in full prior to submitting its demand for final payment pursuant to this agreement. In the event that such evidence is not furnished, the County may retain sufficient sums necessary to meet all lawful claims of such laborers and materialmen. The County assumes no obligation nor in any way undertakes to pay such lawful claims from any funds due or that may become due to the Contractor.

GC-12 MEASUREMENT

All items of work to be paid for per unit of measurement shall be measured and certified by the Engineer.

GC-13 ASSIGNMENT

The Contractor shall not assign any portion of this agreement or moneys due therefrom without the prior written consent of the County. The Contractor shall retain personal control and shall provide personal attention to the fulfillment of its obligations pursuant to this agreement.

GC-14 FOREIGN CONTRACTORS

In the event that the Contractor is a foreign corporation, partnership, or sole proprietorship, the Contractor hereby irrevocably appoints the Secretary of State of Georgia as its agent for service of all legal process for the purpose of this contract only.

GC-15 INDEMNIFICATION

To the fullest extent permitted by law, the Contractor shall, at his sole cost and expense, indemnify, defend, satisfy all judgments, and hold harmless the County, the engineer, and their agents and employees from and against all claims, damages, actions, judgments, costs, penalties, liabilities, losses and expenses, including, but not limited to, attorney's fees arising out of or resulting from the performance of the work, provided that any such claim, damage, action, judgment, cost, penalty, liability, loss or expense (1) is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the work itself) including the loss of use resulting therefrom, and (2) is caused in whole or in part by any act or omission of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless whether such claim is caused in part by a party indemnified hereunder. Such obligation shall not be construed to negate, abridge or otherwise reduce any of the rights or obligations of indemnity which would otherwise exist as to any party or person described in this agreement. In any and all claims against the County, the engineer, or any of their agents or employees by any employee of the Contractor, any subcontractor, anyone directly or indirectly employed by any of them, or anyone for whose acts any of them may be liable, the indemnification obligation contained herein shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for the Contractor or any subcontractor under Worker's Compensation Acts, disability benefit acts, or other employee benefit acts.

GC-16 SUPERVISION OF WORK

The Contractor shall supervise and direct the work using the Contractor's best skill and attention. The Contractor shall be solely responsible for all construction methods and procedures and shall coordinate all portions of the work pursuant to the contract subject to the overall coordination of the engineer. All work pursuant to this agreement shall be performed in a skillful and workmanlike manner.

GC-17 RESPONSIBILITY FOR WORK

The Contractor shall not be relieved from the Contractor's obligations to perform the work in accordance with the contract documents by the activities or duties of the engineer, including inspections, tests or approvals required or performed pursuant to this agreement.

GC-18 RESPONSIBILITY FOR ACTS OF EMPLOYEES

The Contractor shall be responsible to the County for the acts and omissions of its employees, subcontractors, and agents as well as any other persons performing work pursuant to this agreement.

All areas within the limits of the Project which are determined by the Engineer to be unnecessarily damaged, due either directly or indirectly to the process of construction, shall be responsibility of the Contractor to correct and repair. This is not a payment item and shall be done without additional compensation.

GC-19 PAYMENT FOR LABOR AND MATERIALS

Unless otherwise provided in this agreement, the Contractor shall provide and pay for all labor, materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation, and other facilities and services necessary for the execution and completion of the work.

GC-20 DISCIPLINE ON WORK SITE

The Contractor shall enforce strict discipline and good order among its employees and subcontractors at all times during the performance of the work. The Contractor shall not employ any subcontractor who is not skilled in the task assigned to it. The engineer may, by written notice, require the Contractor to remove from the work any subcontractor or employee deemed by the engineer to be incompetent.

GC-21 HOURS OF OPERATION

All work at the construction site shall be performed during regular business hours, except upon the engineer's prior written consent to other work hours.

GC-22 FAMILIARITY WITH WORK CONDITIONS

The Contractor shall take all steps necessary to ascertain the nature and location of the work and the general and local conditions, which may affect the work or the cost thereof. The Contractor's failure to fully acquaint itself with the conditions which may affect the work, including, but not limited to conditions relating to transportation, handling, storage of materials, availability of labor, water, roads, weather, topographic and subsurface conditions, other separate contracts to be entered into by the County relating to the project which may affect the work of the Contractor, applicable provisions of law, and the character and availability of equipment and facilities necessary prior to and during the performance of the work shall not relieve the Contractor of its responsibilities pursuant to this agreement and shall not constitute a basis for an equitable adjustment of the contract terms. The County assumes no responsibility for any understandings or representations concerning conditions of the work made by any of its officers, agents, or employees prior to the execution of this agreement.

GC-23 RIGHT OF ENTRY

The County reserves the right to enter the site of the work by such agent as it may elect for the purpose of inspecting the work or installing such collateral work as the County may desire.

GC-24 NOTICES

Any notice, order, instruction, claim or other written communication required pursuant to this agreement shall be deemed to have been delivered or received as follows:

(1) Upon personal delivery to the Contractor, it’s authorized representative, or the engineer on behalf of the County. Personal delivery may be accomplished by in-person hand delivery or bona fide overnight express service.

(2) Three days after depositing in the United States mail a certified letter addressed to the Contractor, the County, or the engineer. For purposes of mailed notices, the County's mailing address shall be 75 Langley Drive, Lawrenceville, Georgia 30046. The Contractor's mailing address shall be the address stated in its proposal, and the engineer's mailing address shall be its address listed in the Notice to Begin Work.

GC-25 SAFETY

The Contractor shall take all reasonable precautions for the safety of all persons and property associated with the work, and the Contractor shall erect and maintain, as required by existing conditions and the progress of the work, all reasonable safeguards for the safety and protection of persons in the vicinity of the project.

GC-26 BLASTING AND EXCAVATION

The Contractor acknowledges that it is fully aware of the contents and requirements of O.C.G.A. §25-9-1 through §25-9-12 concerning blasting and excavation near underground gas pipes and facilities and shall fully comply therewith.

GC-27 HIGH VOLTAGE LINES

The Contractor acknowledges that it is fully aware of the contents and requirements O.C.G.A.§46-3-30 through §46-3-39 concerning safeguards against contact with high voltage lines, and the Contractor shall fully comply with said provisions.

GC-28 SCAFFOLDING AND STAGING

The Contractor acknowledges that it is the person responsible for employing and directing others to perform labor within the meaning of O.C.G.A. §34-1-1 and agrees to comply with said provisions.

GC-29 CLEAN-UP

The Contractor shall clean up all refuse, rubbish, scrap materials, and debris caused by its operations to the end that the site of the work shall present a neat, orderly and workmanlike appearance at all times.

GC-30 PROTECTION OF WORK

The Contractor shall be responsible for maintenance and protection of the work until final completion of this agreement and acceptance of the work as defined herein. Any portion of the work suffering injury, damage or loss shall be considered defective and shall be corrected or replaced by the Contractor without additional cost to the County.

GC-31 REJECTED WORK

The Contractor shall promptly remove from the project all work rejected by the engineer for failure to comply with the contract documents and the Contractor shall promptly replace and re-execute the work in accordance with the contract documents and without expense to the County. The Contractor shall also bear the expense of making good all work of other Contractors destroyed or damaged by such removal or replacement.

GC-32 DEFECTIVE WORK

If the Contractor defaults or neglects to carry out any portion of the work in accordance with the contract documents, and fails within three days after receipt of written notice from the County or the engineer to commence and continue correction of such default or neglect with diligence and promptness, the County or the engineer may, after three days following receipt by the Contractor of an additional written notice and without prejudice to any other remedy the County may have, make good such deficiencies and complete all or any portion of any work through such means as the County may select, including the use of a new Contractor. In such case, an appropriate change order shall be issued deducting from the payments then or thereafter due the Contractor the cost of correcting such deficiencies. In the event the payments then or thereafter due the Contractor are not sufficient to cover such amount, the Contractor shall pay the difference to the County on demand.

GC-33 NEW MATERIALS

The Contractor warrants to the County that all materials and equipment furnished under this contract will be new unless otherwise specified, and the Contractor further warrants that all work will be of good quality, free from faults and defects, and in conformance with the contract documents. The warranty set forth in this paragraph shall survive final acceptance of the work.

GC-34 CONTRACTOR'S WARRANTY

If within one year after the date of substantial completion and final acceptance of the work by the County, or within such longer period of time as may be prescribed by law or by the term of any applicable special warranty required by the contract documents, any of the work is found to be defective or not in accordance with the contract documents, the Contractor shall correct such work promptly after receipt of written notice from the County to do so. This obligation shall survive both final payment for the work and termination of the contract.

GC-35 ASSIGNMENT OF MANUFACTURERS' WARRANTIES

Without limiting the responsibility or liability of the Contractor pursuant to this agreement, all warranties given by manufacturers on materials or equipment incorporated in the work are hereby assigned by the Contractor to the County. If requested, the Contractor shall execute formal assignments of said manufacturer's warranties to the County. All such warranties shall be directly enforceable by the County.

GC-36 WARRANTIES IMPLIED BY LAW

The warranties contained in this agreement, as well as those warranties implied by law, shall be deemed cumulative and shall not be deemed alternative or exclusive. No one or more of the warranties contained herein shall be deemed to alter or limit any other.

GC-37 STOP WORK ORDERS

In the event that the Contractor fails to correct defective work as required by the contract documents or fails to carry out the work in accordance with contract documents, the County, or the engineer, in writing, may order the Contractor to stop work until the cause for such order has been eliminated. This right of the County or engineer to stop work shall not give rise to any duty on the part of the County or the engineer to execute this right for the benefit of the Contractor or for any other person or entity.

GC-38 TERMINATION FOR CAUSE

If the Contractor is adjudged bankrupt, makes a general assignment for the benefit of creditors, suffers the appointment of a receiver on account of its insolvency, or fails to supply sufficient properly skilled workers, materials, fails to make prompt payment to subcontractors or materialmen, disregards laws, ordinances, rules, regulations, or orders of any public authority having jurisdiction, or is otherwise guilty of a material violation of this agreement and fails within seven days after receipt of written notice to commence and continue correction of such default, neglect, or violation with diligence and promptness, the County may, after ten days following receipt by the Contractor of an additional written notice and without prejudice to any other remedy the County may have, terminate the employment of the Contractor and take possession of the site as well as all materials, equipment, tools, construction equipment and machinery thereon. The County may finish the work by whatever methods the County deems expedient. In such case, the Contractor shall not be entitled to receive any further payment until the work is completed. If the unpaid balance of the contract price exceeds the cost of completing the work, such excess shall be paid to the Contractor. If such costs exceed the unpaid balance, the Contractor shall pay the difference to the County on demand. This obligation for payment shall survive the termination of the contract. Termination of this agreement pursuant to this paragraph may result in disqualification of the Contractor from bidding on future County contracts.

GC-39 TERMINATION FOR CONVENIENCE

The County may, at any time upon 30 days written notice to the Contractor, terminate the whole or any portion of the work for the convenience of the County. Said termination shall be without prejudice to any right or remedy of the County provided herein. In addition, in the event this agreement has been terminated due to the default of the Contractor, and if it is later determined that the Contractor was not in default pursuant to the provisions of this agreement at the time of termination, then such termination shall be considered a termination for convenience pursuant to this paragraph.

GC-40 TERMINATION FOR CONVENIENCE - PAYMENT

In the event that the County terminates this agreement for the convenience of the County, the County shall only be liable to the Contractor for those costs reimbursable to the Contractor plus a mark-up of ten percent on the actual fully accounted cost recovered pursuant to this paragraph. In the event that it appears that the Contractor would have sustained a loss on the entire contract had it been completed, no profit shall be included or allowed hereunder and an appropriate adjustment shall be made reducing the amount of settlement to reflect the indicated rate of loss. In the event of termination for the convenience of the County, the County shall pay the Contractor the following amounts determined by the engineer:

A. An amount for supplies, services, or property accepted by the County for which payment has not previously been made. The price to be paid for these items shall be equivalent to the aggregate price for such supplies or services computed in accordance with the price specified in this agreement appropriately adjusted for any saving of freight or other charges; and

B. The total of:

(1) The costs incurred in the performance of the work terminated, including initial costs and preparatory expenses allocable thereto, but exclusive of any costs attributable to supplies or services previously paid;

(2) The costs of settling and paying claims arising pursuant to the termination of the work under said contracts or orders which are properly chargeable to the terminated portion of the contract (exclusive of the amounts paid or payable on account of completed items or equipment delivered or services furnished by a subcontractor or vendor prior to the effective date of the notice of termination, which amounts shall be included in the costs payable pursuant to (A); and

(3) The reasonable costs of settlement, including accounting, legal, clerical, and other expenses reasonable and necessary for the preparation of settlement claims and supporting data with respect to the terminated portion of the contract and for the termination and settlement of subcontracts thereunder, together with reasonable storage, transportation, and other costs incurred in connection with the protection or disposition of property allocable to this agreement.

GC-41 TERMINATION FOR CONVENIENCE - PAYMENT LIMITATIONS

In the event of termination for the convenience of the County, the total sum to be paid to the Contractor shall not exceed the contract price as reduced by the amount of payments otherwise made, by the contract price for work not terminated, and as otherwise permitted by the contract. Except for normal spoilage, and except to the extent that the County shall have otherwise expressly assumed the risk of loss, there shall be excluded from the amounts payable to the Contractor the fair value, as determined by the engineer, of property which is destroyed, lost, stolen or damaged so as to become undeliverable to the County or to another buyer.

GC-42 COST TO CURE

If the County terminates the whole or any part of the work pursuant to this agreement, then the County may procure upon such terms and in such manner as the engineer may deem appropriate, supplies or services similar to those so terminated, and the Contractor shall be liable to the County for any excess costs for such similar supplies or services. The Contractor shall continue the performance of this agreement to the extent not terminated hereunder.

GC-43 ATTORNEY'S FEES

Should the Contractor default pursuant to any of the provisions of this agreement, the Contractor and its surety shall pay to the County such reasonable attorney's fees as the County may expend as a result thereof and all costs, expenses, and filing fees incidental thereto.

GC-44 CONTRACTOR'S RESPONSIBILITIES UPON TERMINATION

After receipt of a notice of termination from the County, and except as otherwise directed by the engineer, the Contractor shall:

1. Stop work under the contract on the date and to the extent specified in the notice of termination;

2. Place no further orders or subcontracts for materials, services or facilities, except as may be necessary for completion of such portion of the work under the agreement as is not terminated;

3. Terminate all orders and subcontracts to the extent that they relate to the performance of work terminated by the notice of termination;

4. Assign to the County in the manner, at the times, and to the extent directed by the engineer, all of the rights, title and interest of the Contractor under the orders and subcontracts so terminated, in which case the County shall have the right, at its discretion, to settle or pay any and all claims arising out of the termination of such orders or subcontracts;

5. Settle all outstanding liabilities and all claims arising out of such termination of orders and subcontracts, with the approval or ratification of the engineer, to the extent the engineer may require, which approval or ratification shall be final for all purposes;

6. Transfer title and deliver to the entity or entities designated by the County, in the manner, at the times, and to the extent, if any, directed by the engineer, and to the extent specifically produced or specifically acquired by the Contractor for the performance of such portion of the work as has been terminated:

(a) The fabricated or unfabricated parts, work, and progress, partially completed supplies, and equipment, materials, parts, tools, dyes, jigs, and other fixtures, completed work, supplies, and other material produced as a part of or acquired in connection with the performance of the work terminated by the notice of termination; and

(b) The completed or partially completed plans, drawings, information, and other property to the work.

7. Use its best efforts to sell in the manner, at the times, to the extent, and at the prices directed or authorized by the engineer, any property described in Section 6 of this paragraph, provided, however, that the Contractor shall not be required to extend credit to any buyer and further provided that the proceeds of any such transfer or disposition shall be applied in reduction of any payments to be made by the County to the Contractor pursuant to this agreement.

8. Complete performance of such part of the work as shall not have been terminated by the notice of termination; and

9. Take such action as may be necessary, or as the engineer may direct, for the protection and preservation of the property related to the agreement which is in the possession of the Contractor and in which the County has or may acquire an interest.

GC-45 RECORDS

The Contractor shall preserve and make available to the County all of its records, books, documents and other evidence bearing on the costs and expenses of the Contractor and any subcontractor pursuant to this agreement upon three days advance notice to the Contractor.

GC-46 DEDUCTIONS

In arriving at any amount due the Contractor pursuant to the terms of this agreement, there shall be deducted all liquidated damages, advance payments made to the Contractor applicable to the termination portion of the contract, the amount of any claim which the County may have against the Contractor, the amount determined by the engineer to be necessary to protect the County against loss due to outstanding potential liens or claims, and the agreed price of any materials acquired or sold by the Contractor and not otherwise recovered by or credited to the County.

GC-47 REIMBURSEMENT OF THE COUNTY

In the event of termination, the Contractor shall refund to the County any amount paid by the County to the Contractor in excess of the costs reimbursable to the Contractor.

GC-48 TERMINATION FOR CONVENIENCE - DELAY

The Contractor shall be entitled to only those damages and that relief from termination by the County as specifically set forth in this agreement. The County or the engineer may issue a written order requiring the Contractor to suspend, delay or interrupt all or any part of the work for such period of time as the County may determine to be appropriate for the convenience of the County. If the performance of the work is interrupted for an unreasonable period of time by an act of the County or engineer in the administration of this agreement, an equitable adjustment shall be made for any increase in the Contractor's costs of performance and any increase in the time required for performance of the work necessarily caused by the unreasonable suspension, delay, or interruption. Any equitable adjustment shall be reduced to writing and shall constitute a modification to this agreement. In no event, however, shall an equitable adjustment be made to the extent that performance of this agreement would have been suspended, delayed or interrupted by any other cause, including the fault or negligence of the Contractor. No claim for an equitable adjustment pursuant to this paragraph shall be permitted before the Contractor shall have notified the engineer in writing of the act or failure to act involved, and no claim shall be allowed unless asserted in writing to the engineer within ten days after the termination of such suspension, delay or interruption.

GC-49 COMMENCEMENT AND DURATION OF WORK

The Contractor shall commence work pursuant to this agreement within ten days of mailing or delivery of written notice to proceed by the County. The Contractor shall diligently prosecute the work to completion within the time specified, therefore. The capacity of the Contractor's construction and manufacturing equipment and plan, sequence and method of operation and forces employed, including management and supervisory personnel, shall be such as to ensure completion of the work within the specified time. The Contractor and County hereby agree that the contract time for completion of the work is reasonable taking into consideration the average climatic conditions prevailing in the locality of the work.

GC-50 TIME OF THE ESSENCE

All time limits stated in this agreement are of the essence of this contract.

GC-51 IMPACT DAMAGES

Except as specifically provided pursuant to a stop work order or change order, the Contractor shall not be entitled to payment or compensation of any kind from the County for direct or indirect or impact damages including, but not limited to, costs of acceleration arising because of delay, disruption, interference or hindrance from any cause whatsoever whether such delay, disruption, interference or hindrance is reasonable or unreasonable, foreseeable or unforeseeable, or avoidable, provided, however, that this provision shall not preclude the recovery of damages by the Contractor for hindrances or delays due solely to fraud or bad faith on the part of the County its agents or employees. The Contractor shall be entitled only to extensions in the time required for performance of the work as specifically provided in the contract.

GC-52 DELAY

The Contractor may be entitled to an extension of the contract time, but not an increase in the contract price, for delays arising from unforeseeable causes beyond the control and without the fault or negligence of the Contractor or its subcontractors for labor strikes, acts of God, acts of the public enemy, acts of the state, federal or local government in its sovereign capacity, by acts of another separate contractor, or by an act of neglect of the County with the engineer.

GC-53 INCLEMENT WEATHER

The Contractor shall not be entitled to an extension of the contract…

This is the start of the file's text. The full file is on GovTribe.

Other files

File Type Posted
BL049-23 INV —
Award Information —
BL049-23 ADD3 —
BL049-23 ADD2 —

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .