About this file

This is Addendum #1 to bid solicitation BL020-26 issued by the Gwinnett County Board of Commissioners in Georgia for the Construction of Bethesda Park Pickleball Courts. The addendum addresses two critical questions raised during the pre-bid conference regarding site conditions and permitting requirements. Bidders must acknowledge receipt of this addendum in the designated space on page 15 of the bid documents and return it with their submission; failure to do so may result in bid rejection as non-responsive.

The addendum clarifies that contractors are responsible for verifying waterline locations and sizes at the pickleball court site, which may require potholing and testing of existing valves to determine which waterlines currently serve the area. Additionally, a permit is required for the new pavilion component of the project, and bidders must plan to submit manufacturer shop drawings for permitting review. These requirements represent essential pre-construction tasks that contractors must account for in their bid planning and cost estimates.

View the file

Other files

File Type Posted
BL020_26 NOTICE.pdf PDF
BL020_26 Award Notice.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

December 29, 2025

ADDENDUM #1

BL020-26, Construction of Bethesda Park Picklball Courts

QUESTIONS & ANSWERS:

Q1. Can you confirm the water line locations at the pickleball court site?

A1. Contractor shall verify waterline location and size for proposed connection. This may include, but not be limited to, potholing and testing valves for shut-offs to determine which existing waterline(s) are currently serving the area to receive the proposed courts.

Q2. Are permits required for the new pavilion?

A2. A permit is required for the new pavilion and bidders should plan to permit shop drawings from the manufacturer.

This addendum should be acknowledged in the space provided on page 15 of the bid documents and returned with your bid. Failure to do so may result in your bid being deemed non-responsive.

Thank you, Jake Scarpone