BISO LEE HOLLOW LOOP EQUIPMENT RENTAL Federal contract opportunity
Solicitation number
140P5323Q0019
Issued by
Department of the Interior National Park Service Southeast Region

View the file

Other files for this federal contract opportunity

Other files attached to BISO LEE HOLLOW LOOP EQUIPMENT RENTAL, newest first.
File Type Posted
Sol_140P5323Q0019_Amd_0002.pdf PDF
Questions_and_Answers_0001.pdf PDF
Sol_140P5323Q0019_Amd_0001.pdf PDF
Sol_140P5323Q0019.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Big South Fork National River and Recreation Area

Oneida, TN

Rehabilitate Lee Hollow Loop Horse Trail

(Equipment Statement of Specifications)

February 27, 2023

NATIONAL PARK SERVICE

INTERIOR REGION 2, SOUTH ATLANTIC GULF

NORTH MAJOR ACQUISITION BUYING OFFICE

SOW Format

1. BACKGROUND: ………………………………………………………………………………………………………………………………………………3

2. PROJECT IDENTIFIERS:

3. PLACE OF PERFORMANCE:

4. PERIOD OF PERFORMANCE:

5. SCOPE:

6. TASK: …………………………………………………………………………………………………………………………………………………………

7. PROJECT PERSONNEL:

1. BACKGROUND:

Big South Fork National River and Recreation Area (hereinafter referred to as “BISO”) is in both

Kentucky and Tennessee and consists of approximately 125,000 acres. The park was established by Congress on March 7, 1974. The parks mission is to provide management for the National

Area so that natural and cultural resources are preserved and protected for the use and enjoyment of present and future generations. The Big South Fork of the Cumberland River and its tributaries are preserved in a free-flowing condition, and a broad range of recreational opportunities are provided which benefit the regional economy.

Several combined years of above average rainfall coupled with a major ice storm in the Spring of

2021, and a growing backlog of deferred maintenance, have left the Lee Hollow Loop Horse

Trail in a state of major disrepair. Numerous sections are eroded severely exposing large jump-up rocks, and deep ruts. Water diversion assets have failed allowing the development of large mud bogs in low lying areas within the trail’s corridors. The overall condition of the trail loop is unsafe for horseback travel posing dangerous situations for rider and animal alike. The condition of this trail is a detrimental impact to the visitor experience at BISO. The Lee Hollow Loop

Trail is a highly utilized trail serving as a scenic loop between the Bear Creek Horse

Campground and the surrounding areas.

This project will serve to restabilize the trail corridors, repair the tread, repair drainage control devices, remove hazardous trees, and repair and replace directional signage. This project will utilize contractual obligation as well as day labor for completion. Day labor will be used for contract oversight.

2. PROJECT IDENTIFIERS:

PMIS NUMBER: 319065A

PROJECT TITLE: Rehabilitate Lee Hollow Loop Horse Trail

3. PLACE OF PERFORMANCE:

Trail repairs will begin at the Lee Hollow Loop Trail Head and continue throughout the entire trail loop. Equipment shall be delivered to the address below:

688 Lee Hollow Road

Strunk, KY 42649

4. PERIOD OF PERFORMANCE:

The contractor shall have no more than 14 calendar days to complete delivery of rental equipment, once the offeror receives the notice to proceed, with the only exceptions being unforeseen events beyond the contractor's control and/or delays that are caused by the National

Park Service.

5. SCOPE:

The National Park Service will contract the rental and delivery of 2 - Wacker Neuson DW50

Wheel Dumpers for use in spreading approximately 1800 tons of various sized limestone aggregate.

6. Rental Equipment Specifications:

• Equipment shall be rented for a time period of 6 months

• The equipment shall be rated at a 5-ton capacity, all-wheel drive, diesel engine, capable of multi-directional dumping

• Contracted rental agency shall be responsible for delivery, and pickup of equipment in compliance with the associated period of performance

7. PROJECT PERSONNEL:

Project Manager: Steve Wilmot

Phone: (423)569-7360

Email: stephen_wilmot@nps.gov

Roads and Trails Branch Chief: Chris Carson

Phone: (423)569-7332

Email: chris_carson@nps.gov

COR: Chris Henry

Phone: (423)569-7360

Email: christopher_henry@nps.gov

File details come from the government source that posted it. Updated .