bidnotice.pdf
PDF 114 KB Posted
- Solicitation number
- 63201-210599
- Issued by
- Berrien County, Michigan
About this file
Bidding Notice Summary
This is a bidding notice from the State of Michigan for a roadway reconstruction and bridge rehabilitation project in Pontiac, Oakland County. The project encompasses 4.44 miles of roadway improvements across I-75 BL (Woodward Avenue Loop), M-59 from Southbound Woodward Avenue Loop to Northbound Woodward Avenue Loop, and US-24BR (Cass Avenue) from Woodward Avenue Loop to US-24 (Cesar Chavez Avenue). The scope of work includes concrete reconstruction, hot mix asphalt cold milling and resurfacing, intersection improvements, drainage work, sewer installation, traffic signal work, signing, structural repairs, and pavement markings. The project includes a 3-year and 5-year materials and workmanship pavement warranty. The letting was scheduled for 10:30 AM local time on August 28, 2026, at 425 W. Ottawa Street, Lansing, MI 48933. The estimated completion date is June 15, 2030. Proposal plans consist of approximately 473 pages and are available for online examination.
The project requires DBE (Disadvantaged Business Enterprise) participation of 7.00% with no required SBP (Small Business Participation) set-aside. Prime contractors must hold prequalification in a combination of classifications 42380 B, Ea or Comb/Jt. 42380 B, K or Comb/Jt. 42380 Ea, K. Subclassifications B, Ea, K, and L are included in the project scope; if the prime contractor lacks prequalification in these subclassifications, prequalified subcontractors must be designated prior to contract award. The contract ID is 63201-210599 with control section project number 210599AST and federal project number 26A0936. Bidders are required to review proposal guaranty information and examine plans online.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting of: 261002
10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933
Call Number Contract ID Control Section Project Number Federal Project Number
007 63201-210599 210599AST 63201 26A0936
Description: 4.44 mi of roadway reconstruction and bridge rehabilitation including concrete reconstruction, hot mix asphalt cold milling and resurfacing, intersection improvements, drainage work, sewer, traffic signal, signing, structural repairs and pavement markings on I-75 BL (Woodward Avenue Loop), M-59 from Southbound Woodward Avenue Loop to Northbound Woodward Avenue Loop and US-24BR (Cass Avenue) from Woodward Avenue Loop to US-24 (Cesar Chavez Avenue) in the city of Pontiac, Oakland County. This project includes a 3 year and 5 year materials and workmanship pavement warranties.
Required DBE Participation: 7.00%
Required SBP Participation: 0.00%
Net Classification Required For This Project: ** Comb/Jt. 42380 B, Ea or Comb/Jt. 42380 B, K or Comb/Jt.
42380 Ea, K **
Estimated Pages For Plans: 473
Completion Date: 6/15/2030
12:00:00 AM
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of B, Ea, K and L. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Date Advertised: 8/28/2026
See proposal for bidder guaranty information.
Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>
Notice of Advertisement Report v1
AASHTOWare Project™ Version 5.04.04 Revision 047
File details come from the government source that posted it. Updated .