bidnotice.pdf
PDF 113 KB Posted
- Solicitation number
- 61073-214169
- Issued by
- Oakland County, Michigan
About this file
This is a bid notice for a road improvement project in Michigan administered by the Michigan Department of Transportation. The project involves 0.72 miles of hot mix asphalt cold milling and resurfacing, concrete joint repair, drainage structure repairs, sidewalk ramp upgrades, drainage repairs, and pavement markings on US-31BR from the White River to Stanton Street in the city of Montague, Muskegon County. The project was advertised on August 28, 2026, with a letting date of 261002 at 10:30 AM local time at 425 W. Ottawa St., Lansing, MI 48933. The estimated completion date is May 29, 2028. The project includes 68 estimated pages of plans available for online examination.
The project requires prime contractors to hold prequalification in Net Classification 1243 Cb, with additional subclassifications of Ba and K required; if the prime contractor lacks prequalification in these subclassifications, prequalified subcontractors must be designated prior to contract award. The project has a required Disadvantaged Business Enterprise (DBE) participation goal of 2.00% and a Small Business Program (SBP) participation requirement of 0.00%. Bidders are required to provide a guaranty as specified in the proposal documents. The contract control section is 61073, the project number is 26A0959, and the federal project number is 214169ANH.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting of: 261002
10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933
Call Number Contract ID Control Section Project Number Federal Project Number
013 61073-214169 214169ANH 61073 26A0959
Description: 0.72 mi of hot mix asphalt cold milling and resurfacing, concrete joint repair, drainage structure repairs, sidewalk ramp upgrades, drainage repairs and pavement markings on US-31BR from the White River to Stanton Street in the city of Montague, Muskegon County.
Required DBE Participation: 2.00%
Required SBP Participation: 0.00%
Net Classification Required For This Project: ** 1243 Cb **
Estimated Pages For Plans: 68
Completion Date: 5/29/2028
12:00:00 AM
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ba and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Date Advertised: 8/28/2026
See proposal for bidder guaranty information.
Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>
Notice of Advertisement Report v1
AASHTOWare Project™ Version 5.04.04 Revision 047
File details come from the government source that posted it. Updated .