bidnotice.pdf
PDF 113 KB Posted
- Solicitation number
- 63051-210113
- Issued by
- Berrien County, Blissfield Village, Michigan
About this file
This is a Bid Notice for a bridge reconstruction project in Michigan issued by the Michigan Department of Transportation. The project involves 0.08 miles of bridge reconstruction and replacement with a prestressed concrete box culvert on M-1 over Stoney Croft Drain in Bloomfield Hills, Oakland County. The scope of work includes drainage, watermain, sanitary sewer, guardrail, signing, pavement markings, and approach work. The project was advertised on July 2, 2026, with a letting date of 260807 at 10:30 AM local time at 425 W. Ottawa Street, Lansing, Michigan. The estimated plans contain 110 pages, and the project completion date is October 12, 2029.
The prime contractor must be prequalified in Classification 5032 Ea or 5032 Fa. If the prime contractor lacks prequalification in these subclassifications, prequalified subcontractors must be designated prior to contract award. The project requires 2.00% Disadvantaged Business Enterprise (DBE) participation and 0.00% Small Business Participation (SBP). Proposals and plans are available for examination online. Bidder guaranty information is detailed in the proposal documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting of: 260807
10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933
Call Number Contract ID Control Section Project Number Federal Project Number
001 63051-210113 210113ABFP 63051 26A0751
Description: 0.08 mi of bridge reconstruction including replacement with a prestressed concrete box culvert, drainage, watermain, sanitary sewer, guardrail, signing, pavement markings and approach work on M-1 over Stoney Croft Drain in the city of Bloomfield Hills, Oakland County.
Required DBE Participation: 2.00%
Required SBP Participation: 0.00%
Net Classification Required For This Project: ** 5032 Ea or 5032 Fa **
Estimated Pages For Plans: 110
Completion Date: 10/12/2029
12:00:00 AM
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea and Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Date Advertised: 7/2/2026
See proposal for bidder guaranty information.
Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>
Notice of Advertisement Report v1
AASHTOWare Project™ Version 5.04.04 Revision 047
File details come from the government source that posted it. Updated .