bidnotice.pdf
PDF 113 KB Posted
- Attached to
- Pavement Repair and Marking Fred W. Moore Highway from Henry Street to east of 7th Street
- Solicitation number
- 77000-214568
- Issued by
- Wayne County, Michigan
About this file
This is a bid notice from the Michigan Department of Transportation for a local agency highway project in St. Clair County. The project involves 0.50 miles of concrete pavement repairs and pavement markings on Fred W. Moore Highway from Henry Street to east of 7th Street in the city of St. Clair. The letting is scheduled for June 26, 2026 at 10:30 AM local time at 425 W. Ottawa Street, Lansing, Michigan. The project completion date is May 15, 2027. Plans consisting of approximately 9 pages are available for examination online. Prime contractors must be prequalified in Net Classification 443 Ba, and if not prequalified in subclassification Ea, must designate a prequalified subcontractor prior to contract award. The project was advertised on July 2, 2026.
The project requires 4.00% Disadvantaged Business Enterprise (DBE) participation and 0.00% Small Business Program (SBP) participation. Contract ID is 77000-214568 with Call Number 010 and Project Number 26A0625. The federal project number is 77000. Bidder guaranty information is included in the proposal documents. This is a local agency project, indicating funding and oversight responsibilities rest with the city of St. Clair rather than the state highway system.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting of: 260807
10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933
Call Number Contract ID Control Section Project Number Federal Project Number
010 77000-214568 214568ASTUL 77000 26A0625
Description: 0.50 mi of concrete pavement repairs and pavement markings on Fred W. Moore Highway from Henry Street to east of 7th Street in the city of St. Clair, St. Clair County. This is a Local Agency project.
Required DBE Participation: 4.00%
Required SBP Participation: 0.00%
Net Classification Required For This Project: ** 443 Ba **
Estimated Pages For Plans: 9
Completion Date: 5/15/2027
12:00:00 AM
In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Ea. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder.
Date Advertised: 7/2/2026
See proposal for bidder guaranty information.
Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>
Notice of Advertisement Report v1
AASHTOWare Project™ Version 5.04.04 Revision 047
File details come from the government source that posted it. Updated .