bidnotice.pdf

PDF 113 KB Posted

Attached to
Road Improvements on I-94 from 2nd Avenue to Conner Street
Solicitation number
82024-223349
Issued by
Wayne County, Detroit City, Michigan

About this file

This is a bid notice for a state transportation project in Michigan involving the Michigan Department of Transportation and the city of Detroit in Wayne County. The project encompasses 5.08 miles of hot mix asphalt cold milling and resurfacing with pavement markings, pavement repairs, concrete barrier repairs, concrete patching repairs, and drainage repairs on I-94 from 2nd Avenue to Conner Street. Additionally, the project includes bridge rehabilitation on 14th Street over I-94 involving beam replacement, heat straightening, and partial deck replacement, as well as pedestrian bridge demolition, filler wall installation, and permanent cantilever signing on Brooklyn Street over I-94. The project includes a 3-year materials and workmanship pavement warranty. The bid letting occurred on October 30, 2026, at 10:30 AM local time at 425 W. Ottawa Street, Lansing, Michigan 48933. Proposal documents and plans, totaling approximately 209 pages, are available for online examination. The project completion date is October 31, 2027.

The project requires a Disadvantaged Business Enterprise (DBE) participation set-aside of 2.00%, with no Small Business Program (SBP) participation requirement. The contract classification code required for this project is 15141 Cb. Three contract control numbers are associated with this project: 82024-223349, 82024, and 82023, with corresponding federal project numbers 224586AST and 226319AMER.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting of: 261204

10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933

Call Number Contract ID Control Section Project Number Federal Project Number

001 82024-223349 223349AIM 82024 27A0022

224586AST 82023 27A0023

226319AMER 82023 N/A

Description: 5.08 mi of hot mix asphalt cold milling and resurfacing and pavement markings, pavement repairs, concrete barrier repairs, concrete patching repairs, drainage repairs and pavement markings on I-94 from 2nd Avenue to Conner Street, bridge rehabilitation including beam replacement, heat straightening and partial deck replacement on 14th Street over I-94, and pedestrian bridge demolition, filler wall and permanent cantilever signing on Brooklyn Street over I-94 in the city of Detroit, Wayne County. This project includes a 3 year materials and workmanship pavement warranty.

Required DBE Participation: 2.00%

Required SBP Participation: 0.00%

Net Classification Required For This Project: ** 15141 Cb **

Estimated Pages For Plans: 209

Completion Date: 10/31/2027

12:00:00 AM

Date Advertised: 10/30/2026

See proposal for bidder guaranty information.

Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>

Notice of Advertisement Report v1

AASHTOWare Project™ Version 5.04.04 Revision 047

File details come from the government source that posted it. Updated .