About this file
This Request for Proposals (RFP) is issued by the City of Canon City, Colorado, soliciting qualified vendors to provide construction project management and inspection services for two separate road reconstruction projects on Griffin Avenue and College Avenue, with construction anticipated to commence in February 2027 for Griffin Avenue and in 2027-2028 for College Avenue. The Griffin Avenue project, designed by 3 Rocks Engineering and estimated at $4 million, spans approximately one mile and includes roadway reconstruction, water main installation, storm sewer system, and curb/gutter/sidewalk work, with an anticipated nine-month construction timeline from February through November 2027. The College Avenue project, designed by JR Engineering and estimated at $3.5 million, spans approximately one mile and includes roadway reconstruction, water main installation, and curb/gutter/sidewalk repairs, with a similar nine-month construction schedule to be finalized. Vendors are required to submit proposals by December 21, 2026, at 11:00 a.m. Mountain Standard Time via BidNet, with a mandatory pre-proposal meeting scheduled for December 1, 2026. The selection process will involve evaluation by a City selection team with notification of the selected vendor targeted for January 4, 2027, and City Council consideration scheduled for January 18, 2027.
The City seeks vendors capable of providing project management, office/file management, field inspection, and materials testing services, with water main inspection listed as a potential add-alternate; vendors must demonstrate familiarity with Appia project management software and experience with federally-funded projects, including prevailing wage and Buy America requirements. Both projects are partially financed through the Drinking Water Revolving Fund (DWRF) program, which federalizes the entire projects and requires compliance with federal provisions; additional funding comes from City dollars, with DWRF oversight managed through the Colorado Department of Public Health and Environment. The City reserves the right to make a single award or split the award between vendors and explicitly requires a single point of responsibility. Proposal evaluation will be scored on a 100-point scale based on personnel qualifications (10 points), comparable project experience (20 points), references (5 points), location (5 points), project understanding and approach (10 points), and cost proposal (50 points), with potential for an additional 10 points awarded during in-person interviews if needed for tie-breaking; vendors must accept the City's Professional Services Agreement or note requested revisions, and all proposals are binding for 180 days following the proposal period.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CAÑON CITY
REQUEST FOR PROPOSALS:
Construction Management & Inspection Griffin Avenue & College Avenue
PROJECT RFP 143-26
POSTED VIA BIDNET:
https://www.bidnetdirect.com/colorado/cityofcanoncity
SECTION 1: INTRODUCTION & BACKGROUND
The City of Cañon City, Colorado is soliciting proposals from qualified vendors to provide a variety of Construction Project Management Services on two (2) separate projects planned for construction starting beginning in 2027 and extending into 2028.
The primary point of contact will be:
Ted Dell Engineering Manager
City of Cañon City TJDell@canoncity.gov
Project Details (Griffin Avenue)
The project on Griffin Avenue was designed by 3 Rocks Engineering and is intended to be issued for bids in October 2026 concurrent with the issuance of this RFP. Work on Griffin Avenue is consistent with a typical road reconstruction project and spans a length of just under ½ a mile from the intersection of 4th Street east to the intersection of 9th Street. The project includes roadway reconstruction, installation of new water main, new storm sewer system, and curb/gutter/sidewalks. Current cost estimate is anticipated around $4M for the construction contract.
The road reconstruction and storm sewer portions of the project are funded with city dollars, while the water main portion of the project is financed through the Drinking Water Revolving Fund (DWRF) program. The entire project will be bid/awarded/managed as a single package through a single prime contractor.
DWRF financing federalizes the entire project and proposers are encouraged to review the construction project documents available under a separate solicitation on BidNet to familiarize themselves with the federal requirements specific to this project. Work on the project will be subject to all typical federal provisions (prevailing wage, Build America / Buy America, etc…). Oversight of the federal funds is managed through the assigned grant and loan specialist with the Colorado Department of Public Health and Environment.
mailto:laevans@canoncity.org
City of Cañon City November 18th, 2026 Request for Proposals: Construction Management & Inspection; Giffin Avenue & College Avenue (RFP 143-26) Page 2 of 8
Construction on the Griffin Avenue project is anticipated to take roughly 9 months with anticipated commencement in February 2027 and closeout in November 2027
BidNet Link for Griffin Ave Documents - https://www.bidnetdirect.com/colorado/cityofcanoncity
Project Details (College Avenue)
The project on College Avenue was designed by JR Engineering and is intended to be issued for bids in Early 2027 after issuance and award of this RFP. Work on College Avenue is consistent with a typical road reconstruction project and spans just under ¾ of a mile from the intersection of 9th Street to the intersection of 15th Street. The project includes roadway reconstruction, installation of new water main, and curb/gutter/sidewalk repairs. Current cost estimate for the project is anticipated around $3.5M for the construction contract.
The road reconstruction portions of the project are funded with city dollars, while the water main portion of the project is financed through the Drinking Water Revolving Fund (DWRF) program. The entire project will be bid/awarded/managed as a single package through a single prime contractor.
DWRF financing federalizes the entire project and proposers are encouraged to review the construction project documents available for Griffin Avenue under a separate solicitation on BidNet to familiarize themselves with the federal requirements as the requirements will either be identical for College Avenue or very similar. Work on the project will be subject to all typical federal provisions (prevailing wage, Build America / Buy America, etc…). Oversight of the federal funds is managed through the assigned grant and loan specialist with the Colorado Department of Public Health and Environment.
Construction on the College Avenue project is anticipated to take roughly 9 months with final schedule still to be determined.
City Needs & City Resources:
For the work on Griffin Avenue the city is primarily in need of staff to provide office/file management services, and material testing services as outlined in more detail below. The city anticipates providing a city staff member to serve as the field inspector/project manager for the Griffin Avenue project. City staff will largely be directly responsible for project management and decision making needs on this project with the primary focus being towards recordkeeping for federal compliance.
For the work on College Avenue the city is in need of multiple services. The city is requesting a range of services to include Project Management, Office/File Management, Field Inspection, and materials testing services as outlined below. City staff will be available to provide guidance and participate in some decision making, but largely expect a more independent team to manage the daily needs of the project while keeping the city informed.
Additionally, the city is requesting any information and availability of qualified water main inspectors that could be utilized for the water main inspection portions of the project. The city has some limited staffing available for water main inspection. This is not a required element of the proposal, but can be considered an add-alternate if the vendor has qualified and capable staff to fill the role.
Request for Proposals: Construction Management & Inspection; Giffin Avenue & College Avenue (RFP 143-26) Page 3 of 8
The city utilizes Appia for Project Management services and use of that software will be required by the selected vendor. Familiarity with Appia or similar software platforms is critical and required for this solicitation. The city does not have any spare software licenses and proposing vendors will need to include costs associated with obtaining licenses if needed to utilize Appia for these projects.
SECTION 2: SCOPE OF SERVICES
Below is an anticipated level of need and effort required for each project. The list is not intended to be all inclusive but rather intended to convey a rough outline of the anticipated steps:
• Project Management (College Avenue) – Serve as the primary point of contact for the assigned project for the public, city staff, and contractor. Coordinate, host, and manage bi-weekly progress meetings to review status of work and items. Scheduling field inspection and materials testing staff for the needed work. Provide oversight of the office/file management to ensure compliance with the project requirements. Meet with residents, stakeholders, city staff, and Contractor to resolve issues. Review problems and provide direction to the Contractor on simple issues. Review problems and provide a set of possible solutions for city staff review and input on complex problems. Prepare and provide public information updates through the City’s Public Information Officer.
• Office/File Management (Griffin Avenue & College Avenue) – Work will include complete project tracking and compliance. Review, acceptance/rejection, of all materials including full Build America / Buy America compliance. Review, acceptance/rejection of all certified payrolls on the project. Coordination with the assigned CDPHE Grant and Loan Specialist for reimbursements and project compliance. Review and approval of field inspector daily reports.
Review and processing of change orders and pay applications within Appia for the project in accordance with city standards.
• Field Inspection (College Avenue) – Work will include on-site inspection and tracking of the project. Providing daily reports via Appia of the work completed and reporting/documenting of any issues observed. Work shall be completed by a qualified and experienced individual familiar with field inspection work on federally funded projects. Prior experience in demolition, aggregate, concrete, asphalt, storm sewer, curb and gutter, sidewalk, traffic control, and other related items of work are expected. Field Inspectors will also be required to utilize Appia for the project tracking and record keeping and familiarity with that software or similar software is required. The city will separately contract for material testing services, however the field inspector will be responsible to coordinate needed material testing with the cities selected vendor.
• Materials Testing (Griffin Avenue & College Avenue) – Work will include conducting on-site sampling and testing of materials planned for incorporation into the project. Typical work will include sampling and testing concrete, asphalt, and aggregate base course items in accordance with the city standards. The city has staff that can provide aggregate base course testing and reserves the right to conduct those in house if staffing allows.
• Water Main Inspection (Potential Add Alternate for Griffin Avenue and/or College Avenue) – If submitting vendor has staff available that are qualified and experienced in water main
Request for Proposals: Construction Management & Inspection; Giffin Avenue & College Avenue (RFP 143-26) Page 4 of 8 installation that is a potential add alternate to this RFP. Preference is given to individuals that have held or currently hold a State of Colorado Level 3 water distribution license. Experience overseeing the installation and testing of water main in conformance with AWWA standards is also expected and required. Work would include oversight and planning of the water main installation. Providing daily reports via Appia of the work completed and reporting/documenting of any issues observed. Coordinating shutdowns and all valve turning operations, planning and witnessing all testing and sampling practices, and survey recording all final installations for the As-Built records.
The city does not require separate staff for each function. If a singular staff is capable and competent of performing multiple functions listed above they may do so and should be clearly indicated on the proposal.
As noted previously City Staff will provide field inspection for the Griffin Avenue project and are available to assist and provide guidance in both projects but do not have sufficient resources to be the primary point of contact and are requesting assistance from qualified and capable staff that can manage their assigned areas with minimal input.
The city reserves the right to make a single award or to split the award as it determines in the best interest of the city to ensure these projects are delivered in the most efficient and cost effective manner possible.
The following schedule is an approximate outline of the goals for the projects:
Issue RFP ................................................. November 18th, 2026 Pre-Proposal Meeting ............................. December 1st, 2026 (1:00 PM) Inquiries Close ......................................... December 14th, 2026 (4:00 PM) Final Addenda ......................................... December 18th, 2026 Proposals Due ......................................... December 21st, 2026 (11:00 AM) Selection Team Scoring ........................... December 21st, 2026 – January 4th, 2027 Notify Selected Team .............................. January 4th, 2027 Professional Services Agreement ........... January 4th – 8th, 2027 Council Consideration ............................. January 18th, 2027 Notice of Award ...................................... January 19th, 2027 Target Precon Meeting (Griffin) .............. February 2nd, 2027 Start Const (Griffin) ................................. February 16th, 2027 End Const (Griffin)................................... November 2nd, 2027
College Avenue Schedule is TBD. Plan on 9 months of construction likely in portions of 2027 & 2028.
Request for Proposals: Construction Management & Inspection; Giffin Avenue & College Avenue (RFP 143-26) Page 5 of 8
SECTION 3: CONTENT OF PROPOSAL
Content: To be considered for selection, each vendor must submit, at minimum, the following information in keeping with the following format and identifying each item by number and letter.
A. Letter of introduction. Briefly describe the vendor and the name, address, email, and phone number of the primary point of contact between the vendor and the city.
B. Project Team and Structure. Identify a single primary point of contact (Project Manager) within the vendor and an organizational chart for up to three (3) additional key staff that will likely be involved in the project delivery based on the qualified tasks. Provide resumes and experience of the up to four (4) total staff identified.
C. Relevant Project Experience. Provide details on a maximum of three comparable projects where you have performed similar scope work on in the past. Where possible highlight previous experience working within the DWRF, Federally Funded Projects, and with Appia Project Management Software
D. References. Provide at least three (3) references that may be contacted for verification of the respondent's experience and qualifications. If possible, provide references for the above identified example projects.
E. Location. Provide a location where the bulk of the engineering work will be performed. Full points will be awarded for vendors providing a bulk of the services within Fremont County and decreasing points assigned for vendors with a bulk of the work outside of Fremont County based on the relative distance from Cañon City.
F. Project Understanding and Approach. Provide details outlining your approach to each specific project and identified need. Walk through all the steps necessary for successful delivery of these critical projects for the community and highlight your approach to each and the challenges you foresee with each of these projects. Provide a project schedule that you intend to utilize in delivering these projects.
G. Compensation / Payment Schedule. Provide a detailed priced proposal to fulfill this request for proposal. The pricing should be broken down between each project (Griffin & College), and further broken down by primary task area (Construction Project Management, Field Inspection, and Water Main Inspection).
H. Professional Services Agreement. Review the sample PSA and provide a note either accepting the agreement as written or noting any areas that would be requested for revision should you be selected as the preferred vendor.
Request for Proposals: Construction Management & Inspection; Giffin Avenue & College Avenue (RFP 143-26) Page 6 of 8
SECTION 4: RFP INSTRUCTIONS AND RESPONSE
Submittal, review, scoring and selection of RFP’s will be as outlined below.
Pre-Submission Meeting & Vendor Inquiries:
Vendors will be given an opportunity to meet with Cañon City Staff to ask questions at a pre-submission meeting to be held:
Tuesday, December 1st, 2026 at 1:00 p.m. [Mountain Standard Time] Room A002 South | Council Chambers South City of Cañon City | John D. Havens City Hall Building 128 Main Street, Cañon City, CO 81212
Virtual Option:
https://teams.microsoft.com/meet/2286988698524052?p=h9KIF6gr6AQg3JABZo
Attendance at this pre-submission meeting is not mandatory. Official meeting minutes will be posted as an addendum once finalized.
Vendors must submit any questions asked outside the pre-bid meeting via BidNet. Questions must be received by 4PM on Monday, December 14th, 2026, and all questions must be submitted via the electronic method through BidNet for consideration. Responses to questions received via BidNet and through the pre-bid are targeted to be posted no later than Friday, December 18th, 2026.
Proposal Submittal Vendors will prepare proposals in compliance with all the instructions outlined in the RFP. Partial or incomplete proposals will be rejected. A vendor official with the legal authority to bind the vendor must sign the proposal in ink. All proposals must be vendor for acceptance for 180 days following the proposal period.
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO BIDNET:
Deadline for submittal is Monday, December 21st, 2026 Not later than 11:00 a.m. [Mountain Standard Time]
Provide contact information for the principal individual(s) to be contacted regarding the information in the RFP.
RFP Evaluation:
If an award is made because of this RFP, it shall be done so based on an evaluation of the following factors:
1. Written Proposal Evaluation (100/100 Points)
a. Qualification and Availability of Proposed Personnel (10 Points)
b. Comparable Successful Projects (20 Points)
c. References (5 Points)
d. Location (5 Points) https://teams.microsoft.com/meet/2286988698524052?p=h9KIF6gr6AQg3JABZo
Request for Proposals: Construction Management & Inspection; Giffin Avenue & College Avenue (RFP 143-26) Page 7 of 8
e. Project Understanding and Approach (10 Points)
f. Cost Proposal (50 Points)
2. In Person Interview (+10 Additional Points – If Needed for tie breaking purposes)
Proposals will be scored by a team of City Staff and/or elected officials.
False or Misleading Statements:
Vendors must take great care to ensure sufficient information has been provided to allow Cañon City to evaluate the technical solution being offered, any options proposed, and all supporting information, technical documentation, references and points of contact, corporate capabilities, etc.
Vendors must be aware that if a proposal contains false or misleading information of any kind or does not contain sufficient detail to fully evaluate the technical solution or proposed price, Cañon City reserves the right, in its sole discretion, to reject the proposal. Vendors also understand that if the information provided does not support a function, attribute, capability or condition as proposed by the vendor, Cañon City may reject the proposal.
Acceptance of Proposal Content:
The City's professional services agreement must be executed by the selected vendor prior to work commencing. The contents of the RFP response and all pricing, terms and statements contained therein are binding upon the vendor. The successful Proposal, including all terms, conditions and pricing contained therein, may be incorporated into the awarded contract. Failure to timely execute the City's PSA may result in the selection of another offer or rejection of the submitted Proposal.
Vendors must respond to all requirements of this RFP. Vendors must clearly identify any limitations and/or exceptions to the requirements inherent in the proposed system. Alternative approaches will be given consideration if the Proposal clearly offers increased benefits to Cañon City.
No Obligation to Buy:
The City of Cañon City reserves the right to refrain from contracting with any vendor. The release of this RFP does not compel Cañon City to make any purchase. The City of Cañon City cannot contract for services until grant funds have been secured from the State of Colorado.
Withdrawal of Proposals:
Vendors may withdraw a proposal that has been submitted at any time up to the proposal closing date and time. To accomplish this, a written request signed by an authorized representative of the vendor must be submitted to the RFP Contact. The vendor may submit another proposal at any time up to the proposal closing date and time.
Cost of Preparing Proposals:
The City of Cañon City is not liable for any costs incurred by vendors in the preparation and presentation of proposals and demonstrations submitted in response to this RFP.
Request for Proposals: Construction Management & Inspection; Giffin Avenue & College Avenue (RFP 143-26) Page 8 of 8
Legal Compliance:
Vendor must comply with all federal, state, and local law including business licensing, bond, and insurance requirements. The City may require proof of compliance at any time. The selected consultant and all professionals responsible for regulated professional services shall maintain all licenses, registrations, certificates of authorization, and other credentials required by Colorado law for the services to be performed. All plans, specifications, reports, surveys, and other documents required by law to be sealed must be prepared by a licensed professional and bear the required seals and signatures.
Vendor Responsibility:
Unless otherwise stipulated, vendors must provide, and pay for, all materials, labor, tools, equipment, transportation, and other facilities necessary for the performance and completion of the work.
Single Point of Responsibility:
The City of Cañon City expects to have a single point of contact (i.e., a single point of authority and a single contracting entity for this project). Cañon City will not enter into any agreement that does not provide a single point of accountability for the completion of the project. All subcontractors are to be listed in the RFP response and are subject to approval by Cañon City. Likewise, Cañon City will provide a single point of contact/authority for the project to facilitate the coordination of efforts.
No Binding Contract Prior to Execution Submission of a proposal does not create a contract or other binding obligation between the City and any vendor. The City has no obligation to any vendor unless and until a Professional Services Agreement has been fully executed by authorized representatives of both parties. The City's acceptance of a proposal does not constitute acceptance of the vendor's terms and conditions except to the extent expressly incorporated into the executed Professional Services Agreement.
Public Records Proposals and other materials submitted in response to this RFP may be subject to disclosure under the Colorado Open Records Act, C.R.S. § 24-72-201 et seq. A vendor claiming that particular information is exempt from disclosure must clearly identify the specific information and the legal basis for the claimed exemption. Blanket designations of an entire proposal as confidential or proprietary will not be accepted. The City will make disclosure determinations in accordance with applicable law.
END OF DOCUMENT
LIST OF ATTACHMENTS:
Attachment A: Sample Professional Services Agreement
File details come from the government source that posted it. Updated .