biddoc.pdf
PDF 186 KB Posted
- Attached to
- Citywide Traffic Signal Structure Inspections
- Solicitation number
- RFP-PWU-26-326
- Issued by
- Adams County, Weston CDP, Colorado
About this file
This Request for Proposal (RFP) is issued by the City of Westminster, Colorado, for Citywide Traffic Signal Structure Inspections. The project scope involves inspecting, updating inventory, and reporting findings on the City's traffic signal structures at various citywide locations. The pre-proposal conference is scheduled for November 30, 2026, at 9:30 AM MST via Microsoft Teams. The deadline for submitting clarifying questions is December 4, 2026, at 4:00 PM MST, with responses posted by December 10, 2026. Proposals are due December 18, 2026, at 4:00 PM MST through the BidNet electronic system, with evaluation occurring December 21, 2026, through January 7, 2027. Tentative interviews may be conducted at the City's discretion. The contract term is five years, structured as an initial one-year contract with four optional one-year renewals. The Procurement Official is Bryn Fillinger, Senior Procurement Analyst, at bfilling@westminsterco.gov or 303-658-2716. All communications regarding the solicitation must be directed through BidNet or the designated Procurement Official, with unauthorized communications potentially resulting in disqualification.
Pricing shall be submitted as unit pricing and hourly rates using the provided Fee Schedule (Exhibit D), with unit prices governing in case of extension errors. Contract pricing may be adjusted annually at renewal, subject to negotiation and approval, with increases not exceeding 3% per adjustment period and cost reductions passed to the City. Progress payments are made monthly based on invoices submitted in accordance with the Purchase Order and Fee Schedule, within 30 days of service completion and invoice acceptance. No payment is authorized for work without a valid City Purchase Order, and final payment is contingent upon work completion and compliance with specifications. The contractor must carry general liability, workers' compensation, and professional liability (Errors & Omissions) insurance, naming the City as an additional insured, with certificates submitted after award. Proposals must include company history, three comparable government projects with references, key personnel resumes, proof of Colorado contractor's license, insurance documentation, Certificate of Good Standing from the Colorado Secretary of State, and a subcontractor list. The evaluation criteria weights responses to RFP requirements at 25%, consultant background and safety program at 30%, professional background of key personnel at 35%, and fee schedule appropriateness at 10%. The City reserves the right to reject any or all proposals and to award part or all of the contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
CITYWIDE TRAFFIC SIGNAL STRUCTURE INSPECTIONS
Solicitation No. RFP-PWU-26-326
SCHEDULE OF EVENTS
RFP Advertisement November 17, 2026 Pre-Proposal Conference November 30, 2026 9:30 AM MST Deadline to Submit Questions December 4, 2026 4:00 PM MST Response to Questions December 10, 2026 4:00 PM MST Proposal Due Date December 18, 2026 4:00 PM MST Evaluation December 21, 2026 – January 7, 2027 Tentative Interviews TBD
Procurement Official: Bryn Fillinger, Senior Procurement Analyst Email: bfilling@westminsterco.gov
Phone: 303-658-2716
Authorized Communications. From the date of issuance of this Solicitation until award, all communications regarding this Solicitation shall be directed only through BidNet and to the
Procurement official listed on the cover page, unless otherwise authorized by the City.
Communication with other City personnel regarding this Solicitation may result in disqualification, in the City’s sole discretion.
The party submitting a proposal, hereinafter referred to as the Proposer, offers to furnish to the City of Westminster the products and services requested in accordance with the specifications and subject to the Terms and Conditions described herein.
Table of Contents
SECTION A: RFP OVERVIEW AND PROJECT REQUIREMENTS
A.1 INTRODUCTION:
A.2 PROJECT DESCRIPTION
A.3 TERM:
A.4 SCOPE OF WORK/ REQUIREMENTS
A.5 RFP ATTACHMENTS:
A.6 WORK SCHEDULE
A.7 PRE-PROPOSAL CONFERENCE:
A.8 ELECTRONIC SUBMISSION OF PROPOSALS AND COMMUNICATION:
A.9 CLARIFYING QUESTIONS:
A.10 ADDENDA:
A.11 PRICING:
A.12 PRICE REDETERMINATION:
A.13 PAYMENT TERMS:
A.14 INSURANCE REQUIREMENTS:
SECTION B: PROPOSAL SUBMISSION REQUIREMENTS
B.1 GENERAL SUBMISSION INFORMATION:
B.2 CHANGES:
B.3 MODIFICATIONS TO PROPOSAL:
B.4 CONTRACT DOCUMENTS:
B.5 ACCEPTANCE PERIOD:
B.6 PROPOSAL CONTENTS AND FORMAT:
SECTION C: EVALUATION AND AWARD
C.1 EVALUATION OVERVIEW
C.2 PROPOSAL EVALUATION ITEMS:
*The City reserves the right to conduct interviews with shortlisted proposers at its sole discretion
C.3 EVALUATION AND SELECTION:
C.4 AWARD TYPE:
C.5 NOTICE TO PROCEED:
SECTION D: GENERAL RFP AND CONTRACT INFORMATION
D.1 PAYMENT CONDITIONS:
D.2 RFP CONDITIONS AND PROVISIONS:
D.4 GRATUITIES AND KICKBACKS:
D.5 NON-COLLUSIVE PROPOSER CERTIFICATION:
D.6 DISCLOSURE OF CONTENTS OF PROPOSALS:
D.7 COOPERATIVE PURCHASING:
SECTION A: RFP OVERVIEW AND PROJECT REQUIREMENTS
A.1 INTRODUCTION:
The City of Westminster, hereinafter referred to as the City, is inviting qualified firms to submit proposals for Citywide Traffic Signal Structure Inspections. This RFP outlines the scope of work, requirements, and conditions for proposing. The successful Proposer, hereinafter referred to as the Contractor, will enter into a contract with the City for the completion of the work outlined herein.
A.2 PROJECT DESCRIPTION
The goal of this project is to inspect, update the inventory, and report the findings of the City of Westminster’s traffic signal structures.
Location: Various locations Citywide.
Estimated Duration: Up to five (5) years.
A.3 TERM:
It is the City’s intention to award this Contract for a term of five (5) years. The initial Contract will be one (1) year, with four (4), 1-year renewals. Any additional Contract extensions shall be in accordance with the City’s Procurement Policy.
A.4 SCOPE OF WORK/ REQUIREMENTS
The Scope of Work (SOW) is attached as Exhibit B to this RFP.
A.5 RFP ATTACHMENTS:
Exhibit A Sample Services Contract Exhibit B Scope of Work Exhibit C Annual Inspection Schedule Exhibit D Fee Schedule
A.6 WORK SCHEDULE
All work on City property shall be done during regular working hours on regular working days (Saturdays, Sundays and Holidays excepted).
If a Contractor must work overtime, on City property, in order to meet required completion dates, they shall get advance approval from the agency involved, and hours of work shall be agreed upon.
A.7 PRE-PROPOSAL CONFERENCE:
A recommended virtual pre-proposal conference will be conducted on the date and time listed in the Schedule of Events on the cover page. The solicitation terms and conditions will be reviewed and discussed at this time. Interested Proposers should attend virtually via Microsoft Teams using the following link:
Microsoft Teams meeting Join:
https://teams.microsoft.com/meet/2885501877282999?p=Qb9qXT7amOKHSl9JRT Meeting ID: 288 550 187 728 299 9 Passcode: XP6MK9UU
Need help? | System reference Dial in by phone +1 720-739-8152,,993458458# United States, Denver Find a local number Phone conference ID: 993 458 458# For organizers: Meeting options | Reset dial-in PIN
A.8 ELECTRONIC SUBMISSION OF PROPOSALS AND COMMUNICATION:
The City is using Rocky Mountain E-purchasing System (BidNet®) to advertise and manage formal solicitations. Registration with BidNet® is free and provides access to view posted governmental proposals, with an optional paid notification service.
Submission of all proposals and clarifying questions for this solicitation must be done electronically through BidNet® at https://www.bidnetdirect.com/colorado/cityofwestminster no later than the date and time specified in the Schedule of Events. The City is not responsible for the Proposer's actions or interactions with BidNet® or other third-party services related to this RFP.
For more information or assistance with BidNet®, call 1-800-835-4603, Option 2.
A.9 CLARIFYING QUESTIONS:
The City is not bound by, and Proposers shall not rely on any oral interpretations or clarifications of this RFP.
All questions must be submitted via BidNet no later than the date and time specified in the Schedule of Events. Responses will be posted on BidNet for public viewing.
https://teams.microsoft.com/meet/2885501877282999?p=Qb9qXT7amOKHSl9JRT https://aka.ms/JoinTeamsMeeting?omkt=en-US https://teams.microsoft.com/l/meetup-join/19%3ameeting_ODJjZmIyM2EtZTVkNS00NjVhLWExMDYtYWU0ZjZiYzQ0MDEz%40thread.v2/0?context=%7b%22Tid%22%3a%22f94ebb71-3556-4624-9547-b725ee971c94%22%2c%22Oid%22%3a%2217bcfc52-fad9-401c-aaf4-a2f1f2536f59%22%7d tel:+17207398152,,993458458 https://dialin.teams.cloud.microsoft/77747cee-d5df-416b-9b35-5fd3cb883e86?id=993458458 https://teams.microsoft.com/meetingOptions/?organizerId=17bcfc52-fad9-401c-aaf4-a2f1f2536f59&tenantId=f94ebb71-3556-4624-9547-b725ee971c94&threadId=19_meeting_ODJjZmIyM2EtZTVkNS00NjVhLWExMDYtYWU0ZjZiYzQ0MDEz@thread.v2&messageId=0&language=en-US https://dialin.teams.cloud.microsoft/usp/pstnconferencing https://www.bidnetdirect.com/colorado/cityofwestminster
Except for pre-proposal meetings or site visits, communication with City personnel outside of the Procurement staff may result in disqualification of the Proposer’s submission.
A.10 ADDENDA:
If it becomes necessary to revise, clarify, supplement, or cancel any part of this solicitation, the City will issue written addenda through BidNet. It is each Respondent’s responsibility to verify receipt of and compliance with all addenda.
A.11 PRICING:
All prices quoted shall be Unit Pricing/Hourly Rate and shall use Exhibit D Fee Schedule. Unit price for each item proposed on shall be shown and shall be for the unit of measurement indicated. In case of error in extension of prices, the unit price will govern.
A.12 PRICE REDETERMINATION:
The contract pricing may be adjusted based on changes in the cost of labor, materials, or other relevant factors, as measured by specific indices such as CPI, PPI, or other agreed benchmarks. Price adjustments may be requested annually, at the time of contract renewal by the Consultant, with supporting documentation detailing the reasons for the increase. Any proposed adjustment will be subject to negotiation and approval by the City. Price increases will not exceed 3% per adjustment period, and any cost reductions must be passed on to the City.
A.13 PAYMENT TERMS:
Work may begin upon the issuance of a valid Purchase Agreement.
The City will make progress payments based on monthly invoices submitted by the consultant in accordance with the approved Purchase Order and Fee Schedule.
Under no circumstances will a contractor receive payment for work which was not authorized by the City representative.
A.14 INSURANCE REQUIREMENTS:
The Contractor shall carry the insurance specified in Exhibit A, Sample Services Contract, which is included with this RFP, and shall submit proof of such insurance when delivering the executed Contract to the City of Westminster.
The City shall be named as an additional insured on the specified liability insurance policies and certificates of insurance. Insurance certificates required for this project shall be sent to the Project Manager, after the proposal has been awarded.
If the services involve professional or design work, the Contractor shall also carry Professional Liability (Errors & Omissions) insurance with minimum limits stated in Exhibit A, maintained for the applicable Colorado statute-of-repose period. Where the services involve City data or systems, Cyber / Network Security and Privacy Liability coverage may also be required.
The remainder of this page was intentionally left blank
SECTION B: PROPOSAL SUBMISSION REQUIREMENTS
B.1 GENERAL SUBMISSION INFORMATION:
All proposals must be received by the date and time specified in the Schedule of Events on the cover page. Late submissions will not be considered.
Proposals submitted through BidNet are locked until after the due date. Proposers are encouraged to submit their proposals well in advance to allow time for any technical issues, as late proposals will not be accepted by the system.
For assistance with bid submissions, please contact BidNet® at 1-800-835-4603, Option 2.
Proposers unable to submit electronically must submit a written request to the Procurement Analyst by the Question Due Date to receive permission and instructions for submitting a hardcopy bid.
B.2 CHANGES:
Proposers shall include all costs necessary to provide a complete project. Items required by the scope but omitted from the proposal are deemed included in the proposal price. The City will not approve change orders for work clearly required by the scope. Change orders are reserved for City-directed changes to scope.
B.3 MODIFICATIONS TO PROPOSAL:
No proposal may be modified or withdrawn after the submission deadline. If a firm submits more than one proposal, only the last submission will be considered.
Once submitted, a proposal becomes City property. The City shall retain all proposals submitted regardless of whether that proposal is selected in accordance with the City’s retention policy. Submission of a proposal indicates acceptance by the Proposer of the conditions contained in this RFP.
B.4 CONTRACT DOCUMENTS:
The City's Sample Contract is provided as Exhibit A of this RFP. The awarded Contractor will be required to sign a version of the Contract similar to the one in Exhibit A, with modifications to reflect the actual scope of services.
B.5 ACCEPTANCE PERIOD:
By responding to this RFP, Proposers shall remain firm for 90 days from the proposal due date.
B.6 PROPOSAL CONTENTS AND FORMAT:
Proposals must be in Microsoft Word or an original PDF (not a scanned copy).
Pricing must be submitted in Microsoft Excel format.
Proposals should address all items outlined in the SOW and align with the evaluation criteria and should not exceed 15 pages of text and figures. Cover letters, resumes and exhibits to the proposal do not count toward the proposal page limit.
1. Cover Letter and Executive Summary
Include your company’s history, structure and size. Specify the number of years your firm has been providing structural inspection services. Describe your firm’s expertise, safety program, and any other information that would be helpful to the City in the selection process. Limit this information to one (1) page.
2. Similar Project History Provide examples of three (3) major contracts with governmental entities which are comparable to the scope of the services listed in this solicitation. Include the following information for each project:
a. Governmental entity name
b. Term of contract, including dates of contract
c. Total dollar amount of original contract
d. Total amount of project upon completion
e. Reasons for variance in original contract amount vs. total amount of contract upon completion
f. Contact name at governmental entity
g. Phone number and email address for contact
3. Personnel Qualifications Provide resumes for key personnel. Demonstrate that they have managed comparable projects and have sufficient qualifications and/or experience to successfully complete this type of work.
Include any manufacturer or industry training pertinent to this type of work.
4. Fee Schedule
Enclose Exhibit D, Fee Schedule, as a separate document or file with the proposal.
Unit price for each item shall be shown and shall be for the unit of measurement indicated. In case of error in extension of prices, the unit price will govern.
5. Licenses and Certifications. Proof of valid Colorado contractor’s license and applicable certifications.
6. Insurance. Proof of the contractor’s insurance coverage (general liability, workers' compensation, etc.).
7. Sample Contract Redlines. (if applicable) The City reserves the right to reject any or all proposed modifications.
8. Certificate of Good Standing from the Colorado Secretary of State’s Office.
Successful vendors that are required to furnish a Certificate of Good Standing from the Colorado Secretary of State’s Office, as proof that they are properly registered to do business in the State of Colorado, prior to finalization of award and contracting.
9. Subcontractor List. Proposers must demonstrate to the City's satisfaction the reliability and responsibility of any proposed subcontractors based on the criteria outlined in these Instructions and Proposal Requirements. Prior to contract award, the City will notify the Proposer in writing if there are reasonable objections to any proposed subcontractors. In such cases, the Proposer may:
a. Withdraw its proposal, or
b. Submit an acceptable substitute subcontractor with an adjusted proposal to account for any cost differences. The City may, at its discretion, accept the adjusted proposal.
SECTION C: EVALUATION AND AWARD
C.1 EVALUATION OVERVIEW
The City does not discriminate on the grounds of race, religion, color, age, sex, disability, or national origin in consideration of an award. Disadvantaged business enterprises are afforded a full opportunity to submit proposals.
C.2 PROPOSAL EVALUATION ITEMS:
The Selection Committee will perform an evaluation of each proposal using the following criteria and weighting:
Evaluation Criteria Weight 1 Response to requirements in RFP, clarity and presentation of proposed scope.
2 Consultant’s background, safety program, and expertise in completing similar projects.
3 Professional background and expertise of each key person on the project team.
4 Fee schedule and hourly rates for staff assigned to the project related to their experience level.
Total 100 *The City reserves the right to conduct interviews with shortlisted proposers at its sole discretion.
C.3 EVALUATION AND SELECTION:
Selection shall be made to the highest scoring Proposer of the evaluation criteria of this RFP and in accordance with Westminster Municipal Code (W.M.C.) Title XV, Chapter 1, Section 15-1-5.
In evaluating proposals, the City shall consider the qualifications of the Proposers, and whether or not the proposals comply with the prescribed requirements. The City reserves the right to reject proposals that do not pass any such evaluation to the City's satisfaction.
C.4 AWARD TYPE:
Final award as a result of this RFP is contingent upon the successful execution of a City Contract.
One award will be made on an "all or none" basis. Prices must be shown for each item listed. Proposals submitted without individual item prices listed will be considered as non-responsive and rejected.
The City reserves the right to award part or all of the proposal.
C.5 NOTICE TO PROCEED:
Work shall not commence until a contract has been fully executed and the Contractor has received a City Purchase Order (PO). A Notice to Proceed is not considered invalid unless it is accompanied by a PO.
SECTION D: GENERAL RFP AND CONTRACT INFORMATION
D.1 PAYMENT CONDITIONS:
Payment to the Contractor will be made within 30 days after the completion of services and acceptance of a proper invoice. The City reserves the right to withhold payment if the Contractor fails to comply with the purchase agreement or if services are deemed unsatisfactory by the City's inspection. The City will notify the Contractor promptly of any performance issues so that corrections can be made, if possible, before payment is delayed.
Final payment will not be made if the work is found incomplete or does not meet the agreed-upon specifications, including authorized changes. The Contractor must correct or complete any deficiencies before receiving final payment.
Under no circumstances will payment be made for work not authorized by the City, as evidenced by a Purchase Order.
D.2 RFP CONDITIONS AND PROVISIONS:
1. Submission: Proposals (including all required attachments) must be submitted electronically via the Rocky Mountain E-purchasing System (BidNet®).
2. Compliance: All Proposers must comply with the conditions, requirements, and instructions outlined in this RFP. If there are any omissions or conflicts in the instructions, the Proposer must seek written clarification from the Procurement Manager at least forty-eight (48) hours before the proposal opening.
3. Typographical Errors: Errors in proposal pricing may result in the loss of contract award.
4. Proposal Completeness: All requested information must be provided. Failure to submit complete information may result in disqualification.
5. City’s Discretion: The City reserves the right to postpone, cancel, or reject all proposals if deemed in the City’s best interest.
6. Pricing: Unit prices must be provided for each item. In case of discrepancies in price extensions, the unit price will govern.
7. Waiver of Errors: The Procurement Manager reserves the right to waive minor errors or omissions and to reject any or all proposals, or to award a contract in part or whole, if in the City’s best interest.
8. Compliance with Specifications: The Contractor must comply with all terms, conditions, and specifications of this RFP. The City reserves the right to inspect the Contractor’s facilities and equipment to ensure compliance.
9. Eligibility: Proposals from entities in arrears to the City, or failing to meet required legal or regulatory compliance, will not be accepted. Proposers may be asked to demonstrate the necessary knowledge and financial capacity to perform the work.
10. Legal Compliance: The Proposer agrees to abide by all applicable laws, regulations, and ordinances of the United States, State of Colorado, and City of Westminster, securing all necessary licenses and permits.
11. Standards Compliance: All materials, supplies, equipment, and services provided must meet all applicable federal, state, and local codes.
12. Formal Contract: A formal contract will be prepared by the City, and the Contractor must sign and submit required insurance and documentation within ten (10) days (or as otherwise specified) from receipt of the contract.
13. No Liability for Costs: The City will not be liable for any costs incurred by the Proposer in the preparation of proposals or in connection with work performed prior to the contract’s execution.
14. Permits and Fees: The Contractor is responsible for procuring necessary permits, paying taxes, and complying with all associated fees. All costs should be included in the proposal price.
15. Tax Exemption: The City is exempt from City, State, and Federal sales/excise taxes.
Tax exemption certificates will be provided upon request.
D.3 PROTESTS:
This policy does not apply if all proposals are rejected or if the solicitation is cancelled without an award.
1. Right to Protest: Any Proposer or vendor who feels wronged (referred to as the
"aggrieved party") regarding the solicitation or contract award can protest to the Westminster Procurement Manager, Aran Raz, at araz@westminsterco.gov.
2. Timing of Protests:
a. Pre-Award: If the aggrieved party has concerns about the proposal specifications before the proposal opening date, they must submit their protest at least three (3) business days before that date. The aggrieved party must show that there’s a problem with the specifications. Late protests shall not be accepted.
b. Post Award. If the aggrieved party believes the award process did not follow the City’s Procurement rules, they must submit a protest within ten (10) business days after the intent to award is published on Rocky Mountain E- Purchasing System (Bidnet). The aggrieved party must show that the rules were not followed. Late protests shall not be accepted.
c. All protests must be made in writing to the Westminster Procurement Manager, Aran Raz, at araz@westminsterco.gov.
3. Written protest must include:
a. Name, address, and telephone number of the aggrieved party
b. RFP number and date of procurement
c. A clear explanation of the issues.
d. Any evidence or documents that support your protest
e. A detailed explanation of why you believe you are aggrieved.
4. Decision Authority: The Procurement Manager will review and decide on the protest within ten (10) business days of receiving it. The decision will address the issues raised and will be final.
Award Delay: If a protest is filed, the Procurement Manager may choose to delay the award until the protest is resolved.
D.4 GRATUITIES AND KICKBACKS:
It shall be a breach of ethical standards for any person to offer, give, or agree to give any employee or former employee (within six months of termination from City employment), to solicit, demand, accept, or agree to accept from another person, a gratuity or an offer of employment in connection with any decision, approval, disapproval, recommendation, preparation of any part of a program requirement or a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding of application, request for ruling, determination, claim or controversy, or other particular matter, pertaining to any program requirement or a contract or subcontract, or to any solicitation or proposal therefore.
It shall be a breach of ethical standards for any payment, gratuity, or offer of employment to be made by or on behalf of a Subcontractor under a contract to the prime Contractor or higher tier Subcontractor or any person associated therewith, as an inducement for the award of a subcontract or order.
In the event that any gratuities or kickbacks are offered or tendered to any City of Westminster employee, the proposal shall be disqualified and shall not be reinstated.
D.5 NON-COLLUSIVE PROPOSER CERTIFICATION:
By the submission of this proposal, the Proposer certifies that:
1. The proposal has been arrived at by the Proposer independently and has been submitted without collusion with any other Proposer.
2. The contents of the proposal have not been communicated by the Proposer, nor, to its best knowledge and belief, by any of its employees or agents, to any person not an employee or agent of the Proposer or its surety on any bond furnished herewith, and will not be communicated to any such person prior to the official opening of the proposal.
3. No Proposer shall submit more than one proposal for this purchase. It shall be the responsibility of each Proposer to obtain the prior written permission of the Procurement Manager before proposal opening in every situation in which the Proposer, due to corporate association or other affiliation, may be found to be impermissibly associated with another Proposer. Failure to observe this requirement could result in all such affiliated proposals being rejected.
4. Any proposer with multiple submissions, shall only have the last proposal considered to accommodate technical difficulty deleting a previous submission.
5. Conflict of Interest Disclosure. Each Proposer shall disclose in its proposal any actual, potential, or perceived conflict of interest, including any current or prior relationship with the City, its officials, or employees, that could affect the Proposer's objectivity or the integrity of the selection process. Failure to disclose a known conflict may result in disqualification.
D.6 DISCLOSURE OF CONTENTS OF PROPOSALS:
The contents of all proposals become a matter of public record and a “Record” under the Colorado Open Records Act, § 24-72-201, et seq., C.R.S. (“CORA”). Upon request to the City, the disclosure of Records is mandatory, with the exception of those Records under CORA which are excluded from disclosure sometimes identified as business or trade secrets or proprietary matters (“Protected Items”). Protected Items so marked may not be disclosed unless disclosure is otherwise required under CORA. If a request is made under CORA for Records, the City will use reasonable efforts to notify the Proposer of the request, and it will be the responsibility of the Proposer to appropriately redact Protected Items from its submittal to the City. If a Proposer does not respond to the City to redact Protected Items as requested all Records may be disclosed by the City. If necessary, a Proposer shall seek a court order to protect their
Protected Items, and will defend, indemnify, and hold harmless the City from any claim or action related to the City’s withholding of Protected Items.
D.7 COOPERATIVE PURCHASING:
The City of Westminster encourages and participates in cooperative purchasing endeavors undertaken by or on behalf of other governmental jurisdictions including the Multiple Assembly of Procurement Officials (MAPO) and the Cooperative Educational Purchasing Council (CPEC). We hereby request that any member of MAPO/CPEC be permitted to avail itself of this contract and purchase as specified by the contract resulting from this solicitation request, at the contract prices established therein. Each governmental entity would establish its own contract, issue its own orders, be invoiced directly, make its own payments and issue its own exemption certificates as required. It is understood and agreed that the City of Westminster is not a legally binding party to any contractual agreement made between another governmental entity and the Contractor as a result of this solicitation. The City shall not be liable for any costs or damages incurred by any other entity.
| SECTION A: RFP OVERVIEW AND PROJECT REQUIREMENTS |
| A.1 INTRODUCTION: |
| A.2 PROJECT DESCRIPTION |
| A.3 TERM: |
| A.4 SCOPE OF WORK/ REQUIREMENTS |
| A.5 RFP ATTACHMENTS: |
| A.6 WORK SCHEDULE |
| A.7 PRE-PROPOSAL CONFERENCE: |
| A.8 ELECTRONIC SUBMISSION OF PROPOSALS AND COMMUNICATION: |
| A.9 CLARIFYING QUESTIONS: |
| A.10 ADDENDA: |
| A.11 PRICING: |
| A.12 PRICE REDETERMINATION: |
| A.13 PAYMENT TERMS: |
| A.14 INSURANCE REQUIREMENTS: |
| SECTION B: PROPOSAL SUBMISSION REQUIREMENTS |
| B.1 GENERAL SUBMISSION INFORMATION: |
| B.2 CHANGES: |
| B.3 MODIFICATIONS TO PROPOSAL: |
| B.4 CONTRACT DOCUMENTS: |
| B.5 ACCEPTANCE PERIOD: |
| B.6 PROPOSAL CONTENTS AND FORMAT: |
| SECTION C: EVALUATION AND AWARD |
| C.1 EVALUATION OVERVIEW |
| C.2 PROPOSAL EVALUATION ITEMS: |
| *The City reserves the right to conduct interviews with shortlisted proposers at its sole discretion. |
| C.3 EVALUATION AND SELECTION: |
| C.4 AWARD TYPE: |
| C.5 NOTICE TO PROCEED: |
| SECTION D: GENERAL RFP AND CONTRACT INFORMATION |
| D.1 PAYMENT CONDITIONS: |
| D.2 RFP CONDITIONS AND PROVISIONS: |
| D.4 GRATUITIES AND KICKBACKS: |
| D.5 NON-COLLUSIVE PROPOSER CERTIFICATION: |
| D.6 DISCLOSURE OF CONTENTS OF PROPOSALS: |
| D.7 COOPERATIVE PURCHASING: |
File details come from the government source that posted it. Updated .