This is a Request for Proposals (RFP) issued by the Town of Eagle, Colorado for engineering services to prepare a Water System Assessment and Water System Master Plan Update. The Town seeks qualified firms or individuals with demonstrated experience in water system master planning to develop a comprehensive 50-year plan addressing the Town's water supply, treatment, and distribution needs. The proposal submission deadline is December 15, 2026 at 2:00 p.m. Mountain Time, with questions due by December 1, 2026 at 2:00 p.m. and a final addendum issued by December 8, 2026 at 2:00 p.m. The anticipated award notification is scheduled for the week of February 8, 2027, with interviews potentially occurring on February 1, 2027. The contract will be a fixed-price Professional Services Agreement based on the agreed-upon scope of services, with the term extending until the contractor completes the scope of services to the Town's satisfaction or until terminated with 30 days' advance written notice by either party.

The RFP requires a fixed-price compensation model with all fees, costs, and expenses included in a single amount, with periodic invoicing to be paid within 30 days of receipt. Proposals are limited to 15 pages (excluding cover letter, fee schedule, and appendices) and will be evaluated based on the following criteria: strength and experience of the design team (30%), scope of services (25%), schedule (15%), total cost (20%), overall responsiveness (5%), and local/state preference (5%). Insurance requirements include workers' compensation, commercial general liability with minimum combined single limits of $1,000,000 per occurrence and $2,000,000 general aggregate, and professional liability insurance with minimum limits of $1,000,000 per claim and $2,000,000 general aggregate. The Town reserves the right to negotiate any elements of the proposal and may reject any responses not in compliance with solicitation procedures. Proposals must be submitted via email to Dylan Omalia and Stephan Wilson with delivery and read receipts included.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid for Proposals

Town of Eagle, Colorado

Water System Assessment & Water System Master Plan Update

Engineering Services

November 4th, 2026

SubmiHal Deadline:

December 15, 2027 @ 2:00 PM

Request for Proposals

The Town of Eagle, Colorado is accep5ng proposals from qualified individuals or firms to provide a Town of Eagle Water Master Plan update in accordance with the terms, condi5ons, and specifica5ons contained in these documents. Offerors wishing to par5cipate should ensure they have all addenda prior to submission of proposal. Failure to acknowledge receipt of any addenda applicable to this project could result in the rejec5on of your proposal.

This project and any subsequent addenda will be posted to the Rocky Mountain E-Purchasing website (www.bidnetdirect.com/colorado) then click on Vendor Login or Vendor Registra5on, as applicable).

QuesRons and Deadline: December 1st, 2026 Time: 2:00 p.m. (Mountain Time)

All proposals and ques5ons shall be submiOed in wri5ng via email to:

Stephan.wilson@townofeagle.org and Dylan.omalia@townofeagle.org

Include delivery receipt and read receipt with proposal email submissions.

Ques5ons received aVer the deadline may not be accepted.

Final Addendum: December 8, 2026 Time: 2:00p.m. (Mountain Time)

Due Date and Time: December 15, 2026 2:00 p.m. (Mountain Time)

SubmiOal requirements are outlined in the SubmiOals Sec5on of the Bid Documents.

It is the sole responsibility of the respondent to see that the proposal is received before the submission deadline. Late proposals will not be considered.

All proposals submiOed shall be binding upon the respondent if accepted by the Town within sixty (60) calendar days of the submission date. Negligence upon the part of the respondent in preparing the proposal confers no right of withdrawal aVer the 5me fixed for the submission of proposal.

Stephan Wilson, PE

URlity Manager - Town of Eagle mailto:Stephan.wilson@townofeagle.org mailto:dylan.omalia@townofeagle.org

Contents

SECTION 1 – INVITATION FOR PROPOSALS 1

SECTION 2 – INTRODUCTION AND BACKGROUND 1

SECTION 3 – TOWN OF EAGLE SYSTEM ASSESSMENT AND PLAN GOALS 2

SECTION 4 – SCOPE OF WORK AND DELIVERABLES 4

Task 1 – Project Management. 4

Task 2 – Resource Documents and Data Review. 4

Task 3 – Facili5es Inventory – Exis5ng System Descrip5on. 5

Task 4 – Exis5ng Water Projects and Development Ac5vity. 5

Task 5 – Update Popula5on and Water Demand Es5mates and Forecast. 5

Task 6 – Water Supply Analysis. 5

Task 7 – Evalua5on of Alterna5ve Water Sources for Use. 6

Task 8 – Hydraulic Modeling and Calibra5on. 6

Task 9 – System Planning and Analysis Criteria. 6

Task 10 – Water Storage Volume and Opera5onal Requirements. 6

Task 11 – Capital Improvements Plan (CIP) Update. 6

Task 12 – Prepare Water Supply, System Assessment, and Treatment Master Plan Report. 7

Task 13 – Public Open House 7

Task 14 – Policy Maker Presenta5ons & Plan Adop5on. 7

SECTION 5 – COMPENSATION 8

SECTION 6 – PROPOSAL AND PROPOSER REQUIREMENTS 8

SELECTION PROCESS 8

SCHEDULE 9

EXISTING DOCUMENTS (available upon request) 9

SUBMITTAL PROCESS 9

TERMS AND CONDITIONS 9

ATTACEMENTS 10

SECTION 1 – INVITATION FOR PROPOSALS

The Town of Eagle Municipal Government Organiza5on is issuing a Request for Proposals (RFP) from qualified firms or individuals with demonstrated experience in preparing water system assessments master plans. To be considered, interested par5es must submit their proposals in accordance with the requirements set forth in the RFP.

In general terms, the Proposer will provide to the Town a future picture of its water supply, treatment, and distribu5on needs, required infrastructure to meet those needs, and a plan to achieve those needs over a 50-year 5me horizon.

This plan should follow industry best prac5ces for the prepara5on of master planning documents.

It is an5cipated this will require a review of the exis5ng water system, evalua5on of current water supply pormolio, a conceptual understanding of land use and poten5al development paOerns for the Town, a review of research and data on regional climate and water resource trends, and a forecast of future popula5on growth based on the State of Colorado Demography Office Popula5on Es5mates. The Proposer will need to project future water demand, review water requirements, develop planning and analysis criteria, analyze the current water system, and develop a capital build-out and improvement program.

Responses to this RFP will be reviewed, scored, and ranked according to the criteria and process defined in this RFP. The Proposer selected for contract nego5a5ons will be the firm selected as the most qualified through the evalua5on process.

If requested, there will be one pre-proposal mee5ng for this RFP.

Interviews with proposers may be conducted following the receipt of bid proposals.

Responses received aVer the designated closing date and 5me will not be reviewed. The Town may reject any response not in compliance with all prescribed solicita5on procedures and requirements and other applicable law and may reject any or all responses in whole or in part when the cancella5on or rejec5on is in the best interest of the Town, and at no cost to the Town.

The Town's purpose is to invest in cri5cal infrastructure, assets, and program improvements that increase our residents' quality of life and add to our vibrant economy without crea5ng any undue burden on the residents of the Town.

SECTION 2 – INTRODUCTION AND BACKGROUND

The Town of Eagle Community - Located on the western slope of the Rockies, halfway between Denver and Grand Junc5on. The Town of Eagle has a popula5on of approximately 7,500 and a service area eleva5on between 7,800’ to 6,500’. Eagle offers access to epic mountain biking, trail running and hiking, golf, kayaking, snowmobiling, hun5ng, and gold medal fly fishing. In addi5on to various public parks, there are over 1,000 acres of Town-owned public open space. Located a short drive from Vail and Beaver Creek, residents also enjoy world-class ameni5es provided by these resorts. The Eagle County Regional Airport is five miles west of Town and serves commercial and private avia5on. Eagle is a thriving community and a beau5ful place to live, work, and play.

The Town's Organiza5on - Established in 1887 and incorporated in 1905, the Town of Eagle became the County seat in 1921 and adopted a home rule charter in 2020. The Town is a council-managed form of government led by a 7-member Town Council elected for four-year terms. The Town Council appoints the Town Manager, Town AOorney, and Municipal Court Judge. The Town has approximately 70 dedicated employees with an average longevity of 4 years. Eagle provides a full range of services, including police protec5on, water, wastewater, stormwater, refuse services, street and park maintenance, community and economic development, open space management, and event planning. The Greater Eagle Fire Protec5on District provides fire services.

The Water service area for the Town includes areas adjacent to the Town boundaries and increases the popula5on served for water service to 3,300 taps totaling 7,500 resident popula5on served.

The Town’s water system provides drinking water to residen5al, commercial, parks, and ins5tu5onal service connec5ons. The Town’s sources of water supply include raw water from both the Brush Creek Watersheds and Eagle River that is treated at the Town’s 4.3 MGD Upper Basin Water Treatment Plant (UBWTP) and 2.5 MGD Lower Basin Water Treatment Plant (LBWTP). The topography of the Brush Creek Water Shed resulted in our Town water system having eleven (11) pressure zones, nine (9) tanks, eleven

(11) pressure reducing valves, and six (6) pump sta5ons.

The primary objec5ves of the Water System Assessment and water master plan are to project the water supply needs of Eagle, iden5fy necessary improvements and facili5es that may be required over 5me, and to priori5ze the capital improvements related both to maintenance and to growth of supply, treatment and distribu5on systems. This informa5on will be used by the Town to develop planning documents, which will include its annual five-year, ten-year, and twenty-year Capital Improvement Program (CIP) with each annual budget cycle for the next several years. An addi5onal objec5ve is to provide Town staff with a report that will be a day-to-day planning tool that Town can use to guide their decisions for the future.

Generally, the system consists primarily of cast iron, duc5le iron, HDPE, and C-900 PVC pipe. Cast iron water mains were installed predominantly in the 1950’s and 1960’s and have generally been replaced with newer duc5le. The newer distribu5on piping is duc5le iron with some C-900 installa5ons since 2000. The Town con5nues to grow and projects expanding the distribu5on system through this growth.

Water tanks are constructed of welded steel with newer tanks being glass lined. The Town plans to construct new tanks from concrete (AWWA-D110).

The Town completed a master plan in 1996, Water System Assessment in 2016, Water Storage Tank Condi5on Assessment in 2022, and DOVE Project in 2026.

SECTION 3 – TOWN OF EAGLE SYSTEM ASSESSMENT AND PLAN GOALS

The Mayor, Town Council members, and employees are commiOed to achieving our Mission - Maintaining and Enhancing the Quality of Life for Everyone. The following significant objec5ves reaffirm the Town's commitment to Quality of Life and are designed to guide the Town's current and future endeavors.

The Town of Eagle has established goals for the opera5ons of its local municipal government which extend to the opera5ons of its u5li5es as outlined below.

Council goals that apply most directly to the water supply and treatment systems include environmental resilience with responsible stewardship of resources, support of efficiency and progress in developing water supply and treatment capabili5es.

In general, the Town would like to accomplish the following objec5ves with this RFP and subsequent work:

- In general terms, the Proposer will provide to the Town a future picture of its water supply, treatment, and distribu5on needs, required infrastructure to meet those needs, and a plan to achieve those needs over a 50-year 5me horizon. The Town intends to maintain and update the plan at a regular interval.

- Assess, iden5fy, and priori5ze improvements at the UBWTP, and LBWTP. Most of this effort will be focused on needs at the UBWTP.

o Iden5fy and priori5ze more immediate maintenance and repair needs focused primarily at the needs of the UBWTP

- Inform infrastructure needs associated with supply, treatment, and distribu5on facili5es.

- Provide for long term water supply planning to specifically address capacity, reliability and redundancy of the supply and treatment systems over the planning horizon

- Iden5fy and priori5ze CIP projects. (prior to new water rate study)

- Prepare a working calibrated hydraulic water model of the Town’s en5re water distribu5on network.

- Review of the water system’s capacity to treat and distribute for typical daily demand and fire flows currently and in the future

- Make recommenda5ons on how the Town should collect and build out the GIS system for the

U5lity.

- Provide a methodology for short-term evalua5on of the plan based on updated informa5on, allowing for 5 year “check-ins” as to supply, demand and capacity

Internal Town Goals:

1) Iden5fy and priori5ze CIP projects prior to new water rate study and plant investment fee (PIF) study

a. Be able to iden5fy how much infrastructure it takes to serve each major zone.

S5mulate Economic vitality and development.

Improve Community Responsive Services.

Match Infrastructure to Quality of life.

AOract Visitors Focus on Recrea5on Events and Open Space.

Strengthen Town organiza5on and culture.

Enhance the economic resiliency of the Town government.

Invest in environmental and energy sustainability.

Diversify the aOainable housing Stock.

2) Begin to commonly define an EQR/SFRE between water right, water rates, PIF applica5ons, and wastewater.

SECTION 4 – SCOPE OF WORK AND DELIVERABLES

The Scope of Work (SOW) tasks which are described in this sec5on shall be included in the Proposers SOW. The Proposer may expand upon these tasks as needed to prepare a complete WMP based on their experience. In addi5on, if there are tasks which the Proposer believes should be part of the SOW, these tasks shall be included as op5onal tasks in their proposed SOW.

The Town expects the Proposer to iden5fy the assump5ons, work products, and input for each of the tasks described in this sec5on of the RFP. The quan5ty of each deliverable will be addressed during final scoping, fee, and schedule nego5a5on.

Task 1 – Project Management.

Each Proposer shall include Project Management as one of the work tasks. The following Project Management descrip5on is the minimum project management requirements and may be expanded upon by the Proposer:

The Proposer shall act as a manager of the Proposer’s team, including any sub-consultants. The Proposer shall manage and coordinate all components of the Project and take a proac5ve role in keeping all tasks on schedule and budget and ensure 5mely comple5on of the Project. Proposer shall give prior no5ce to Town, and obtain acceptance from same, before performing work outside the contract work scope and thereby contract budget amount. The Proposer shall ensure full coordina5on with Town staff and be responsive to any email and telephone discussions, in addi5on to the minimum mee5ngs as listed under various tasks in the scope of work. The Proposer shall be in contact with the Town frequently enough to ensure a 5mely Town review of deliverables. The Proposer is expected to work with all stakeholders in a responsible manner.

The Proposer shall organize a kickoff mee5ng with Town staff:

• Define project goals and objec5ves

• Outline project and management approach

• Iden5fy roles and responsibili5es

• Confirm scope and schedule

Proposer shall prepare all project related agendas and mee5ng minutes. All agendas and the suppor5ng informa5on shall be distributed via emails to the Town’s Project Manager.

Mee5ng minutes shall be distributed to all aOendees and any other iden5fied par5es within five (5) business days of the mee5ng date. Submit a summary report of work completed by sub-tasks for the invoice period with each invoice. Alert the Town if any issues or concerns may affect the progress and/or cost of the project.

Task 2 – Resource Documents and Data Review.

Proposer shall review the 1996 Master Plan in 1996, Water System Assessment from 2016, Water Storage Tank Condi5on Assessment in 2022, and DOVE Project Record of Approved Water Works documents from 2026. Proposer shall also review current water system informa5on (GIS mapping, water supply, pumping and storage volumes, and other per5nent data). Proposer will discuss other necessary or desirable reports or data with the Town to determine sources and availability of such resources.

Task 3 – FaciliOes Inventory – ExisOng System DescripOon.

This task is intended to set the context for the subsequent water supply, treatment, and distribu5on analysis. The majority if this effort will focus on the current condi5on and immediate facility needs at the Town’s Upper Basin Water Treatment Plant (UBWTP). This task will also include planning for the full buildout of the LBWTP to 5 MGD, comple5on of wells No. 1 and No. 2. and key booster pump sta5on replacements.

Proposer shall update the water system descrip5on to include, at a minimum:

• System background

• Current and future water service area descrip5on and boundary defini5on

• Exis5ng distribu5on system pressure zone characteriza5on and boundary defini5ons

• Inventory of exis5ng facili5es (water rights, source of supply, diversion points, delivery systems, reservoirs, treatment process and capacity, distribu5on piping, pumps, tanks and other facili5es)

Task 4 – ExisOng Water Projects and Development AcOvity.

Proposer shall work with Town staff to develop understanding of exis5ng Town water projects and development ac5vity trends within and around the water service area. The water projects and development projects include but are not limited to the following:

• Review completed and in-progress CIP projects

• Development ac5vity and outlook

• Summarize a list of addi5onal improvements needed within the 50-year planning horizon

• Summarize previously recommended improvements that are no longer needed or feasible

Task 5 – Update PopulaOon and Water Demand EsOmates and Forecast.

Prepare an updated forecast of popula5on and water demand for a 50-year planning horizon. Popula5on forecast will be based on the State of Colorado, State Demography Office Popula5on Es5mates.

The Town an5cipates iden5fica5on of two (2) popula5on growth scenarios defined as low growth, and high growth. These scenarios will be used for es5ma5ng popula5on forecasts and water demands.

Proposer shall summarize current water demands based on available water produc5on and customer billing data. Forecast future water requirements based on available land use informa5on and current water use by customer type for the two growth scenarios. Review projected future water requirements for consistency with other Town planning documents and an5cipated development 5melines.

Task 6 – Water Supply Analysis.

Proposer shall prepare a high level analysis of the Town’s long-term water supply needs and develop a strategy for mee5ng water supply goals (capacity, reliability, redundancy, etc.). The analysis shall iden5fy and address water rights, par5cipa5on in regional water supply developments, and evalua5on of poten5al emergency sources of supply.

This analysis should iden5fy poten5al threats to each supply scenario, with at least one of those threats iden5fying the impacts of climate change and another being an in basin wildfire. The threat evalua5on should iden5fy and evaluate the best sources of available data, poten5ali5es of threats and probabili5es of resul5ng changes in supply as a result.

Task 7 – EvaluaOon of AlternaOve Water Sources for Use.

The objec5ve of this Task is to evaluate alterna5ves of water supply at a high level for the Town of Eagle.

This should consider current water resources and poten5al regional water resources which may include surface or groundwater sources. This evalua5on should evaluate alterna5ves based on costs, poten5al yield, water quality, operability, and administra5ve considera5ons (water rights, access, O&M requirements, and ownership).

Task 8 – Hydraulic Modeling and CalibraOon.

• Update and validate the Town’s current water model based on new development. The Town would prefer an all pipes model, but is open to an alterna5ve approach.

• Make recommenda5ons on how the Town should collaborate GIS system data collec5on efforts with the need to develop and maintain working water and sewer models.

• Provide modeling soVware training to Town staff

Task 9 – System Planning and Analysis Criteria.

Proposer shall review and update capacity and performance criteria for evalua5ng facili5es including:

• Source capacity, redundancy, and quality

• Raw and treated Storage capacity

• Treatment system capacity

Task 10 – Water Storage Volume and OperaOonal Requirements.

Proposer shall evaluate the present and future water storage volume and opera5on needs of the system.

This should include analysis of the need for future water storage demands both raw and treated, with poten5al site op5ons. The sites may occur within or outside the Town limits. Analyze under what condi5ons and how much of storage Town may access from exis5ng and future Reservoirs under different water demand condi5ons.

Task 11 – Capital Improvements Plan (CIP) Update.

Proposer shall prepare a priori5zed CIP list of water system improvements for the next 50-year planning period based on the findings of the work described in this RFP. The CIP shall address both supply and treatment system renewal and replacement, capacity expansion needs, and facility needs. Capacity expansion needs of the distribu5on system should also be included; renewal and replacement of current distribu5on infrastructure will be provided in the current system assessment study.

The Proposer shall prepare planning level es5mates for all projects and future facili5es proposed including diversion point improvements, raw water pumping, raw water transmission lines, system controls, reservoir maintenance, treatment process improvements/replacement, tanks, transmission lines, pump sta5ons and other facili5es which may be needed.

The Proposer shall prepare a project summary sheet for each project which will appear in the CIP. The data sheet will include a map loca5ng the project, a descrip5on of the goal and scope of the project, the planning level project cost, any associated planning level annual opera5ng costs, a lis5ng of required preceding projects within the CIP and any other assump5ons which form the basis of the cost es5mate.

A copy of this CIP will be provided in an editable format for ongoing upda5ng.

Task 12 – Prepare Water Supply, System Assessment, and Treatment Master Plan Report.

The Proposer will prepare a DraV Water Supply and Treatment Master Plan summarizing the study and all work tasks. The DraV Master Plan will include drawings, maps, and graphics, reflec5ng the informa5on gathered and prepared. A draV of the report and a draV execu5ve summary of the report will be provided to the Town for ini5al staff review. This execu5ve summary will be less than five pages, and summarize the overall goals, direc5on, meanings, and implica5ons of the Master Plan. The execu5ve summary should be wriOen in simple, plain language directed at the layperson.

Following the public comment period, A Final Master Plan will be prepared incorpora5ng comments received on the DraV Master Plan. Color copies will be used for any graphics in the Final Master Plan. In addi5on to the complete Final Master Plan, a short, stand-alone Execu5ve Summary will be finalized and provided as well.

Proposer should an5cipate including any sensi5ve, or confiden5al, material as part of an appendix that will be removed from all electronic and hard copy versions of the Plan distributed to the public.

The Town will review a draV of the document and any comments will be incorporated into the final Execu5ve Summary. Proposer shall provide a table of contents that would be included in the Water Master Plan in their proposal.

Task 13 – Public Open House During the public comment period the Proposer shall plan and conduct a public open house within the community in coordina5on with Town Staff. The Proposer will need to include and prepare for the following:

• Prepara5on and provision of a Fact Sheet regarding the DraV Plan for provision at least two weeks prior to an open house. This fact sheet should include the purpose of the master plan, process of its development, and other informa5on to foster public understanding of the plan.

• Exhibits for an open house, which may include infographics, drawings, and maps to present the findings of the informa5on.

• Prin5ng of handouts, exhibits, and other items to conduct the open house session

• AOendance and leadership for the open house session in coordina5on with Town Staff.

• Collec5on of public input, a debrief, and prepara5on of public comments from the mee5ng.

Task 14 – Policy Maker PresentaOons & Plan AdopOon.

Consultant shall present the draV Water Supply and Treatment Master Plan to the Town Council for adop5on. It is an5cipated that the Proposer will present the Plan at one study session where input will be received and again in one formal Council mee5ng once the final draV has been provided to answer ques5ons about the plan.

The consultant shall be responsible for all project management services, including project schedules, status mee5ng agendas, and minutes, as well as keeping a wriOen log of all design decisions and informal mee5ngs.

SECTION 5 – COMPENSATION

The Town of Eagle expects to retain engineering services on an agreed-upon fixed base Professional Services Agreement based on the scope of services to be rendered.

SECTION 6 – PROPOSAL AND PROPOSER REQUIREMENTS

The Town reserves the right to nego5ate any and all elements of this proposal.

This RFP includes a project descrip5on, scope of work, submission requirements, selec5on process and criteria, insurance requirements, and Sample Standard Form of Agreement between Town and Contractor for Professional Services Agreement. Sample Agreement is for reference only and is non-nego5able.

SELECTION PROCESS

Responses to this Request for Proposal will be evaluated based on the following criteria. SubmiOals shall not exceed 15 pages in length, excluding any suppor5ng documenta5on, manuals and/or brochures that may be included.

• Cover LeHer (not included in page count)

• QualificaRons of Project Team: Briefly explain the proposer's qualifica5ons to provide the services requested and informa5on regarding the experience and qualifica5ons of the team working on the project.

• Team Experience on Past Projects with Similar Scope: The consultant's demonstrated capability, qualifica5ons, exper5se, and experience on similar or related projects as a team and individually. List current and past examples of completed work that is similar in size and scope.

Include references and project budgets.

• Approach to Project: Address the firm's technical and project management approach to the project. Include a descrip5on of tools used to control costs, establish, and meet schedules, and provide quality work. Also, include a schedule to complete the project.

• Fee schedule for services (not included in page count)

• Appendix- Resumes and CommendaRons (Not included in page count)

A selec5on commiOee comprised of Town personnel will evaluate the proposals. Members of the Selec5on CommiOee will review and rate each proposal based on the following criteria:

1. Strength, capability and experience of the design team (30%);

2. Scope of Services (25%);

3. Schedule (15%)

4. Total cost to the Town (20%);

5. Overall responsiveness to the RFP (5%); and

6. Local (state) preference (5%).

SCHEDULE

The following 5meline is intended to provide a tenta5ve schedule for this project. The Town of Eagle reserves the right to modify the 5meline, without prior no5ce, at its sole convenience.

➢ Publica5on November 4, 2026

➢ Ques5ons Due December 1, 2026 2:00 p.m. (MST)

➢ Final Addendum Issued, if necessary, December 8, 2026 2:00 p.m. (MST)

➢ Proposals Due 2:00 p.m. (Local Time), December 15, 2026

➢ Evalua5on of Proposals week of January 11, 2027

➢ No5fica5on of Short List, if necessary, January 14, 2027

➢ Interviews, if necessary, Teams mee5ng February 1, 2027

➢ No5ce of Award week of February 8, 2027

EXISTING DOCUMENTS (available upon request)

• Town U5lity Map

• Master Plan - 1996

• Water System Assessment - 2016

• DOVE Project - 2026

• Hydraulic Model

• Brush Creek Watershed Management Plan

SUBMITTAL PROCESS

• Proposals (excluding cover page, fee schedule, and appendix) shall be limited to fiVeen (15) 8

1/2" x11" pages with an 11-point font size. Two 11 x 17" pages can be subs5tuted for two 8 ½" x 11" page.

• All proposals and ques5ons shall be submiOed in wri5ng via email to:

dylan.omalia@townofeagle.org cc: Stephan.wilson@townofeagle.org

• Include delivery receipt and read receipt with proposal email submissions.

TERMS AND CONDITIONS

• The Town may choose to republish this RFP at the Town's sole discre5on.

• The Town reserves the right to accept or reject any proposals and waive any informali5es or irregulari5es. The RFP does not bind the Town to hire a consultant when, at the Town's sole discre5on, the Town determines not to do so.

mailto:dylan.omalia@townofeagle.org mailto:Stephan.wilson@townofeagle.org

• Un5l the Professional Services Agreement is executed, there are no expressed or implied obliga5ons or commitments on the Town's or the consultant's part concerning this RFP or any proposal associated with it.

• By submizng materials for the Town's considera5on according to this RFP, the consultant waives any claim of confiden5ality, trade secrets, or privilege concerning the materials submiOed. All submiOal materials are subject to disclosure under the Colorado Open Records Act.

• No oral ques5ons will be answered. However, if addi5onal informa5on or clarifica5on is desired, email requests should be made to the Town at the above email address.

• The selected firm or individual will work under a Professional Services Agreement. Once an Agreement is nego5ated, the following documents will be required by the assigned consultant before the commencement of any work:

o Signed contract by both the Town and the consultant(s).

o Proof of insurance per Professional Services Agreement.

o Most current W-9.

ATTACEMENTS

➢ Sample: AGREEMENT FOR PROFESSIONAL SERVICES

AGREEMENT FOR PROFESSIONAL SERVICES

THIS AGREEMENT FOR PROFESSIONAL SERVICES (the "Agreement") is made and entered into this ___ day of ____________, 2027 (the "Effec5ve Date"), by and between the Town of Eagle, a Colorado home rule municipality with an address of PO Box 609, Eagle, Colorado 81631 (the "Town") and ______________, a ______________ with an address of ___________________ ("Contractor") (each a "Party" and collec5vely the "Par5es").

WHEREAS, the Town requires professional services; and

WHEREAS, Contractor has held itself out to the Town as having the requisite exper5se and experience to perform the required services.

NOW, THEREFORE, for the considera5on hereinaVer set forth, the receipt and sufficiency of which are hereby acknowledged, the Par5es agree as follows:

I. SCOPE OF SERVICES

A. Contractor shall furnish all labor and materials required for the complete and prompt execu5on and performance of all du5es, obliga5ons, and responsibili5es which are described or reasonably implied from the Scope of Services set forth in Exhibit A, aOached hereto and incorporated herein by this reference.

B. A change in the Scope of Services shall not be effec5ve unless authorized as an amendment to this Agreement. If Contractor proceeds without such wriOen authoriza5on, Contractor shall be deemed to have waived any claim for addi5onal compensa5on, including a claim based on the theory of unjust enrichment, quantum merit or implied contract. Except as expressly provided herein, no agent, employee, or representa5ve of the Town is authorized to modify any term of this Agreement, either directly or implied by a course of ac5on.

II. TERM AND TERMINATION

A. This Agreement shall commence on the Effec5ve Date, and shall con5nue un5l Contractor completes the Scope of Services to the sa5sfac5on of the Town, or un5l terminated as provided herein.

B. Either Party may terminate this Agreement upon 30 days' advance wriOen no5ce. The Town shall pay Contractor for all work previously authorized and completed prior to the date of termina5on. If, however, Contractor has substan5ally or materially breached this Agreement, the Town shall have any remedy or right of set-off available at law and equity.

III. COMPENSATION

In considera5on for the comple5on of the Scope of Services by Contractor, the Town shall pay Contractor $___________. This amount shall include all fees, costs and expenses incurred by Contractor, and no addi5onal amounts shall be paid by the Town for such fees, costs and expenses. Contractor may submit periodic invoices, which shall be paid by the Town within 30 days of receipt.

IV. RESPONSIBILITY

A. Contractor hereby warrants that it is qualified to assume the responsibili5es and render the services described herein and has all requisite corporate authority and professional licenses in good standing, required by law. The work performed by Contractor shall be in accordance with generally accepted professional prac5ces and the level of competency presently maintained by other prac5cing professional firms in the same or similar type of work in the applicable community. The work and services to be performed by Contractor hereunder shall be done in compliance with applicable laws, ordinances, rules and regula5ons.

B. The Town's review, approval or acceptance of, or payment for any services shall not be construed to operate as a waiver of any rights under this Agreement or of any cause of ac5on arising out of the performance of this Agreement.

C. Because the Town has hired Contractor for its professional exper5se, Contractor agrees not to employ subcontractors to perform any work except as expressly set forth in the Scope of Services.

V. OWNERSHIP

Any materials, items, and work specified in the Scope of Services, and any and all related documenta5on and materials provided or developed by Contractor shall be exclusively owned by the Town. Contractor expressly acknowledges and agrees that all work performed under the Scope of Services cons5tutes a "work made for hire." To the extent, if at all, that it does not cons5tute a "work made for hire," Contractor hereby transfers, sells, and assigns to the Town all of its right, 5tle, and interest in such work. The Town may, with respect to all or any por5on of such work, use, publish, display, reproduce, distribute, destroy, alter, retouch, modify, adapt, translate, or change such work without providing no5ce to or receiving consent from Contractor.

VI. INDEPENDENT CONTRACTOR

Contractor is an independent contractor. Notwithstanding any other provision of this Agreement, all personnel assigned by Contractor to perform work under the terms of this Agreement shall be, and remain at all 5mes, employees or agents of Contractor for all purposes.

Contractor shall make no representa5on that it is a Town employee for any purposes.

VII. INSURANCE

A. Contractor agrees to procure and maintain, at its own cost, a policy or policies of insurance sufficient to insure against all liability, claims, demands, and other obliga5ons assumed by Contractor pursuant to this Agreement. At a minimum, Contractor shall procure and maintain, and shall cause any subcontractor to procure and maintain, the insurance coverages listed below, with forms and insurers acceptable to the Town.

1. Workers' Compensa5on insurance as required by law.

2. Commercial General Liability insurance with minimum combined single limits of $1,000,000 each occurrence and $2,000,000 general aggregate. The policy shall be applicable to all premises and opera5ons, and shall include coverage for bodily injury, broad form property damage, personal injury (including coverage for contractual and employee acts), blanket contractual, products, and completed opera5ons. The policy shall contain a severability of interests provision, and shall include the Town and the Town's officers, employees, and contractors as addi5onal insureds. No addi5onal insured endorsement shall contain any exclusion for bodily injury or property damage arising from completed opera5ons.

3. Professional liability insurance with minimum limits of $1,000,000 each claim and $2,000,000 general aggregate.

B. Such insurance shall be in addi5on to any other insurance requirements imposed by law. The coverages afforded under the policies shall not be cancelled, terminated or materially changed without at least 30 days' prior wriOen no5ce to the Town. In the case of any claims-made policy, the necessary retroac5ve dates and extended repor5ng periods shall be procured to maintain such con5nuous coverage. Any insurance carried by the Town, its officers, its employees, or its contractors shall be excess and not contributory insurance to that provided by Contractor. Contractor shall be solely responsible for any deduc5ble losses under any policy.

C. Contractor shall provide to the Town a cer5ficate of insurance showing the required policies are in full force and effect. The cer5ficate shall iden5fy this Agreement.

VIII. INDEMNIFICATION

A. Contractor agrees to indemnify and hold harmless the Town and its officers, insurers, volunteers, representative, agents, employees, heirs and assigns from and against all claims, liability, damages, losses, expenses and demands, including attorney fees, on account of injury, loss, or damage, including without limita5on claims arising from bodily injury, personal injury, sickness, disease, death, property loss or damage, or any other loss of any kind whatsoever, which arise out of or are in any manner connected with this Agreement if such injury, loss, or damage is caused in whole or in part by, the act, omission, error, professional error, mistake, negligence, or other fault of Contractor, any subcontractor of Contractor, or any officer, employee, representa5ve, or agent of Contractor, or which arise out of a worker's compensa5on claim of any employee of Contractor or of any employee of any subcontractor of Contractor. Contractor's liability under this indemnification provision shall be to the fullest extent of, but shall not exceed, that amount represented by the degree or percentage of negligence or fault attributable to Contractor, any subcontractor of Contractor, or any officer, employee, representative, or agent of Contractor or of any subcontractor of Contractor.

B. If Contractor is providing architectural, engineering, surveying or other design services under this Agreement, the extent of Contractor's obligation to indemnify and hold harmless the Town may be determined only after Contractor's liability or fault has been determined by adjudication, alternative dispute resolution or otherwise resolved by mutual agreement between the Parties, as provided by CRS § 13-50.5-102(8)(c).

IX. MISCELLANEOUS

A. Governing Law and Venue. This Agreement shall be governed by the laws of the State of Colorado, and any legal ac5on concerning the provisions hereof shall be brought in Eagle County, Colorado.

B. No Waiver. Delays in enforcement or the waiver of any one or more defaults or breaches of this Agreement by the Town shall not cons5tute a waiver of any of the other terms or obliga5on of this Agreement.

C. Integra4on. This Agreement cons5tutes the en5re agreement between the Par5es, superseding all prior oral or wriOen communica5ons.

D. Third Par4es. There are no intended third-party beneficiaries to this Agreement.

E. No4ce. Any no5ce under this Agreement shall be in wri5ng and shall be deemed sufficient when directly presented or sent prepaid, first-class United States Mail to the Party at the address set forth on the first page of this Agreement.

F. Severability. If any provision of this Agreement is found by a court of competent jurisdic5on to be unlawful or unenforceable for any reason, the remaining provisions hereof shall remain in full force and effect.

G. Modifica4on. This Agreement may only be modified upon wriOen agreement of the Par5es.

H. Assignment. Neither this Agreement nor any of the rights or obliga5ons of the Par5es hereto, shall be assigned by either Party without the wriOen consent of the other.

I. Governmental Immunity. The Town and its officers, aOorneys and employees are relying on, and do not waive or intend to waive by any provision of this Agreement, the monetary limita5ons or any other rights, immuni5es, and protec5ons provided by the Colorado Governmental Immunity Act, CRS § 24-10-101, et seq., as amended, or otherwise available to the Town and its officers, aOorneys or employees.

J. Rights and Remedies. The rights and remedies of the Town under this Agreement are in addi5on to any other rights and remedies provided by law. The expira5on of this Agreement shall in no way limit the Town's legal or equitable remedies, or the period in which such remedies may be asserted, for work negligently or defec5vely performed.

K. Subject to Annual Appropria4on. Consistent with Ar5cle X, § 20 of the Colorado Cons5tu5on, any financial obliga5on of the Town not performed during the current fiscal year is subject to annual appropria5on, shall extend only to monies currently appropriated, and shall not cons5tute a mandatory charge, requirement, debt or liability beyond the current fiscal year.

L. Force Majeure. No Party shall be in breach of this Agreement if such Party's failure to perform any of the du5es under this Agreement is due to Force Majeure, which shall be defined as the inability to undertake or perform any of the du5es under this Agreement due to acts of God, floods, storms, fires, sabotage, terrorist aOack, strikes, riots, war, labor disputes, forces of nature, the authority and orders of government or pandemics.

IN WITNESS WHEREOF, the Par5es have executed this Agreement as of the Effec5ve Date.

TOWN OF EAGLE

ScoO Turnipseed, Mayor

ATTEST:

Jenny Rakow, Town Clerk

[INSERT CONTRACTOR NAME]

STATE OF COLORADO )

) ss.

COUNTY OF _____________ )

Subscribed, sworn to and acknowledged before me this _____ day of _______________, 2022, by _______________ as ______________________ of ______________.

My Commission expires:

(SEAL) ____________________________________

Notary Public

EXHIBIT A

SCOPE OF SERVICES

Contractor's Du5es and Deliverables

During the term of this Agreement, Contractor shall perform the following du5es, as directed by the Town:

SECTION 1 – INVITATION FOR PROPOSALS
SECTION 2 – INTRODUCTION AND BACKGROUND
SECTION 3 – TOWN OF EAGLE SYSTEM ASSESSMENT AND PLAN GOALS
SECTION 4 – SCOPE OF WORK AND DELIVERABLES
Task 1 – Project Management.
Task 2 – Resource Documents and Data Review.
Task 3 – Facilities Inventory – Existing System Description.
Task 4 – Existing Water Projects and Development Activity.
Task 5 – Update Population and Water Demand Estimates and Forecast.
Task 6 – Water Supply Analysis.
Task 7 – Evaluation of Alternative Water Sources for Use.
Task 8 – Hydraulic Modeling and Calibration.
Task 9 – System Planning and Analysis Criteria.
Task 10 – Water Storage Volume and Operational Requirements.
Task 11 – Capital Improvements Plan (CIP) Update.
Task 12 – Prepare Water Supply, System Assessment, and Treatment Master Plan Report.
Task 13 – Public Open House
Task 14 – Policy Maker Presentations & Plan Adoption.
SECTION 5 – COMPENSATION
SECTION 6 – PROPOSAL AND PROPOSER REQUIREMENTS
SELECTION PROCESS
SCHEDULE
EXISTING DOCUMENTS (available upon request)
SUBMITTAL PROCESS
TERMS AND CONDITIONS
ATTACEMENTS

File details come from the government source that posted it. Updated .